  1766   Tuesday, August 07, 2018, 10:44 Travis CaveSouth Hot-CellMaintenance  Entrance module move The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement.
  
  1773   Thursday, August 30, 2018, 11:13 Travis CaveSpent Target VaultStandard Operation Ta#56Spent Target Move Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault.
 Target_Index_2018-08-30.pdf 
  1777   Thursday, September 06, 2018, 10:25 Travis CaveSpent Target VaultStandard Operation SiC#34, Ta#45,46,47, 50Spent Target Move Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault.
  
  1780   Wednesday, September 12, 2018, 15:22 Isaac EarleNorth Hot-CellDevelopment  NHC air and gas supply lines - test and leak checkTesting was completed today on the NHC
air and gas supply lines.  For each
line a Staubli plug was installed on the
  
  1781   Wednesday, September 12, 2018, 15:30 Isaac EarleNorth Hot-CellDevelopment  Installation of NHC operator-level lighting completed Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801.  2" x 2"
 LEDs_and_manipulators.jpgLEDs.jpgcords.jpg 
  1782   Thursday, September 13, 2018, 16:57 Isaac EarleNorth Hot-CellDevelopment  NHC grounding and mili-ohm testing The
following equipment has been connected to
the building ground located in the Target
  
  1791   Monday, September 24, 2018, 14:50 Travis CaveSpent Target VaultStandard Operation UC#23Spent Target Move The spent UC#23 target has been moved
from the south hot cell to the spent target
storage. It was placed in pail #170 and place
  
  1794   Tuesday, September 25, 2018, 08:48 chad fisherSouth Hot-CellMaintenance  Window leak and torqueThe south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket
 hot_cell_window_gasket_change_procedure.pdf 
  1800   Friday, October 05, 2018, 14:41 Travis CaveSpent Target VaultStandard Operation UC#24Spent Target Move UC#24 has been moved from the south
hot cell to the spent target vault. The target
is in pail #171 and placed in spot 4C. See
 Target_Index_2018-10-05.pdf 
  1805   Monday, October 22, 2018, 14:05 Travis CaveITWRepair  Module move ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair.
  
  1807   Tuesday, October 23, 2018, 10:53 chad fisherSouth Hot-CellRepair  Exit 2 EastCover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far
 20181023_104541.jpg 
  1808   Tuesday, October 23, 2018, 11:32 David WangSouth Hot-CellMaintenance  ITW RV4S leak check.ITW RV4S (A and B) are leak checked. They
are good.  
  
  1809   Thursday, October 25, 2018, 11:03 chad fisherSouth Hot-CellRepair  Exit 2 WestActuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has
 8x 
  1810   Friday, October 26, 2018, 09:44 Travis CaveConditioning StationStandard Operation  Exit Module movedThe west exit #2 module has been moved from
the south hot cell to the conditioning station.
  
  1811   Monday, October 29, 2018, 10:43 David WangConditioning StationRepair  ITW exit 2 leak check at TCS.I did a leak check this morning on exit
2 module at TCS. LD base  leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00
  
  1816   Monday, November 05, 2018, 08:24 Travis CaveSpent Target VaultStandard Operation nSiC#1Spent Target Move The spent nSiC#1 target has been
moved from the south hot cell to the spent
target vault. It was placed in pail #172
 Target_Index_2018-11-02.pdf 
  1820   Thursday, November 08, 2018, 09:27 chad fisherSouth Hot-CellMaintenance  South East Manipulator cable replacementThe handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no
  
  1825   Thursday, November 22, 2018, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC design approved by High Voltage EngineerTo satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage
 NHCHV.pdf 
  1826   Monday, November 26, 2018, 12:19 chad fisherNorth Hot-CellRepair  East ManipulatorIn preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side)
 20181126_113326.jpg20181126_113338.jpg 
  1829   Wednesday, November 28, 2018, 06:39 David WangConditioning StationStandard Operation  Disconnection checklist LpTa #56TM4 was disconnected in ITE. Checklist
list in attachment.
 LpTa#56_disconnection_checklist.pdf 