Wednesday, November 02, 2016, 09:12, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#50, module moved
|
TM#4 with Ta#50 has been moved from the south hot cell to the conditioning station. |
Wednesday, November 02, 2016, 13:41, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been connected at TCS.
|
All turbo-pumps are started. The pumping down is good so far. |
Thursday, November 03, 2016, 08:57, David Wang, Conditioning Station, Standard Operation, TM4, , Helium pressure test on TM4 HS line at TCS
|
70 psi helium ,2minutes to TM4 HS line. LD base leak rate 0.0xE-9 atm.cc/sec. No leak. |
Thursday, November 03, 2016, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water system has been started for TM4.
|
The system works fine. All water signals to TM4 at TCS are normal. HV cover is installed on to TM4 at TCS. |
Tuesday, November 08, 2016, 07:47, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water and vacuum pumps are switched off
|
TCS is vented. TM4 is disconnected and TCS. |
Tuesday, November 15, 2016, 07:53, David Wang, Conditioning Station, Standard Operation, TM4, , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)  
|
Update TH schedules . See attachments |
Tuesday, November 22, 2016, 14:26, David Wang, Conditioning Station, Standard Operation, , , TCS vacuum pumps are switched off
|
TCS will be vented tomorrow morning for TM2 moving. |
Wednesday, November 23, 2016, 14:21, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#18, module moved
|
TM#2 with UC#18 has been moved from the south hot cell to the conditioning station. |
Wednesday, November 23, 2016, 16:21, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected.
|
All vacuum pumps have been started. Air ballast 50seconds on roughing pump. Everything is good so far. |
Thursday, November 24, 2016, 09:33, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#18, Conditioning UC#18
|
Thursday, November 24, 2016, 09:33: Water package on
Thursday, November 24, 2016, 09:43: TCS:WPV1 shows only 12% open. A visual inspection confirms the valve is fully opened. Controls will be contacted
to troubleshoot |
Thursday, November 24, 2016, 10:30, David Wang, Conditioning Station, Standard Operation, TM2, , HV cover is installed on TM2 at TCS
|
Interlock key are returned back to B2 level.TM2 is ready for HV conditioning and heating up at TCS. |
Tuesday, November 29, 2016, 06:27, David Wang, Conditioning Station, Standard Operation, TM2, , TCS water pumps are stopped
|
Argon venting on TCS and TM2 is processing |
Tuesday, November 29, 2016, 07:50, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is disconnected at TCS.
|
Argon venting is done. |
Wednesday, November 30, 2016, 16:31, David Wang, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS.
|
All water circuits are by passed on the top of TM3. Water pumps and vacuum turbo- pumps are started. Everything is ready for TM3 camera sparking check. |
Monday, December 05, 2016, 10:04, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS.
|
David Wang wrote:
All water circuits are by passed on the top of TM3. Water pumps and vacuum turbo- pumps are started. |
Friday, December 09, 2016, 18:05, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS.
|
Aurelia Laxdal wrote:
|
Wednesday, January 04, 2017, 14:27, David Wang, Conditioning Station, Standard Operation, , , started TCS vacuum pump
|
TCS TP1S has been started.
2017-01-23 afternoon: Stopped TP1S. We will use TCS to take TM2 tomorrow afternoon. |
Thursday, January 19, 2017, 10:15, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for 2017 winter shut down   
|
Updated target hall schedule for 2017 winter shut down. See attachments 1,2
Update schedule after Febiad beam schedule changed to ITE. See attachments 3,4 |
Tuesday, January 24, 2017, 15:24, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 electrical check and leack check.
|
I did electrical check before and after Fefiad target installation on TM2. The RU (coil) Is till short to 60KV as before. Other result are good. After
Febiad target is installed, Tm2 HS line is leak checked. On leak detector, base leak rate pumping down is much slow than before. The base pressure
still could be pumped down to 0.0XE-4 torr. After a long time wait, Chad and I leak checked at 2.2XE-8 atm.cc/sec base leak rate. Chad sprayed lots |
Tuesday, January 24, 2017, 15:29, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been moved to TCS .
|
I connected TCS vacuum system to TM2. The station is under roughing now. All turbo pumps will be started soon. |
|