1053
|
Wednesday, August 26, 2015, 14:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Helium pressure test on TM2 HS and window lines at CS |
LD base LR 0.0xE-9 atm.cc/sec , 80 psi helium 2 minutes on HS and window circuits. No leak. Also, the reinstalled(after rewiring job) TP2 and PNG1(steers) side panel have been leak checked. No leak. |
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS |
Argon venting TM2 at CS. |
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. |
Maico and Dan moved 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam. |
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved |
Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
2117
|
Friday, July 03, 2020, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UcX#30 | UCx#30 installed onto tm4 |
UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs. |
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of TM#4 with UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have. |
Attachment 1: TM#4_UO#3_elec_check.PDF
|
|
140
|
Wednesday, July 04, 2012, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 moved from the south hot cell to the conditioning station. The fields of the module at the hot cell was 74.4 mSv/hr. |
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of the target was done at the conditioning station under vacuum, see attached file for details. |
Attachment 1: TM#4_UO#3_elec_check_under_vac.PDF
|
|
143
|
Friday, July 06, 2012, 14:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UO#3 | TM4 UO#3 target heat shield helium pressure check is done. |
Connected leak detector to TM4 and CS vacuum system. The vacuum readings on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic box) 3.9xE-6 Torr. Leak detector base pressure:6.0xE-3 torr, base leak rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight. |
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 from the conditioning station to the east target station. Move went well. |
145
|
Monday, July 09, 2012, 16:08 |
David Wang | ITE | Standard Operation | TM4 | UO#3 | ITM4 in ITE connected and pumping down |
TM4 has been moved to ITE and connected there today. I started six turbo pumps this afternoon. One of TP4 back valve (one in pairs) didn’t open .It caused the TP4 difficult to start. I disconnected that control cable that plug to solenoid valve and reconnected it. Then it works fine. After this, TP4 started to normal speed easily. The vacuum readings are OK so far. Tomorrow morning they all should be around 6-7 X E-6 torr range. Water interlock checks related to TM4 have been finished. NO water supply to ITE dump and entrance to keep the system pressure over 90psi. All TM4 water signals are good and strong by watching them from electrical panel. Gas line connected and valves opened. Control page set to fibiad . |
167
|
Tuesday, September 04, 2012, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | module move |
TM#4 with UO#3 has been moved from the east target station to the south hot cell for a target exchange. The move went well. |
173
|
Friday, September 07, 2012, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | UO#3 | Spent target move |
The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon removal from the hot cell were 42mSv/hr. See attached PDF for vault details. |
Attachment 1: Vault_Storage_September_6_2012.pdf
|
|
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo |
TM2 with no target on SW silo be electrical checked right after module moving. |
Attachment 1: TM2_electrical_check_without_UCx40_on_SW_silo.png
|
|
2238
|
Wednesday, August 04, 2021, 17:24 |
David Wang | North Hot-Cell | Standard Operation | TM2 | UCx34# | UCX 34# on TM2 electical check and HS leak check at NHC. |
The job is done with Matt at NHC. All TGHT and TBHT bolts are torque wrench tight in NHC. HS leak check result is good.
helium pressurized HS line at TCS. No leak. |
Attachment 1: UCX34_TM2_electrical_check.pdf
|
|
1980
|
Monday, September 09, 2019, 06:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | HS and window line leak check. |
TM4 HS and window line are helium pressure checked at TCS. 70 psi helium 5 minutes. No response @1.2XE-8 atm.cc/sec. They are leak free. |
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. |
TCS is argon vented. TM4 is disconnected at TCS. |
1778
|
Friday, September 07, 2018, 10:47 |
David Wang | ITE | Repair | TM4 | UCx24 | TM4 TP2 replacement |
TM4 TP2 could not be started after module was connected back to ITE on Sep 04th. It was replaced with a new pump on Sep 05th. The new pump works fine. |
1788
|
Friday, September 21, 2018, 10:06 |
David Wang | ITW | Standard Operation | TM2 | UCx23 | TM2 was disconnected in ITW. |
TM2 was disconnected in ITW this Tuesday. See attachment for checklist. |
Attachment 1: TM2_UCx_23#_disconnection_in_ITW..pdf
|
|
1309
|
Tuesday, August 09, 2016, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx17 | TM4 has been disconnected at TCS |
I stopped TCS water pumps this morning . The argon venting for TCS is in processing. |