  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1118   Friday, November 06, 2015, 14:44 Anders MjosConditioning StationRepairTM3 O-rings replaced on service capO-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit  I2015-11-05-5
  
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at
  
  1120   Tuesday, November 10, 2015, 10:23 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service capConducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the  blue F/T insulator for
 TM3_Service_Cap_Leak.pdf 
  1121   Tuesday, November 10, 2015, 16:53 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started
 2015-11-13_TCS_TM3_FEBIAD_Test_Target.docx 
  1122   Thursday, November 12, 2015, 10:18 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service cap

    

       
            
  
  1123   Thursday, November 12, 2015, 13:25 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check and leak checkTarget to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached.  
 TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf 
  1124   Monday, November 16, 2015, 08:04 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1125   Monday, November 16, 2015, 10:09 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check after HV conditioning Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details.
 2015-11-16_TM3_Electrical_Test.pdf 
  1126   Monday, November 16, 2015, 10:33 Anders MjosConditioning StationStandard Operation FEBIAD Test TargetHV conditioning by ISAC operatorsISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry
  
  1127   Monday, November 16, 2015, 10:37 David WangConditioning StationRepairTM3 TM3 has been disconnected at TCS.I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this
  
  1128   Monday, November 16, 2015, 13:59 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved back to the NW silo.   
  1134   Wednesday, November 25, 2015, 11:55 Travis CaveConditioning StationStandard OperationTM4UC#14Module moved and electrical check.TM#4 with UC#14 was moved from the south
hot cell to the conditioning station. 
Here are the results of the electrical check
 TM4_UC14_elecchk_SHC.PDF 
  1137   Wednesday, November 25, 2015, 15:37 Anders MjosConditioning StationStandard OperationTM4UC#14Conditioning Wednesday, November 25, 2015, 15:36:
RGA on

Thursday, November 26, 2015,
  
  1138   Thursday, November 26, 2015, 06:25 David WangConditioning StationStandard OperationTM4UC#14TM4 vacuum has been connected in TCS.TM4 vacuum has been connected in TCS. All
vacuum pumps were started yesterday. The
pumping down of TM4 and TCS are good so far.
  
  1139   Thursday, November 26, 2015, 07:34 David WangConditioning StationStandard OperationTM4UC#14Helium pressure test on TM4 HS line at CS I did helium pressure test on TM4 HS line
at TCS this morning.  70psi helium 3
minutes, 0.0xE-9 atm.cc/sec base leak rate.
  
  1140   Thursday, November 26, 2015, 07:37 David WangConditioning StationStandard OperationTM4UC#14TM4 has been connected at CSTM4 has been connected at TCS. The water
system is started. The TCS HV cover for TM4
is installed also. Basically, The TM4 is
  
  1142   Monday, November 30, 2015, 11:46 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015Weekly update TH schedule according to
changes. see attachment 1,2 .
Update TH schedule before the weekend.
 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1143   Tuesday, December 01, 2015, 06:41 David WangConditioning StationStandard OperationTM4UC#14Turned off TCS all vacuum pumps and water pumps.I turned off TCS vacuum and water pumps.
The TSC and TM4 are still under vacuum condition.
  
  1145   Tuesday, December 01, 2015, 11:47 Anders MjosConditioning StationMaintenanceTM4UC#14Short on Extraction Electrode After conditioning over the weekend
the EE developed a short. This was confirmed
by measuring the resistance between EE and
  
  1148   Thursday, December 10, 2015, 13:17 Anders MjosConditioning StationStandard Operation  Blank off flangeThursday, December 10, 2015, 13:17: Roughing
Thursday, December 10, 2015, 14:56:
Started TP1S
 TCS_Blank_Off.png 