Entry  Thursday, August 27, 2015, 08:43, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Electrical Check TM2_elec_chk_ZrC7_CS.PDF

Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell.

Entry  Thursday, August 27, 2015, 10:10, Anders Mjos, Conditioning Station, Standard Operation, TM2, ZrC#7, Conditioning new Source Tray 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx

Thursday, August 27, 2015, 10:10: Started water system. TK2 level reduced from 24.9 to 23.5 in. 

IG2 not working. Force is ON.


EE in conditioning mode.

 Friday, August 28, 2015, 08:39: BIAS/EL 10 / 5 kV

Friday, August 28, 2015, 08:49: BIAS/EL 20 / 10 kV

Friday, August 28, 2015, 09:18 BIAS OFF. Ramping to 200/100 A at 2/1 A/min

Friday, August 28, 2015, 15:46: Target at 76 / 38 A. Changed ramping to 100/40 at 1/0.5 A/min

Friday, August 28, 2015, 22:20: Ramping down heaters.


Saturday, August 29, 2015, 09:50: RGA off. PNG1 7.85E-6 / 5.0E-6 T (EPICS / local)

Saturday, August 29, 2015, 10:11: BIAS/EL 20 / 10 kV

Saturday, August 29, 2015, 10:28: BIAS/EL 30 / 15 kV. Some sparking around 29 kV

Saturday, August 29, 2015, 10:43: 10 min w/o sparking

Saturday, August 29, 2015, 10:55: BIAS/EL 32 / 15 kV. Small vacuum responses for every 100 V increase

Saturday, August 29, 2015, 11:03: Sparking at 33 kV

Saturday, August 29, 2015, 11:12: BIAS/EL 34 / 15 kV

Saturday, August 29, 2015, 14:22: Power has returned after site-wide power outage, but no communication with IOC yet.

Saturday, August 29, 2015, 15:13: IOC restarted.

Saturday, August 29, 2015, 15:14: Starting turbos

Saturday, August 29, 2015, 15:22: Turbos at speed.

Saturday, August 29, 2015, 15:22 : MP3 not running. Investigating

Saturday, August 29, 2015, 15:47: Reset MP3 breaker (wait 5 min for capacitors to empty)

Saturday, August 29, 2015, 15:48: Water system running


Sunday, August 30, 2015, 09:38: BIAS/EL 10 / 5 kV

Sunday, August 30, 2015, 09:54: BIAS/EL 20 / 10 kV 

Sunday, August 30, 2015, 10:01: BIAS/EL 30 / 15 kV 

Sunday, August 30, 2015, 10:12: No sparking

Sunday, August 30, 2015, 10:27: BIAS/EL 35 / 15 kV 

Sunday, August 30, 2015, 10:37: No sparking

 Sunday, August 30, 2015, 10:52:  BIAS/EL 37.5 / 15 kV 

Sunday, August 30, 2015, 11:00:  BIAS/EL 37.5 / 20 kV. No sparks

Sunday, August 30, 2015, 11:22:  BIAS/EL 40 / 20 kV 

Sunday, August 30, 2015, 11:34: No sparks

Sunday, August 30, 2015, 12:00: BIAS/EL 42 / 21 kV

Sunday, August 30, 2015, 12:32: Sparking at 43.5 kV. Tripped off PS on conductivity (spark response)

Sunday, August 30, 2015, 12:44:  BIAS/EL 40 / 20 kV. ISAC Ops will monitor over lunch

Sunday, August 30, 2015, 14:20: BIAS/EL 43 / 20 kV

Sunday, August 30, 2015, 14:41: Sparking at 43.5 kV. lowered to 43 kV

Sunday, August 30, 2015, 15:56: Sparking every 5-10 min at 43.4 kV not able to increase to 43.5 kV. Sparking is causing signal response on water conductivity and drop in IG1 and IG1S readings during sparking.


Monday, August 31, 2015, 08:33: BIAS/ EL to 40 / 20 kV in 9 min w/o any sparking

Monday, August 31, 2015, 08:44: No sparking

 Monday, August 31, 2015, 08:46: BIAS/ EL to 42 / 20 kV

Monday, August 31, 2015, 08:53: BIAS/EL 43 / 20 kV. Two vacuum/current responses

Monday, August 31, 2015, 09:47: BIAS off to investigate spakring.

David observed sparking coming from under the HV cover on TM2 twice. When the cover was removed, spark marks on a rubber plug for the water lines was observed. The plug with marks and one more plug was removed from the service cap as it is not used. See attached PDF.

Monday, August 31, 2015, 10:09: BIAS/ EL to 40 / 20 kV in 8 min w/o any sparking

Monday, August 31, 2015, 10:15 BIAS/EL 43.5 / 22 kV. One small spark

Monday, August 31, 2015, 10:30: No sparks

Monday, August 31, 2015, 10:35: BIAS/EL 44 / 22 kV.

Monday, August 31, 2015, 11:00: BIAS/EL 45 / 22 kV.

Monday, August 31, 2015, 11:31: PNG1 taken out by a spark

Monday, August 31, 2015, 12:04: Reset power to PNG1 controller. PNG1 back online.

