Thursday, August 27, 2015, 10:10: Started water system. TK2 level reduced from 24.9 to 23.5 in.
IG2 not working. Force is ON.
EE in conditioning mode.
Friday, August 28, 2015, 08:39: BIAS/EL 10 / 5 kV
Friday, August 28, 2015, 08:49: BIAS/EL 20 / 10 kV
Friday, August 28, 2015, 09:18 BIAS OFF. Ramping to 200/100 A at 2/1 A/min
Friday, August 28, 2015, 15:46: Target at 76 / 38 A. Changed ramping to 100/40 at 1/0.5 A/min
Friday, August 28, 2015, 22:20: Ramping down heaters.
Saturday, August 29, 2015, 09:50: RGA off. PNG1 7.85E-6 / 5.0E-6 T (EPICS / local)
Saturday, August 29, 2015, 10:11: BIAS/EL 20 / 10 kV
Saturday, August 29, 2015, 10:28: BIAS/EL 30 / 15 kV. Some sparking around 29 kV
Saturday, August 29, 2015, 10:43: 10 min w/o sparking
Saturday, August 29, 2015, 10:55: BIAS/EL 32 / 15 kV. Small vacuum responses for every 100 V increase
Saturday, August 29, 2015, 11:03: Sparking at 33 kV
Saturday, August 29, 2015, 11:12: BIAS/EL 34 / 15 kV
Saturday, August 29, 2015, 14:22: Power has returned after site-wide power outage, but no communication with IOC yet.
Saturday, August 29, 2015, 15:13: IOC restarted.
Saturday, August 29, 2015, 15:14: Starting turbos
Saturday, August 29, 2015, 15:22: Turbos at speed.
Saturday, August 29, 2015, 15:22 : MP3 not running. Investigating
Saturday, August 29, 2015, 15:47: Reset MP3 breaker (wait 5 min for capacitors to empty)
Saturday, August 29, 2015, 15:48: Water system running
Sunday, August 30, 2015, 09:38: BIAS/EL 10 / 5 kV
Sunday, August 30, 2015, 09:54: BIAS/EL 20 / 10 kV
Sunday, August 30, 2015, 10:01: BIAS/EL 30 / 15 kV
Sunday, August 30, 2015, 10:12: No sparking
Sunday, August 30, 2015, 10:27: BIAS/EL 35 / 15 kV
Sunday, August 30, 2015, 10:37: No sparking
Sunday, August 30, 2015, 10:52: BIAS/EL 37.5 / 15 kV
Sunday, August 30, 2015, 11:00: BIAS/EL 37.5 / 20 kV. No sparks
Sunday, August 30, 2015, 11:22: BIAS/EL 40 / 20 kV
Sunday, August 30, 2015, 11:34: No sparks
Sunday, August 30, 2015, 12:00: BIAS/EL 42 / 21 kV
Sunday, August 30, 2015, 12:32: Sparking at 43.5 kV. Tripped off PS on conductivity (spark response)
Sunday, August 30, 2015, 12:44: BIAS/EL 40 / 20 kV. ISAC Ops will monitor over lunch
Sunday, August 30, 2015, 14:20: BIAS/EL 43 / 20 kV
Sunday, August 30, 2015, 14:41: Sparking at 43.5 kV. lowered to 43 kV
Sunday, August 30, 2015, 15:56: Sparking every 5-10 min at 43.4 kV not able to increase to 43.5 kV. Sparking is causing signal response on water conductivity and drop in IG1 and IG1S readings during sparking.
Monday, August 31, 2015, 08:33: BIAS/ EL to 40 / 20 kV in 9 min w/o any sparking
Monday, August 31, 2015, 08:44: No sparking
Monday, August 31, 2015, 08:46: BIAS/ EL to 42 / 20 kV
Monday, August 31, 2015, 08:53: BIAS/EL 43 / 20 kV. Two vacuum/current responses
Monday, August 31, 2015, 09:47: BIAS off to investigate spakring.
David observed sparking coming from under the HV cover on TM2 twice. When the cover was removed, spark marks on a rubber plug for the water lines was observed. The plug with marks and one more plug was removed from the service cap as it is not used. See attached PDF.
