  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tension

It was noted on Nov. 9 that a squeaking noise was present when the turntable was rotated CCW with a module present.

 

Upon inspection, it appears the issue could be due to drive chain misalignment and improper tension. Furthermore, it was noted that a shaft collar on one of the existing chain tensioners was broken (a replacement was ordered).

 

Repairs will be performed on Nov. 19 to resolve these issues by re-aligning the chain, and resetting the tensioners. The turntable will be tested. This e-log will be updated once the work is complete and the system is returned to a functioning state. See Work Permit I2021-11-09--3

 

Edit, Nov. 19: the aforementioned repairs were completed and the turntable has been tested and is operating correctly. No squeaking noise is present. It is suggested to increase the diameter of the two chain tensioner shafts (and thus modify related bearing and shaft collar components) in order to prevent bending of the shaft which was observed. This will be done in the near future.

Attachment 1: PXL_20211119_190640081.jpg
PXL_20211119_190640081.jpg
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installation

A rotary limit switch was installed, attached to the shaft adjacent to the drive motor for the vertical drive system. This limit switch is not yet wired to the control system and operational - this will be done at a future date and the e-log will be updated.

Relevant electrical drawings: IRH2083 to IRH2085

 

Edit (2022-03-02): see e-log https://elog.triumf.ca/TIS/RH-ISAC/2309

Attachment 1: PXL_20211119_172142852.jpg
PXL_20211119_172142852.jpg
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004h

An issue was observed in which the target hall crane was not functioning: the N-E-S-W and up/down motions did not work, however the rotation motion did work. These symptoms were similar to what was observed in the past under https://elog.triumf.ca/TIS/RH-ISAC/2039 and https://elog.triumf.ca/TIS/RH-ISAC/1845

The crane control console was not powered (i.e. pressing the ON/OFF buttons when the selector switch was set to remote mode, even when safety conditions were met, did not enable/disable remote functionality). The power supplies were checked and everything appeared to be powered as would be expected, except for items which depended on the main contactor (O-K1) being energized. This contactor needs the PLC to be in an operational state, fault-free. The PLC was checked and the red fault light was flashing. The battery light was not on (i.e. battery was OK).

The program was re-downloaded to the PLC. During an attempt to go online with the PLC, error code 0004h appeared (see attached image for description). This is an unfamiliar error code - typically the aforementioned symptoms arise due to a battery failure and the program being lost. In this case it is uncertain at this time what the cause of this fault is. It will be monitored in the future to determine if it occurs again, and further investigation will be performed.

After re-downloading the program and placing the PLC in RUN mode, the crane was fully restored to its operating state - the main contactor was able to be energized once again. The crane was put into remote mode and a brief functionality test on the motion axes was performed: OK.

 

 

Attachment 1: Fault_code_when_connecting_Nov_22_2021.png
Fault_code_when_connecting_Nov_22_2021.png
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 Move

TM4 was moved from ITE to SHC. Shield plug installed in ITE.

  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCS

TM4 was moved from the South Hot Cell to the Conditioning Station.

  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308s

We loaded UCx #29 , SiC #38  , Ta#53, Ta#56 ,and Ta#57 from mini storage  into F308 flasks.  Later, the flasks are transferred from TH to B2 HC service area. In TH, Working area and Mini storage are cleaned and surveyed.  Tools are cleaned and surveyed as well. No contamination.   Mini- storage is empty now.

  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit.

Frank and I finished ITW and TM2 leak check. TM2 internal water-cooling lines are leak free. They passed 70 psi helium pressure test. We found some small leaks on ITW primary and secondary vacuum vessel. I list them here:

  1. Exit module 2 service cap top plate to cap body O-ring at SW corner. Leak rate 2XE-8 atm.cc/sec. It is an old leak we found before. Solution: I sprayed high vacuum resin to leak area. It is improved to 3Xe-9atm/sec now. We can leave it there.
  1. Exit module 1 module to tank flange o-ring at target module side and north side. Leak rate 3XE-8atm.cc/sec. Solution: replace the o-ring. It involves in disconnect exit module 1 and remove it out. We may or may not change it. Let's check the schedule and discuss it later. We need Travis help on module moving out.
  2. Exit module 1 north side sqaure service panel o-ring. Leak rate 2XE-7 atm.cc/sec.  Solution: replace the o-ring. It is a straight forward job.  It will be done this shut down.
  3. Exit module 1 north side round roughing valve panel o-ring. Leak rate 8XE-9 atm.cc/sec. Solution: Replace the o-ring. It involves in disconnecting and removing ITW RV4.  It could be done this shut down.
  4. Big T tank o-ring seal underneath the flange at exit 1 module north side . Leak rate 3XE-8 atm.cc/sec. Solution: None. All modules and module base flange have to been moved out to replace this big o-ring.  It is a huge project to change this o-ring .  I checked this big o-ring seal every year. It is first time a small leak is found.  Maybe, we could try high vacuum resin spray first.
  5. Dump module flange o-ring at the side by Target module. Leak rate 8XE-9 atm.cc/sec. It cannot be confirmed since the TM o-ring is just beside it. Mostly, the leak is on dump module side. We changed TM flange o-ring every year. But we never changed dump module flange o-ring in history. Many copper cooling lines above the dump module has to be removed to remove the dump module out. I do not think we have time to do it this year. Also,  the leak rate is pretty small. Maybe, we can schedule it next year.

