Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC, Page 117 of 141
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
|
Summary
| Threaded |
Collapse
|
Expand
2820 Entries
Goto page
Previous
1
,
2
,
3
...
116
, 117,
118
...
139
,
140
,
141
Next
Monday, December 05, 2016, 10:10, David Wang, ITW, Standard Operation, TM2, , Five shielding blocks have been transferred from ITE to ITW.
Wednesday, December 18, 2024, 12:18, Adam Newsome, Spent Target Vault, Standard Operation, , , Five Pails Transferred from Main Vault to Mini Vault
Monday, July 08, 2019, 14:56, Carla Babcock, Conditioning Station, Repair, TM4, Dummy HP SIS target, First TM4 conditioning with new source tray
Thursday, March 25, 2021, 08:55, Anders Mjos, Conditioning Station, Maintenance, , , Filters inspected and cleaned on water circuit
Thursday, March 19, 2020, 15:48, Anders Mjos, Conditioning Station, Maintenance, , , Filter replacement in water system March 5th
Thursday, October 29, 2015, 13:59, Travis Cave, Spent Target Vault, Standard Operation, , , Filling F-308s
Monday, June 25, 2018, 11:31, chad fisher, South Hot-Cell, Standard Operation, , , Fields at Al cover
Thursday, October 12, 2017, 08:48, Travis Cave, Spent Target Vault, Standard Operation, , , Field measurements of the old source trays
Tuesday, January 16, 2018, 06:50, David Wang, ITE/ITW Cooling, Standard Operation, , , Field measurement on old resin tank in silo
Thursday, January 09, 2014, 11:07, chad fisher, South Hot-Cell, Maintenance, , , Field Level
Thursday, February 20, 2025, 11:29, chad fisher, South Hot-Cell, Standard Operation, , , Field Check
Monday, May 01, 2017, 08:53, chad fisher, South Hot-Cell, Repair, TM3, , Fiberglass removal
Thursday, October 31, 2019, 10:17, David Wang, Assembly/Bench Test, Maintenance, TM2, , Febiad target gas line leak check.
Monday, November 18, 2013, 11:54, Bevan Moss, Conditioning Station, Repair, TM2, , Fault on TCS Chill
Thursday, January 08, 2015, 15:24, Anders Mjos, Conditioning Station, Development, TM2, , Fault 2 on chiller unit
Wednesday, March 13, 2013, 14:30, Bevan Moss, Conditioning Station, Development, , , Faraday Cup
Tuesday, July 18, 2017, 15:04, Travis Cave, Crane, Maintenance, , , Failure of the ISAC TH Crane Rotate.
Thursday, September 12, 2024, 14:12, Adam Newsome, Waste Package/Ship, Development, , SiC#44, Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44)
Monday, June 20, 2022, 11:00, Frank Song, North Hot-Cell, Repair, TM2, SiC#42, Failed Sic#42 electrical measurement at NHC
Monday, July 07, 2014, 14:45, Grant Minor, ITE, Maintenance, TM3, SiC #30, FEBIAD gas line check
Goto page
Previous
1
,
2
,
3
...
116
, 117,
118
...
139
,
140
,
141
Next
ELOG V2.9.2-2455