Monday, August 31, 2015, 10:09: BIAS/ EL to 40 / 20 kV in 8 min w/o any sparking
Monday, August 31, 2015, 10:15 BIAS/EL 43.5 / 22 kV. One small spark
Monday, August 31, 2015, 10:30: No sparks
Monday, August 31, 2015, 10:35: BIAS/EL 44 / 22 kV.
Monday, August 31, 2015, 11:00: BIAS/EL 45 / 22 kV.
Monday, August 31, 2015, 11:31: PNG1 taken out by a spark
Monday, August 31, 2015, 12:04: Reset power to PNG1 controller. PNG1 back online.
Monday, August 31, 2015, 12:25: BIAS tripped on IG1 after a spark at 47.1 kV
Monday, August 31, 2015, 12:39: BIAS/EL 47 / 24 kV. No sparks for 5 min
Monday, August 31, 2015, 12:54: PNG1 taken out by spark at 47.7 kV
Monday, August 31, 2015, 13:02: BIAS/EL 48 / 24 kV
Monday, August 31, 2015, 13:07: No sparks
Monday, August 31, 2015, 13:25: BIAS/EL 49 / 24 kV
Monday, August 31, 2015, 13:30: No sparks
Monday, August 31, 2015, 13:37: PNG1 returned after a spark
Monday, August 31, 2015, 14:06: BIAS/EL 50 / 25 kV
Monday, August 31, 2015, 14:45: No sparks.
Monday, August 31, 2015, 15:15: BIAS/EL 51 / 25 kV
Monday, August 31, 2015, 15:38: BIAS/EL 51 / 30 kV
Monday, August 31, 2015, 16:01: Tested XCB0 and YCB0 to 5 kV. Some sparking. Tested CCB0 to 4 kV. No sparking.
Monday, August 31, 2015, 16:50: No sparks for 1 hour at 51 / 30 kV.
Monday, August 31, 2015, 17:00: HV off.
Monday, August 31, 2015, 17:07: EE at 2 kV, R= 1 MOhm
Monday, August 31, 2015, 17:08 : EE off.
Monday, August 31, 2015, 17:10: Water off.
Monday, August 31, 2015, 17:12 : Vacuum gauges off. Turbos off. Roughing pump off. |
Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24: TP1S started
Tuesday, November 10, 2015, 18:30: TP1 and TP2 started
Tuesday, November 10, 2015, 18:41: All 3 turbos at speed.
Thursday, November 12, 2015, 08:30: Purged backing pump using purging function. Vacuum in backing line recovered to previous value.
Module connected for HV testing. No target heating possible. All F/Ts tied together to HV common. EZL connected.
Friday, November 13, 2015, 11:20: Started water package
Friday, November 13, 2015, 11:52: 1kV on BIAS and 1 kV on EL
Friday, November 13, 2015, 12:54: BIAS/EL 10 / 5 kV
Friday, November 13, 2015, 12:59: BIAS/EL 15 / 7.5 kV
Friday, November 13, 2015, 13:04: BIAS/EL 20 / 10 kV
Friday, November 13, 2015, 13:08 : BIAS/EL 22 / 11 kV. Some sparks.
Friday, November 13, 2015, 13:17: Sparking at 22.5 kV. Had to return to 20 kV to recover. Back at 22.5
Friday, November 13, 2015, 13:21 : BIAS/EL 24 / 12 kV.
Friday, November 13, 2015, 13:27: Heavy spakring around 24.5 kV. Had to return to 20 kV to recover.
Friday, November 13, 2015, 13:31: Attempted to increase voltage again. Sparking started around 23 kV. Had to lower to 20 kV.
Friday, November 13, 2015, 13:36: 9 sparks for the last 5 min.
Friday, November 13, 2015, 13:45: Spark rate reduced, but multiple sparks encountered again at 20.5 kV. Reduced back to 20 kV
Friday, November 13, 2015, 13:50: Increased sparking at 20 kV. Had to lower to 18 kV
Friday, November 13, 2015, 14:07: Back at 20 kV
Friday, November 13, 2015, 14:13: BIAS and EL off
Monday, November 16, 2015, 08:18: Fault on chiller. Reset chiller unit on the roof. |