Entry  Tuesday, July 21, 2020, 14:22, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then
closed with the emergency system. 
The test was successful. 
Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the west target station to the south hot cell for repairs.
Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 
Entrance module wire scanner has been replaced. Pictures to follow.
Entry  Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the south hot cell back to the West Target Station.
Entry  Thursday, August 06, 2020, 14:33, Adam Newsome, Spent Target Vault, Development, , , Safety Group Relay Interface Installation IMG_20200806_091438.jpg
A relay contact-based interface module was installed in between Safety Group's storage vault door enable junction box and Remote Handling's control module
for the vault door. 
Entry  Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW 
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. 
Entry  Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station 
TM2 was moved from ITW to the Conditioning Station. 
Entry  Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC 
ITW Entrance Module was moved from west station to South Hot Cell.
Entry  Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW 
Entrance Module was moved from South Hot Cell to ITW Station.
Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs. 
Entry  Thursday, August 27, 2020, 13:18, Anders Mjos, Conditioning Station, Maintenance, TM2, , New Power Supply installed for TGHT 
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for
remote operation and tested successfully with low current (30 A).
Entry  Tuesday, September 29, 2020, 12:12, David Wang, ITE, Repair, TM4, , TM4 steerers staus after" left " grounding issue, and first stage investigation 
 Left (short) is switched with bottom. So on module:

"Top" is still top.


"Left" is bottom
Entry  Tuesday, October 27, 2020, 11:46, Matthew Gareau, North Hot-Cell, Repair, , , Ratcheting repair issues with both left and right master  
  
The were issues with both left and right master
ratcheting;
Entry  Thursday, November 05, 2020, 10:23, David Wang, Spent Target Vault, Standard Operation, , , TM2 old source tray and TM4 optic tray in vault tray#9. 
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Entry  Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move 
TM2 has been moved from ITW to the South Hot Cell. 

Reading at ITW: 114 mSv/hr
Entry  Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move 
TM2 has been moved from the Conditioning Station to ITW. 
Entry  Wednesday, November 25, 2020, 09:05, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , Module Move 
TM3 has been moved from the Silo to the South Hot Cell.
Entry  Monday, December 07, 2020, 12:20, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move 
TM3 has been moved from the South Hot Cell to the Conditioning Station. No containment box.
Entry  Thursday, December 10, 2020, 15:07, Adam Newsome, South Hot-Cell, Development, TM3, , TM3 Move 
TM3 was remotely moved from the conditioning station to the South Hot Cell. No containment box.
Entry  Monday, December 21, 2020, 11:22, Adam Newsome, Crane, Standard Operation, , , Crane Shutdown for Power Outage 
The Target Hall Crane has been shut down in preparation for the power outage tomorrow (Dec 22). Power will be restored on Dec 23.
 
Dec 23 update: power has been restored. The crane appears to be in working condition as there is no fault indicator on the PLC.
Entry  Thursday, December 24, 2020, 09:00, Matthew Gareau, North Hot-Cell, Development, , , NHC USB connection 
24/Noc/2020
USB was discovered to be in the reverse direction and will need to be change around to become operational