Monday, November 15, 2021, 12:15, Adam Newsome, South Hot-Cell, Repair, , , Squeaking noise during turntable rotation - chain misalignment and improper tension
|
It was noted on Nov. 9 that a squeaking noise was present when the turntable was rotated CCW with a module present.
Upon inspection, it appears the issue could be due to drive chain misalignment and improper tension. Furthermore, it was noted that a shaft collar |
Friday, November 19, 2021, 12:48, Adam Newsome, South Hot-Cell, Development, , , Vertical motion limit switch installation
|
A rotary limit switch was installed, attached to the shaft adjacent to the drive motor for the vertical drive system. This limit switch is not yet wired
to the control system and operational - this will be done at a future date and the e-log will be updated.
Relevant electrical drawings: IRH2083 to IRH2085 |
Monday, November 22, 2021, 12:44, Adam Newsome, Crane, Repair, , , Crane PLC Fault: 0004h
|
An issue was observed in which the target hall crane was not functioning: the N-E-S-W and up/down motions did not work, however the rotation motion did
work. These symptoms were similar to what was observed in the past under https://elog.triumf.ca/TIS/RH-ISAC/2039
and https://elog.triumf.ca/TIS/RH-ISAC/1845 |
Tuesday, November 23, 2021, 10:58, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move
|
TM4 was moved from ITE to SHC. Shield plug installed in ITE. |
Wednesday, November 24, 2021, 09:08, Adam Newsome, Conditioning Station, Standard Operation, TM4, , Remotely moved TM4 from SHC to TCS
|
TM4 was moved from the South Hot Cell to the Conditioning Station. |
Monday, November 29, 2021, 12:16, David Wang, Spent Target Vault, Standard Operation, , , Five spent targets have been loaded into F308s
|
We loaded UCx #29 , SiC #38 , Ta#53, Ta#56 ,and Ta#57 from mini storage into F308 flasks. Later, the flasks are transferred from TH
to B2 HC service area. In TH, Working area and Mini storage are cleaned and surveyed. Tools are cleaned and surveyed as well. No contamination.
Mini- storage is empty now. |
Thursday, January 06, 2022, 10:37, David Wang, ITW, Standard Operation, TM2, , ITW vacuum vessel and TM2 internal cooling lines leak check in pit.
|
Frank and I finished ITW and TM2 leak check. TM2 internal water-cooling lines are leak free. They passed 70 psi helium pressure test. We found some
small leaks on ITW primary and secondary vacuum vessel. I list them here:
Exit module 2 service cap top plate to cap body O-ring at SW corner. Leak rate 2XE-8 atm.cc/sec. It is an old leak we found |
Thursday, January 06, 2022, 13:54, David Wang, ITE, Standard Operation, TM4, , helium pressure test on TM4 internal cooloing lsine at ITE.
|
Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec. The result:
A: slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there.
B: slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there. |
Monday, January 10, 2022, 09:31, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.
|
ITE primary and secondary vacuum vessel leak check has been down. Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak
has been found on big T tank seal which is very tiny. all other seals are perfect leak free. No concern |
Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC.
|
Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful. |
Tuesday, January 11, 2022, 11:50, David Wang, ITW, Maintenance, , , ITW Exit module 1 side sqaure panel O-ing seal replacement.
|
Frank and I replaced ITW Exit module 1 side square service panel o-ring seal. Also, The target module pit top flange o-ring seal in ITW pit is replaced.
|
Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP.
|
TM2( no target ) has been moved from NHC to SMP. The moving is smooth and successful. |
Wednesday, January 19, 2022, 13:26, David Wang, Crane, Standard Operation, , , Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.   
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.. He certified the use of these two frames. Inspection
tags have been issued and attached to frames. He has inspection record on them. See attachments. |
Wednesday, January 19, 2022, 13:36, David Wang, Crane, Standard Operation, , , Targe hall crane below hook attachment pins and plates annual inspection. 
|
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01. He certified the use of these pins and plates. The inspection
of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08. After inspection,
The inspection tag was issued and attached to pin. Tom has an inspection record on this job. See attachments. |
Monday, January 24, 2022, 11:18, David Wang, ITE/ITW, Standard Operation, , , TH emergency exit hatch functional check
|
TH emergency exit hatch which is located on TH west end roof is opened and closed for functional check. The hatch works fine. The limit switch on hatch
is in position. No obstacle on hatch way to the roof. |
Tuesday, January 25, 2022, 08:57, David Wang, ITE/ITW, Standard Operation, , , ITE/ITW have been cleaned with vacuum canister.
|
ITE/ITW are cleaned with vacuum canister. HV cage inside and blue nylon insulators are wiped. Garbage inside the pits are cleaned out.
|
Tuesday, January 25, 2022, 12:49, David Wang, ITE/ITW, Standard Operation, , , Target station vacuum system visual inspection.
|
Two shielding blocks above vacuum station at TH west end were opened for inspection. Checked ITH:MP1, MP2 lubricant color and level through sight
gauge on pumps. They are still ok. Restored the shielding blocks. Checked ITM:MP1 by decay tank (Mirror checked sight gauge by north
wall). Added lubricant to ITM:MP1 to middle level on sight gauge. |
Wednesday, February 02, 2022, 11:05, David Wang, Crane, Standard Operation, , , Target hall overhand crane annual insepection.
|
Tom Kauss finished target hall overhead crane annual inspection today. The crane works fine. He issued new inspection tag and e-logged the job.
|
Thursday, February 10, 2022, 12:24, David Wang, ITW, Standard Operation, , , ITW HV test without mdoule.
|
Carla did the test. and reported the result as following: HV testing of ITW is complete. It was pretty well behaved up to 59.5kV, and sat at
59kV for 30mins with no sparks (that EPICS caught). There was some strange behaviour of the current between 51kV and 53kV - it was jumping by 20uA or
more - but there didn't seem to be any voltage response, and it went away after 53kV (though it returned on the way back down). The test was done in Feb |
Thursday, February 10, 2022, 12:42, David Wang, ITE, Standard Operation, , , ITE HV test woithout mdoule was done.
|
Carla did the test. That is what she wrote in Feb 04th: "I am done with the HV testing at ITE - the
results were the same as at ITW. It stayed at 59kV for 30 mins with no issues. Trying to go above 59.5kV is probably possible but a bit more risky. ITE
also has a band, from 54-56kV, where the current jumps around like crazy". |
|