1037
|
Thursday, August 13, 2015, 17:17 |
David Wang | Conditioning Station | Repair | TM2 | Dummy target | TM2 at CS | TM2 has been moved to CS. All turbo-pumps
have been started. The pumping down is good
so far. I connected the leak detector |
|
1038
|
Friday, August 14, 2015, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | Started CS water package for TM2 | I finished the rest TM2 connections to
CS, and started CS cooling package. Everything
works fine so far. |
|
1039
|
Monday, August 17, 2015, 10:44 |
Anders Mjos | Conditioning Station | Development | TM2 | LP-FEBIAD Test Target (empty) | Conditioning TM2 Source Tray with FEBIAD test target | TGHT, TBHT, ANODE and COIL power tested
(some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE |
 |
1040
|
Wednesday, August 19, 2015, 14:52 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 at CS | During the TM2 HV test at CS, It failed.
In order to confirm there is no any water
leak inside the module after the heaters |
|
1041
|
Thursday, August 20, 2015, 09:38 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 was disconnected at CS | TM2 was disconnected at CS. Travis and
I did electrical check before the venting.
After,The module was vented and moved to |
|
1043
|
Thursday, August 20, 2015, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check | TM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented. |
|
1044
|
Thursday, August 20, 2015, 13:48 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - Sep 08 2015 | Weekly update target hall schedule.See
attachment 1,2
Spring and summer run is close to |
   |
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
1050
|
Wednesday, August 26, 2015, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved to the conditioning
station from the south hot cell. |
|
1051
|
Wednesday, August 26, 2015, 14:28 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Leak check on TM2 HS and windowwater line with new ZrC target at SHC | Chad and I leak checked TM2 HS and window
circuit VCR joints with ZrC target and containment
box installed at SHC. No leak has been found. |
|
1052
|
Wednesday, August 26, 2015, 14:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | TM2 and Cs vacuum sysyem has been connected at CS. | Turbo-pumps are started . The pumping down
is good so far. |
|
1053
|
Wednesday, August 26, 2015, 14:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Helium pressure test on TM2 HS and window lines at CS | LD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring |
|
1054
|
Thursday, August 27, 2015, 08:43 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower |
|
1055
|
Thursday, August 27, 2015, 10:10 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | ZrC#7 | Conditioning new Source Tray | Thursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. |
  |
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS | Argon venting TM2 at CS. |
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
1067
|
Friday, September 11, 2015, 14:31 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | ZrC#7 | Vacuum gauge and EPICS read back calibration | The corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be |
|
1076
|
Wednesday, September 23, 2015, 08:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Module moved | TM#4 with Ta#46 has been moved from the
south hot cell to the conditioning station. |
|
1077
|
Wednesday, September 23, 2015, 13:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Electrical Check | TM#4 electrical check at the conditioning
station with Ta#46 target. |
|
1078
|
Wednesday, September 23, 2015, 14:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | Helium pressure test HS line at CS with
70 psi for 2 minutes. Base leak rate
0.0xE-9atm.cc/sec. No response. The line |
|