147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
1476
|
Tuesday, April 04, 2017, 14:39 |
David Wang | Crane | Standard Operation | | | Crane check main hoist on jogging with shielding plug lifted. | Today, I checked TH crane main hoist
when shielding plug is installed into ITE
pit. I did some jogging actions on |
|
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage | The Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23. |
|
1667
|
Tuesday, December 19, 2017, 10:40 |
Don Jackson | Crane | Maintenance | | | Crane Power during winter break | The power to the crane and controls
were turned off using the power switch in
the Crane Control room. The main disconnect |
|
2272
|
Monday, November 22, 2021, 12:44 |
Adam Newsome | Crane | Repair | | | Crane PLC Fault: 0004h | An issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however |
|
825
|
Monday, January 05, 2015, 12:47 |
Anders Mjos | Conditioning Station | Development | TM2 | | Cooling package started | by "enable staging" button.
MP3 has to be turned off-on to open WPV1 |
|
541
|
Tuesday, November 12, 2013, 14:33 |
Bevan Moss | Conditioning Station | Repair | | | Cooling manifold returned | The cooling manifold for the conditioning
station high power water cooled lines has
been returned. The cooling package can once |
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
275
|
Monday, March 25, 2013, 09:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Cooling Package and Vacuum Stopped | The cooling package and vacuum was
stopped today at 9:26 so the module can be
move. |
|
264
|
Thursday, March 14, 2013, 10:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started | The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03. |
|
266
|
Thursday, March 14, 2013, 11:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started |
|
|
311
|
Monday, April 22, 2013, 11:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Cooling Package Started | Cooling Package was started at 9:25
this morning inlet conductivity is 0.08 Mohm
at 22.9C. Resistance reached 5.33 Mohm by |
|
514
|
Monday, October 21, 2013, 10:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Cooling On and Electrical Connections Made | The electrical connection have been
made and cooling package was started at ~10:50am
today |
|
977
|
Friday, July 03, 2015, 09:27 |
Anders Mjos | Conditioning Station | Development | | | Controls working on access control in EPICS | Some reboots will be done. |
|
774
|
Wednesday, October 22, 2014, 13:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Controls upgrade on TCS | See work
permit for details |
|
1870
|
Tuesday, February 19, 2019, 10:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Containment box removed | Containment box has been removed from TM2
in preparation for source tray removal. I
will walk Aaron through removal of the optics |
|
336
|
Friday, May 10, 2013, 09:26 |
chad fisher | South Hot-Cell | Repair | TM3 | | Containment box reinstalled | the containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for |
|
2065
|
Friday, February 07, 2020, 08:05 |
chad fisher | South Hot-Cell | Development | TM4 | | Containment box off for IGLIS | The containment box has been removed from
TM4 in prep for the IGLIS wiring job. |
|
2197
|
Friday, March 05, 2021, 09:12 |
Matthew Gareau | North Hot-Cell | Development | TM3 | | Containment box door removal and swivel arm test | First thing I entered into the NHC to install
to the target kart mounting clip, and remove
excess tools and materials from the hotcell |
|
463
|
Wednesday, September 25, 2013, 06:59 |
maicodallavalle | South Hot-Cell | Standard Operation | TM3 | | Containment box cover | The containment box cover has had all
the bolts installed and all bolts were checked
with a mirror. TM3 has been raised and is |
|