ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection. Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates.
 2022-01-19_174.jpg2022-01-19_172.jpg 
  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target MoveThe spent Ta#63 has been moved from the north
hot cell to the spent target vault. It was
place in pail#266 and 
 Target_Index_2022-01-20.pdf 
  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional checkTH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine.
  
  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister. ITE/ITW  are cleaned with vacuum canister.
HV  cage inside and blue nylon insulators
are wiped.  Garbage inside the pits
  
  2300   Tuesday, January 25, 2022, 12:49 David WangITE/ITWStandard Operation  Target station vacuum system visual inspection. Two shielding blocks  above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and
  
  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection. Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag
  
  2302   Thursday, February 10, 2022, 11:45 David WangSpent Target VaultStandard Operation UCx#33.Spent target UCx #33 has been repacked with a new pail and lid in NHC. Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot
  
  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.   Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up
  
  2304   Thursday, February 10, 2022, 12:42 David WangITEStandard Operation  ITE HV test woithout mdoule was done.Carla
did the test. That is what she wrote in Feb
04th:  "I am done with the HV testing
  
  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system The valves #V10 & V11 beside
high active water pumps were replaced in
Target Hall, pics attached.
 v10_v11.jpgv10.jpgv11.jpg 
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD
 RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg 
  2307   Thursday, February 17, 2022, 13:24 David WangSpent Target VaultMaintenance UCx #34Repackage of UCx #34in NHC.UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive
  
  2308   Thursday, February 24, 2022, 13:23 David WangITE/ITWMaintenance  Polyurethane water cooling lines replacement in ITE and ITW. Polyurethane  water cooling lines
in ITE and ITW  HV shroud are replaced. 
Both stations Ta, Tu, MSP, HS, Coil , EE
  
  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit SwitchTwo changes have been made to the control
system to the South Hot Cell:

    Addition of two emergency
  
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. Replaced 9 old turbo pumps from ITE/ ITW
and  one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage.
  
  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair Last week we repaired
the South Hot Cell turntable chain/sprocket.
 Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg 
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault An
inspection was performed on drive systems
for the main storage vault by Dan McDonald,
 Motor_wiring_ISAC_storage_vault.jpg 