358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
357
|
Thursday, May 23, 2013, 09:51 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station. |
|
356
|
Wednesday, May 22, 2013, 14:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Ta#40 installed | Ta#40 has been installed.
Leak checking and high voltage tomorrow
before the move. |
|
355
|
Wednesday, May 22, 2013, 10:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south west silo to the south hot cell. |
|
354
|
Tuesday, May 21, 2013, 11:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | May 16th Long HV conditioning | On May 16th 2013 the module was HV conditioned
all day. As a result the maximum stable voltage
has been increased to about 47kV (~4kV more |
|
353
|
Tuesday, May 21, 2013, 11:38 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo. |
|
352
|
Friday, May 17, 2013, 12:02 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | | module move | TM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo. |
|
351
|
Friday, May 17, 2013, 10:04 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Manipulator has been sucessfully repaired.
Recieved 0.19 mSv. Took Approx. 10-20 minutes |
|
350
|
Wednesday, May 15, 2013, 18:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | HV test repeat | After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow. |
|
349
|
Wednesday, May 15, 2013, 17:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | | TM3 in place but not connected | To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning |
|
348
|
Wednesday, May 15, 2013, 16:51 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Repeat of HV Test | The HV test completed on Monday was
repeated today over a much longer time period.
By taking longer there was slightly less |
|
347
|
Wednesday, May 15, 2013, 16:21 |
Bevan Moss | Conditioning Station | Repair | | | BIAS Current readings off by a factor of 5 | A special thanks to Kazuya, Jane
and Ray who jumped on this issue right away!
The limit of the BIAS PS was set as 20000uA |
|
346
|
Wednesday, May 15, 2013, 10:25 |
Bevan Moss | Conditioning Station | Repair | | | ONICON flow meter | Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem |
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed | I have been getting a fault on the roof
top chiller for the 2 tandem 7.5 ton chillers.
I have checked and we have water flow and |
|
344
|
Wednesday, May 15, 2013, 10:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Preliminary Results from HV testing | Testing on TM3 without a source tray
was completed on 13/05.2013. All items were
tied to common and the water blocks were |
|
343
|
Wednesday, May 15, 2013, 10:00 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th. |
|
342
|
Monday, May 13, 2013, 15:10 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | HV Test All common |
|
|
341
|
Monday, May 13, 2013, 14:59 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | EL testing |
|
|
340
|
Friday, May 10, 2013, 14:05 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Turbo Pumps On | The turbo pumps are on. TP1 and TP2 once
again timed out and had to be restarted before
they would stay on. |
|
339
|
Friday, May 10, 2013, 11:28 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Roughing Started | Roughing on TM3 was started at 11:26am
today |
|