  2100   Thursday, June 11, 2020, 11:49 David WangITEMaintenance  ITW and ITE thermocouple status.     
  2101   Thursday, June 11, 2020, 12:36 David WangSafe Module ParkingRepairTM3 TM3 containment box and service tray field measurement. At 15cm distance: Containment box   
  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service. Dan and I did the SMP annual  maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains,
  
  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systemsAn inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality
 IMG_20200626_092538.jpgIMG_20200626_093208.jpgIMG_20200626_093924.jpgIMG_20200626_093951.jpg 
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  2123   Tuesday, July 07, 2020, 17:43 Carla BabcockITEDevelopmentTM4 RF tests on new IG-LIS wiringTested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue).
  
  2125   Thursday, July 16, 2020, 10:20 Adam NewsomeSafe Module ParkingMaintenance  SMP: Annual Electrical InspectionAn electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to
  
  2126   Tuesday, July 21, 2020, 14:22 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2128   Monday, July 27, 2020, 10:00 Travis CaveSouth Hot-CellMaintenance  Entrance module move The West Entrance module has been
moved from the west target station to the
south hot cell for repairs.
  
  2129   Tuesday, July 28, 2020, 09:26 chad fisherSouth Hot-CellRepair  Entrance Module Wire ScannerEntrance module wire scanner has been replaced.
Pictures to follow.
  
  2130   Wednesday, July 29, 2020, 09:20 Travis CaveITWMaintenance  Entrance module move The West Entrance module has been
moved from the south hot cell back to the
West Target Station.
  
  2132   Thursday, August 06, 2020, 14:33 Adam NewsomeSpent Target VaultDevelopment  Safety Group Relay Interface InstallationA relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote
 IMG_20200806_091438.jpg 
  2133   Tuesday, August 18, 2020, 09:06 David WangITWStandard OperationTM2 TM2 and ITW entrance module have been disconnected in ITWTm2 and itw entrance module have been disconnected
in ITW. I will attach disconnection checklist
later. 
  
  2134   Tuesday, August 18, 2020, 09:57 Adam NewsomeConditioning StationStandard OperationTM2 TM2 Moved to Conditioning StationTM2 was moved from ITW to the Conditioning
Station. 
  
  2135   Wednesday, August 19, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard Operation  ITW Entrance Module moved to SHCITW Entrance Module was moved from west
station to South Hot Cell.
  
  2136   Monday, August 24, 2020, 10:11 Adam NewsomeITWStandard Operation  Entrance Module to ITWEntrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module,
  
  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHTArthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power
  
  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation
Left (short) is switched with bottom. So
on module:
  
  2158   Tuesday, October 27, 2020, 11:46 Matthew GareauNorth Hot-CellRepair  Ratcheting repair issues with both left and right master  

  
  2161   Thursday, November 05, 2020, 10:23 David WangSpent Target VaultStandard Operation  TM2 old source tray and TM4 optic tray in vault tray#9.TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter
  