Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 122 of 140  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subjectdown
  641   Monday, April 07, 2014, 11:49 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical check

Electrical test of TM#3 with TiC#4 attached. See PDF.

Attachment 1: TM#3_elec_test_TiC#4_surf.PDF
TM#3_elec_test_TiC#4_surf.PDF
  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical check

TM#4 electrical check with Ta#42 attached post beam at the south hot cell.

Attachment 1: TM4_Ta42_elec_chk_SHC_postbeam.PDF
TM4_Ta42_elec_chk_SHC_postbeam.PDF
  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

TM#1 with UC#9 electrical check see attached pdf for details.

Attachment 1: TM1_UC9_elec_chk_SHC.PDF
TM1_UC9_elec_chk_SHC.PDF
  686   Tuesday, June 24, 2014, 11:58 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical check

Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details

Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF
TM3_TiC4_elec_chk_SHC_postbeam.PDF
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical check

Electrical check of TM#3 after the insulator repair. See attached PDF for details.

Attachment 1: TM3electestsinsulrepair.PDF
TM3electestsinsulrepair.PDF
  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical check

Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached.

Attachment 1: TM3_SiC30_elecSHC.PDF
TM3_SiC30_elecSHC.PDF
Attachment 2: TM3_elecchkaftclean.PDF
TM3_elecchkaftclean.PDF
  703   Wednesday, July 16, 2014, 13:02 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

Electrical check of the TM#1 with UC#9 post beam at the south hot cell.

Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
TM1_UC9_Elecchk_postbeam.PDF
  706   Wednesday, July 16, 2014, 14:28 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43Electrical check

TM#1 with Ta#43 electrical check see attached PDF.

Attachment 1: TM1_Ta43_elec_chk_shc.PDF
TM1_Ta43_elec_chk_shc.PDF
  730   Monday, August 11, 2014, 10:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#10Electrical check

Electrical check of TM#4 with UC#10 from thursday.

Attachment 1: TM4_UC10_elec_chk_shc.PDF
TM4_UC10_elec_chk_shc.PDF
  737   Wednesday, September 03, 2014, 13:56 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical check

TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal.

Attachment 1: TM1_ZrC6_elec_chk_shc.PDF
TM1_ZrC6_elec_chk_shc.PDF
  753   Tuesday, September 23, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM4UC#10, Ta#44Electrical check

Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details.

Attachment 1: TM4_UC10_postbeam_shc.PDF
TM4_UC10_postbeam_shc.PDF
Attachment 2: TM4_Ta44_elecchk_shc.PDF
TM4_Ta44_elecchk_shc.PDF
  761   Tuesday, October 14, 2014, 11:52 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical check

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Attachment 1: TM1_ZrC6_postbeam.PDF
TM1_ZrC6_postbeam.PDF
  763   Tuesday, October 14, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical check

Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details.

Attachment 1: TM1_elec_check_no_target.PDF
TM1_elec_check_no_target.PDF
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical check

TM#1 with ThO#1 electrical check see attatched PDF for details.

Attachment 1: TM1_elec_check_ThO1_SHC.PDF
TM1_elec_check_ThO1_SHC.PDF
  794   Wednesday, November 19, 2014, 09:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#11Electrical check

TM#4 with UC#11 electrical check done. See attached PDF for the results.

Attachment 1: TM4_elec_check_UC11_SHC.PDF
TM4_elec_check_UC11_SHC.PDF
  810   Thursday, December 04, 2014, 09:54 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical check

Results of electrical check of TM#2 with no source tray and no containment box attached. See PDF for results.

Attachment 1: TM2_elec_check_no_source_traySHC.PDF
TM2_elec_check_no_source_traySHC.PDF
  870   Tuesday, March 24, 2015, 13:57 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical check

TM#4 electrical checks with and without the target installed, installed target is Ta#45.

Attachment 1: TM4_no_tgt_elec_chk_CS.PDF
TM4_no_tgt_elec_chk_CS.PDF
Attachment 2: TM4_Ta45_elec_chk_SHC.PDF
TM4_Ta45_elec_chk_SHC.PDF
  874   Thursday, March 26, 2015, 09:20 Travis CaveConditioning StationStandard OperationTM4Ta#45Electrical check

Electrical check of TM#4 with Ta#45 at the conditioning station, see attached pdf for details.

Attachment 1: TM4_Ta#45_tgt_elec_chk_CS.PDF
TM4_Ta#45_tgt_elec_chk_CS.PDF
  888   Friday, April 17, 2015, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#12Electrical check

Electrical check of TM#1 with UCx#12 attached. See attached PDF for details.

Attachment 1: TM1_UC#12_tgt_elec_chk_SHC.PDF
TM1_UC#12_tgt_elec_chk_SHC.PDF
  1106   Monday, October 19, 2015, 15:52 Anders MjosSouth Hot-CellStandard OperationTM2SiC#32Electrical and leak check

 An electrical check was completed by Travis C and Anders M. Note ~250 kOhm between Target and 60 kV common. Leak check was done by Dan M and Chad F on HS and Window circuits. No leaks found

Attachment 1: ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf
ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf
ELOG V2.9.2-2455