  Most these small leaks are close to turbopumps. This could be the reason the ITW vacuum on gauges are still pretty good.

  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.

Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec.   The result:

A:   slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there. 

B:   slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.

C:  quickly response  to 3.1XE-8 atm.cc/sec and balance there.

D : slowly to 3.0X E-9 atm.cc/sec and balanced there.

All others including coil1, coil 2 ,MSP, EE, HS, window are perfectly leak tight. No response on LD.

 The leak rate on A,B,C,D are in low E-8 or E-9 atm.cc/sec range.  They should seal cooling water without leak.    No concern. 

 

  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check.

ITE primary and secondary  vacuum vessel leak check has been down.  Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak has been found on big T tank seal which is very tiny. all other seals are perfect leak free.   No concern

  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.

Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.

  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.

Frank and I replaced ITW Exit module 1 side square service panel o-ring seal. Also, The target module pit top flange o-ring seal in ITW pit is replaced.  

  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.

TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful.

  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.

Tom Gauss inspected  two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.. He certified the use of these two frames. Inspection tags have been issued and attached to frames. He has inspection record on them. See attachments.

Attachment 1: 2022-01-19_170.jpg
2022-01-19_170.jpg
Attachment 2: 2022-01-19_173.jpg
2022-01-19_173.jpg
Attachment 3: 2022-01-19_175.jpg
2022-01-19_175.jpg
Attachment 4: 2022-01-19_176.jpg
2022-01-19_176.jpg
  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection.

Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01. He certified the use of these pins and plates. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection, The inspection tag  was issued and attached to pin. Tom has an inspection record on this job. See attachments.

Attachment 1: 2022-01-19_174.jpg
2022-01-19_174.jpg
Attachment 2: 2022-01-19_172.jpg
2022-01-19_172.jpg
  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional check

TH emergency exit hatch which is located on TH west end roof is opened and closed for functional check. The hatch works fine. The limit switch on hatch is in position. No obstacle on hatch way to the roof. 

  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister.

ITE/ITW  are cleaned with vacuum canister. HV  cage inside and blue nylon insulators are wiped.  Garbage inside the pits are cleaned out.

  2300   Tuesday, January 25, 2022, 12:49 David WangITE/ITWStandard Operation  Target station vacuum system visual inspection.

Two shielding blocks  above vacuum station at TH west end were opened for inspection. Checked ITH:MP1, MP2 lubricant color and level through sight gauge on pumps. They are still ok.  Restored the shielding blocks.  Checked ITM:MP1 by decay tank (Mirror checked  sight gauge by north wall). Added lubricant to ITM:MP1 to middle level on sight gauge.  

  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection.

Tom Kauss finished target hall overhead crane annual inspection today. The crane works fine. He issued new inspection tag and e-logged the job. 

  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.

  Carla did the test. and reported the result as following: HV testing of ITW is complete. It was pretty well behaved up to 59.5kV, and sat at 59kV for 30mins with no sparks (that EPICS caught). There was some strange behaviour of the current between 51kV and 53kV - it was jumping by 20uA or more - but there didn't seem to be any voltage response, and it went away after 53kV (though it returned on the way back down). The test was done in Feb 02.

  2304   Thursday, February 10, 2022, 12:42 David WangITEStandard Operation  ITE HV test woithout mdoule was done.

Carla did the test. That is what she wrote in Feb 04th:  "I am done with the HV testing at ITE - the results were the same as at ITW. It stayed at 59kV for 30 mins with no issues. Trying to go above 59.5kV is probably possible but a bit more risky. ITE also has a band, from 54-56kV, where the current jumps around like crazy".