  2019   Thursday, October 31, 2019, 08:49 Anders MjosConditioning StationRepair  Water leak on non-active cooling water circuitYesterday a leak was discovered in the
ISAC-I experimental hall. The leak appears
to be at the connection between the evaporator
  
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details.
 Target_Index_2019-11-08.pdf 
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault
 Target_Index_2019-11-14_Mini_Vault.pdf 
  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4BSiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. 
 Target_Index_2019-12-03.pdf 
  2037   Thursday, December 12, 2019, 14:39 Isaac EarleSafe Module ParkingDevelopment  SMP assembly shifted 1.0" northThe SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity
  
  2038   Thursday, January 02, 2020, 09:55 David WangCoolingStandard Operation  I turned on HALC water pump MP2.HALCW MP2 is switched onnow. There is a
small amount of air trapped in system. The
pump works fine.  Water level and system
  
  2039   Thursday, January 02, 2020, 10:10 David WangCraneStandard Operation  TH crane issue.Target hall crane does not work properly
after TH crane main power is switched off
during  Christmas time in control room. I
  
  2040   Friday, January 03, 2020, 13:15 Adam NewsomeCraneRepair  Target Hall Crane PLC Module/Battery ReplacementThe Target Hall Crane bridge and trolley motion
was lost after a period of the crane having
power disconnected over winter holidays.
  
  2041   Tuesday, January 07, 2020, 08:02 David WangCoolingStandard Operation  Switch on HALCW MP2HALCW MP2 is switched on this morning after
yesterday cooling tower maintenance. LALCW
P5 and P6 pumps are started by isac operator 
  
  2042   Tuesday, January 07, 2020, 09:37 David WangITWStandard Operation  5 shielding blocks are moved out of ITW top.5 shielding blocks are moved out of itw
top. 
  
  2043   Wednesday, January 08, 2020, 10:34 David WangAssembly/Bench TestDevelopment  Module lifting assembly ITA0490The second module lifting assembly ITA0490
is moved into TH and installed onto TM3 .
It will stay with TM3. I adjusted the 
  
  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.ITE water  signal interlock  
check is done.  Everything is good.
It is a annual check we do in winter shut
  
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  2052   Monday, January 27, 2020, 10:40 David WangCoolingMaintenance  ITE/ITW supply water presuure on dump circuits. With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi.  I adjusted ITW dump pressure to
  
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment
 Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf 
  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell EntryChad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using
 NHC_2020-02-27.pdf 
  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up. Using the camera,  Frank and I inspected
the broken  blades in vacuum duct bending
section. We are pretty sure some of 
  
  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without moduleITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control
  
  2078   Friday, March 06, 2020, 09:35 David WangSpent Target VaultStandard Operation SiC #39Spent target SiC#39 removal from SHC to storage vault.Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful.  Note:The small aluminum
  