Entry  Wednesday, May 11, 2016, 13:16, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected. 
TM2 and TCS vacuum system has been connected. I started all turbo pumps. Everything is good so far.
Entry  Friday, May 13, 2016, 10:08, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 HS and window line at CS with new Lp Ta target 
These two lines are passed helium pressure test this morning. The LD base leak rate 0.0 X E-9 atm.cc/sec. The base pressure 0.0 X E-4 torr. Helium pressure
70 psi. applied helium to both line for 5minutes each. No response on LD during the test.
Entry  Friday, May 13, 2016, 10:12, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 water lines, heaters, EE, and EL are connected at TCS. 
The HV  cover is installed on to TM2 after the connections. The HV key is returned back to B2 level. The TCS Faraday cage is locked.
Entry  Monday, May 16, 2016, 10:48, Anders Mjos, Conditioning Station, Maintenance, , , Topped up water in TCS:TK2 
 Filled from 15 to 25 in
Entry  Monday, May 16, 2016, 13:26, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#48, Conditioning Ta#48 Ta#48.docx
 Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T
Monday, May 16, 2016, 15:45: Paused ramping.
Entry  Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system 
Disconnected  TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test.
Entry  Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target 
LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.

    
        
            window
 
          0.0X E-9
             
        
        
            HS
    
Entry  Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning. 
The TCS and TM2 are still under vacuum without venting
Entry  Tuesday, May 24, 2016, 10:42, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Weekly update the TH schedules. See attachments 1, 2,3.
Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf
Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z"
repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment
 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2
Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 
Bill and Yasmine did the move remotely this afternoon. The move is successful.
Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 
TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.
Entry  Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16 UC#16.docxTCS-2016-06-08_UC#16.rga
 Wednesday, June 08, 2016, 08:15: RGA on

Thursday, June 09, 2016, 09:00: Water on by David. TK2 level dropped by about 1.5 in.
Thursday, June 09, 2016, 10:30: BIAS / EL / EE to 10 / 5 / 0.5 kV
Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf
I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment
for detail.
Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 
It is ready for HV conditioning/ heating. 
Entry  Thursday, June 09, 2016, 10:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Weekly update .
Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 
The TM4 and TCS are vented with argon. 
Entry  Wednesday, July 06, 2016, 07:06, David Wang, Conditioning Station, Standard Operation, , , venting TCS with argon. 
I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon.
Entry  Wednesday, July 06, 2016, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#33, module moved 
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, July 06, 2016, 14:25, David Wang, Conditioning Station, Standard Operation, TM2, , TCS and TM2 turbo-pumps have been started. 
The TCS and TM2 are pumping down.