Entry  Wednesday, May 15, 2013, 16:21, Bevan Moss, Conditioning Station, Repair, , , BIAS Current readings off by a factor of 5 
 A special thanks to Kazuya, Jane and Ray who jumped on this issue right  away! The limit of the BIAS PS was set as 20000uA when in reality it is
4000uA. The issue has  now been corrected. Please remember to divide the current by 5 for any elogs older than this one.
Entry  Wednesday, May 15, 2013, 10:25, Bevan Moss, Conditioning Station, Repair, , , ONICON flow meter 
 Scott Adair from Riada sales came to site to complete diagnostics on the ONICON flow meter. He could not determine the problem and believes that
there was a short in the head. He has taken the flow meter for what should be warranty repair. The flow meter is for diagnostics only, the conditioning
station can still operate without it.
Entry  Wednesday, May 15, 2013, 10:20, Bevan Moss, Conditioning Station, Repair, , , Roof top chiller failed 
I have been getting a fault on the roof top chiller for the 2 tandem 7.5  ton chillers. I have checked and we have water flow and the temperatures  are
nowhere near freezing. I believe they are over heating as the fans  on that side are not coming on. The blades are free to turn by hand but  the VFD controller
keeps saying off. I have tried turning it on and off  and that also did nothing. I have contacted ESC for further advice.
Entry  Wednesday, May 15, 2013, 10:17, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Preliminary Results from HV testing module_hv_test_0KV.rgaMODULE_hv_test_42kv.rgaTM3_13052013_no_source_tray.xlsx
 Testing on TM3 without a source tray was completed on 13/05.2013. All items were tied to common and the water blocks were left open at the bottom
of the module. They were left with the quick connections at the top. The vacuum was in the low 10^-6T range so this was deemed acceptable. The cooling
lines withing the cage in the target hall were shorted so flow could continue. As you will see from the results a maximum of 44kV was achieved before a
Entry  Wednesday, May 15, 2013, 10:00, David Wang, ITE, Standard Operation, TM4, , Disconnected TM4 in ITE. 
HS had been purged. The ITE is under venting. The TM4 will be moved to SH on next Tuesday which is May 21th.
Entry  Tuesday, April 23, 2013, 11:19, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, HV Test All common TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip
 A HV test was conducted yesterday on TM3. There was no target and all items were tied to common or ground. The conductivity of the water ranged
from 7.1 to 7.5 Mohm. 40kV @ ~600uA without continuous sparking was achieved. The Strip tool was run but something went wrong with the export and the vacuum
gauge data is missing. I have attached the file for reference and the pulled data from the achiver (only logs every 300 seconds). RGA scans were taken
    Reply  Monday, May 13, 2013, 15:10, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, HV Test All common TM3_40kV_22042013.xlsx


    
        
            Bevan Moss wrote:
        
        
            
             A HV test was conducted yesterday on TM3. There was no target and all items were tied to common
Entry  Tuesday, April 23, 2013, 13:48, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, EL testing 23042013_TM3_EL_RGA.zip23042013_TM3_EL_39.csv
This morning the Einzel Lens was tested on TM3 as the intention is to reuse this piece of equipment. The EL was able to achieve 39.9kV at ~1.35mA before
a major spark happened and the power supply turned off. Also during testing the penning gauge suddenly shot up after a spark, it did not recover and had
been acting strange in previous test, it was decided to ignore its value and continue testing but it should be replaced in the future. When I went to save
    Reply  Monday, May 13, 2013, 14:59, Bevan Moss, Conditioning Station, Standard Operation, TM3, N/A, EL testing TM3_EL_39.9kV_23042013.txt


    
        
            Bevan Moss wrote:
        
        
            
            This morning the Einzel Lens was tested on TM3 as the intention is to reuse this piece of equipment.
Entry  Friday, May 10, 2013, 14:05, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Turbo Pumps On 
The turbo pumps are on. TP1 and TP2 once again timed out and had to be restarted before they would stay on.
Entry  Friday, May 10, 2013, 11:28, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, Roughing Started 
 Roughing on TM3 was started at 11:26am today
Entry  Friday, May 10, 2013, 11:11, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_chk_no_tgt_no_tray.PDF
TM#3 electrical check with no target and no source tray, see pdf.
Entry  Friday, May 10, 2013, 11:02, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target and no source tray has been moved from the south hot cell to the conditioning station.
Entry  Friday, May 10, 2013, 09:26, chad fisher, South Hot-Cell, Repair, TM3, , Containment box reinstalled IMG_1062[1].JPGIMG_1063[1].JPG
the containment box has been reinstalled onto TM3. After electrical checks it is ready to move to the conditioning station...for electrical tests.
Entry  Thursday, May 09, 2013, 14:23, chad fisher, South Hot-Cell, Repair, TM3, , Water Block Jig Removal IMG_1059[1].JPG
The source tray side of the water block jig has been removed in preparation for moving the module to the  conditioning station for electrical tests.
Entry  Thursday, May 09, 2013, 10:13, chad fisher, South Hot-Cell, Development, , , Mock-up Progress IMG_1056[1].JPGIMG_1057[1].JPGIMG_1058[1].JPG
The source tray for the mock-up has been setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the photos for the TM3 rebuild that took place in the anteroom in 09' and Maico and Dan for the support in ironing
the issues with the source tray side soldering issues.
Entry  Wednesday, May 08, 2013, 13:48, chad fisher, South Hot-Cell, Repair, TM3, , IMG wiring check 
Checks of the wiring for the IMG are complete and have passed.
Entry  Wednesday, May 08, 2013, 10:12, chad fisher, South Hot-Cell, Repair, TM3, , TM3 9 pin wiring removal IMG_1055[1].JPG
The 9 pin wiring has successfully been removed from TM3.
Entry  Tuesday, May 07, 2013, 12:07, David Wang, ITW, Standard Operation, TM1, , I moved 5 shielding blocks from ITE to ITW. 
Water interlock check  on ITW is done. All water signals are strong on EL panel.  ITW is configured to take proton beam.
Entry  Monday, May 06, 2013, 15:45, Bevan Moss, Conditioning Station, Repair, TM3, , 55 pin connector removed 20130506_55_pin_conector_removal_IMG_3530.JPG20130506_55_pin_conector_removal_IMG_3525.JPG20130506_55_pin_conector_removal_IMG_3532.JPG20130506_55_pin_conector_removal_IMG_3535.JPG
Travis and I removed the 55 pin connector from the service cap today. The feed through was left in place as a new design for the replacement has yet
to be designed. It was not possible to test if the cables could be pulled easily as I believe there is still 1 cable tie in the containment box. The wires
were cut flush with the top of the copper tube in case Chad cannot remove them via the hot cell. Other items removed include several cable ties and a clamp
Entry  Friday, May 03, 2013, 09:53, chad fisher, South Hot-Cell, Repair, TM3, , 9 pin connector wiring IMG_1047[1].JPGIMG_1048[1].JPGIMG_1050[1].JPG
With the aid of nic new manipulator snap fingers made by Maico the peek cable ties restraining the 9 pin connector wiring to the gas lines have been
cut.
Entry  Thursday, May 02, 2013, 10:09, chad fisher, South Hot-Cell, Repair, TM3, , Service tray water block leak check 
David and I preformed a helium leak check on the service tray waterblocks and verify that no damage had been done during jig installation. All 14 circuits
were checked and verified to be ok except circuit E and circuit I which were unstable when helium was applied. The resonse time on E and I would suggest
that it is an issue with the bungs that were used and not the braze joint however.