1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
1749
|
Tuesday, July 03, 2018, 14:38 |
David Wang | ITW | Standard Operation | | | ITW water signals interlock check. | Annual ITW water signals interlock check
are done. Everything works good. |
|
1756
|
Thursday, July 19, 2018, 14:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals - connector and wiring details | Installation of the diagnostic connections
between the NHC hot and cold sides has been
completed. The cable bundle was prepared |
|
1760
|
Tuesday, July 31, 2018, 11:16 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22 | Spent Target Move | Yesterday the spent UC#22 target
was moved from the south hot cell to the
spent target vault. It was placed in pail |
|
1761
|
Wednesday, August 01, 2018, 09:47 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals and control panel tested | On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was |
|
1764
|
Thursday, August 02, 2018, 07:57 |
David Wang | Conditioning Station | Standard Operation | | | Leak check on TM2 UCx #23 @ TCS and SHC. | I did a helium pressure test on TM2 HS
line at TCS. At 70psi helium, the leak rate
is 2.5 xE-7 atm.cc/sec. I think this is the |
|
1765
|
Thursday, August 02, 2018, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#8 | Spent Target Move | The spent Nb#8 target was moved from
the south hot cell to the spent target vault.
It was placed in pail #168 and place in spot |
|
1766
|
Tuesday, August 07, 2018, 10:44 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement. |
|
1773
|
Thursday, August 30, 2018, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Spent Target Move | Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault. |
|
1777
|
Thursday, September 06, 2018, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34, Ta#45,46,47, 50 | Spent Target Move | Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault. |
|
1780
|
Wednesday, September 12, 2018, 15:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC air and gas supply lines - test and leak check | Testing was completed today on the NHC
air and gas supply lines. For each
line a Staubli plug was installed on the |
|
1781
|
Wednesday, September 12, 2018, 15:30 |
Isaac Earle | North Hot-Cell | Development | | | Installation of NHC operator-level lighting completed | Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801. 2" x 2" |
  |
1782
|
Thursday, September 13, 2018, 16:57 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding and mili-ohm testing | The
following equipment has been connected to
the building ground located in the Target |
|
1791
|
Monday, September 24, 2018, 14:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#23 | Spent Target Move | The spent UC#23 target has been moved
from the south hot cell to the spent target
storage. It was placed in pail #170 and place |
|
1794
|
Tuesday, September 25, 2018, 08:48 |
chad fisher | South Hot-Cell | Maintenance | | | Window leak and torque | The south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket |
|
1800
|
Friday, October 05, 2018, 14:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#24 | Spent Target Move | UC#24 has been moved from the south
hot cell to the spent target vault. The target
is in pail #171 and placed in spot 4C. See |
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move | ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair. |
|
1807
|
Tuesday, October 23, 2018, 10:53 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 East | Cover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far |
|