ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1248
|
Thursday, June 02, 2016, 08:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check | Electrical check of TM#3 no target at the
south hot cell. see attached for results. |
|
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check | Electrical check done on TM#2 with Ta#48,
no target and SiC#33 the short on the coils
to 60kV is still present it is on the R-U |
  |
1304
|
Wednesday, August 03, 2016, 10:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | Electrical Check | The result of yesterdays electrical check
on TM#4 with UC#17. |
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check | Electrical check of TM#2 with the SiC#35
post beam run. See attached PDF for details. |
|
1402
|
Wednesday, November 23, 2016, 14:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#18 | Electrical Check | Results of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details. |
|
1458
|
Thursday, March 23, 2017, 09:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | test target | Electrical Check | Electrical check of the Ta test target
on TM#2 |
|
1466
|
Monday, March 27, 2017, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Did the start of the running year electrical
checks of both TM#2 and TM#4 with no target
attached to either module. TM#2 was in the |
 |
1468
|
Tuesday, March 28, 2017, 10:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | Electrical Check | Electrical check done on TM#4 with UC#19.
See attached PDF for results. |
|
1486
|
Tuesday, April 11, 2017, 11:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#51 | Electrical Check | Electrical check performed on TM#2 with
Ta#51, see attached PDF. |
|
1492
|
Wednesday, April 12, 2017, 13:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check | Electrical check of TM#3 with no target
at the south hot cell |
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check | TM#4 with UC#20 has had the electrical
check done on it at the south hot cell,
see attached for details |
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check | Electrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details. |
|
1570
|
Wednesday, June 28, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Electrical Check | Results of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum. |
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
 |
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check | The results of the electrical check of
TM#4 with UC#21 attached. |
|
1620
|
Thursday, September 21, 2017, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Electrical Check | Electrical checks of TM#2 with Ta#53 and
also with out a target. |
  |
1623
|
Friday, September 22, 2017, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Electrical check of TM#2 after the insulator
change on thursday september 21. |
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check | Electrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details. |
|
1644
|
Wednesday, October 18, 2017, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | The results of the electrical check
of TM#4 with SiC#37, see attached PDF. |
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check | The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with |
  |