  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system The valves #V10 & V11 beside
high active water pumps were replaced in
Target Hall, pics attached.
 v10_v11.jpgv10.jpgv11.jpg 
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD
 RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg 
  2307   Thursday, February 17, 2022, 13:24 David WangSpent Target VaultMaintenance UCx #34Repackage of UCx #34in NHC.UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive
  
  2308   Thursday, February 24, 2022, 13:23 David WangITE/ITWMaintenance  Polyurethane water cooling lines replacement in ITE and ITW. Polyurethane  water cooling lines
in ITE and ITW  HV shroud are replaced. 
Both stations Ta, Tu, MSP, HS, Coil , EE
  
  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit SwitchTwo changes have been made to the control
system to the South Hot Cell:

    Addition of two emergency
  
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. Replaced 9 old turbo pumps from ITE/ ITW
and  one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage.
  
  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair Last week we repaired
the South Hot Cell turntable chain/sprocket.
 Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg 
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault An
inspection was performed on drive systems
for the main storage vault by Dan McDonald,
 Motor_wiring_ISAC_storage_vault.jpg 
  2322   Thursday, May 19, 2022, 11:42 Travis CaveSpent Target VaultStandard Operation Sic#39, Ta#59, C#2, UC# 32 & 30Targets moved to the mini vault. Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached
 Target_Index_2022-05-19.pdfMini_Vault_Target_Index_2022-05-19.pdf 
  2324   Wednesday, May 25, 2022, 10:23 Nadia JorgensonSpent Target VaultRepair  F-308 Loading, Mini-Storage Vault Failure5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the
  
  2339   Thursday, June 23, 2022, 10:22 Travis CaveSpent Target VaultStandard Operation UC#37Spent Target Move UC#37 was placed in pail #228 and
place in spot 1B it was removed the north
hot cell. See attached PDF for more details
 Target_Index_2022-06-23.pdf 
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2344   Monday, July 04, 2022, 11:54 Nadia JorgensonSpent Target VaultMaintenance  Added Lubrication,fittings need to be changedDan lubricated components on the target
storage vault (This was an outstand task
from annual inspection). No issues on the
 Mini_Vault_Grease_Fitting.jpg 
  2345   Wednesday, July 06, 2022, 10:30 Travis CaveSpent Target VaultStandard Operation SiC#42Spent Target Move The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot
 Target_Index_2022-07-06.pdf 
  2351   Thursday, July 28, 2022, 10:47 Travis CaveSpent Target VaultStandard Operation SiC#43Spent Target Move The spent target SiC#43 was moved
from the north hot cell in pail #272 and
place in 5A of the spent target vault. See
 Target_Index_2022-07-28.pdf 
  2357   Thursday, August 18, 2022, 10:13 Travis CaveSpent Target VaultStandard Operation Ta#64Spent Target Move The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C
 Target_Index_2022-08-18.pdf 