Monday, August 31, 2015, 12:25: BIAS tripped on IG1 after a spark at 47.1 kV

Monday, August 31, 2015, 12:39: BIAS/EL 47 / 24 kV. No sparks for 5 min

Monday, August 31, 2015, 12:54: PNG1 taken out by spark at 47.7 kV

Monday, August 31, 2015, 13:02: BIAS/EL 48 / 24 kV

Monday, August 31, 2015, 13:07: No sparks

Monday, August 31, 2015, 13:25: BIAS/EL 49 / 24 kV

Monday, August 31, 2015, 13:30: No sparks

Monday, August 31, 2015, 13:37: PNG1 returned after a spark

Monday, August 31, 2015, 14:06: BIAS/EL 50 / 25 kV

Monday, August 31, 2015, 14:45: No sparks.

Monday, August 31, 2015, 15:15: BIAS/EL 51 / 25 kV

Monday, August 31, 2015, 15:38: BIAS/EL 51 / 30 kV

Monday, August 31, 2015, 16:01: Tested XCB0 and YCB0 to 5 kV. Some sparking. Tested CCB0 to 4 kV. No sparking.

Monday, August 31, 2015, 16:50: No sparks for 1 hour at 51 / 30 kV.

Monday, August 31, 2015, 17:00: HV off.

 Monday, August 31, 2015, 17:07: EE at 2 kV, R= 1 MOhm

Monday, August 31, 2015, 17:08 : EE off.

Monday, August 31, 2015, 17:10: Water off.

Monday, August 31, 2015, 17:12 : Vacuum gauges off. Turbos off. Roughing pump off.

Entry  Tuesday, September 01, 2015, 06:25, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, Argon venting TM2 at CS 

Argon venting TM2 at CS.

Entry  Tuesday, September 01, 2015, 16:55, Anders Mjos, Conditioning Station, Maintenance, , , TBHT power supply remvoed 

 The power supply is needed as a spare for the failed TGHT p/s in ITW

Entry  Friday, September 11, 2015, 14:31, Anders Mjos, Conditioning Station, Maintenance, TM2, ZrC#7, Vacuum gauge and EPICS read back calibration 

The corelation betwenn the local value on the gauge controllers and the read back valiues in EPICS was compared. Data can be found in a previous  e-log

Entry  Wednesday, September 23, 2015, 08:38, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Module moved 

TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station.

Entry  Wednesday, September 23, 2015, 13:56, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Electrical Check TM4Ta46elecchkCS.PDF

TM#4 electrical check at the conditioning station with Ta#46 target.

Entry  Wednesday, September 23, 2015, 14:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#45, Helium pressure test on TM4 HS line at CS 

Helium pressure test HS line at CS with 70 psi for 2 minutes. Base  leak rate 0.0xE-9atm.cc/sec. No response. The line is leak tight.

Entry  Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS 

TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good so far.

Entry  Thursday, September 24, 2015, 07:00, David Wang, Conditioning Station, Maintenance, TM4, Ta#46, Turned off TCS all vacuum pumps and water pumps. 

TCS:MP1 back up pressure went up too high (700mtorr).I turned off all the pumps.The TCS is under vacuum still. TCS water  package cooling fans showed error on control page.The water pumps are stopped  also.

Restarted the vacuum pumps 40 minutes after stopping. Everything is back to normal. The MP1 back up pressure need to be monitored frequently before we have a final solution on this issue.

Reset the CS cooling package on roof and restarted the water  pumps. The system is running good so far.

Entry  Thursday, September 24, 2015, 14:59, Friedhelm Ames, Conditioning Station, Standard Operation, TM4, Ta#46, start high voltage conditioning 
 
Entry  Friday, September 25, 2015, 07:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp

weekly update see attachment

Entry  Monday, September 28, 2015, 10:10, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, Switched off CS vacuum pumps and water system 

I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS.

Entry  Monday, October 05, 2015, 10:19, Anders Mjos, Conditioning Station, Maintenance, , , Chiller maintenance 

 will be performed Tuesday October 6th

Tuesday, October 06, 2015: Maintenance re-schedlued for Wednesday October 7th

Entry  Tuesday, October 13, 2015, 10:53, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp

Weekly update schedule. TM3 evaluation schedule in Nov is added.  

update the schedule after  the cancellation of TM2 from SHC to CS trip.see attachments 3,4

Entry  Thursday, November 05, 2015, 09:57, Travis Cave, Conditioning Station, Maintenance, TM3, no target, Module moved 

TM#3 has been moved from the north west silo to the conditioning station.

Entry  Friday, November 06, 2015, 14:36, Anders Mjos, Conditioning Station, Development, TM3, FEBIAD test target, Testing TM3 

Friday, November 06, 2015, 14:35: Roughing

Turbos was started around 4pm. Later it was found that the manual valve for the two turbo pumps on the service cap was closed. The valve was open and pumping resumed. The roughing vacuum was high and increased into Saturday morning. The vacuum system was switched off on Saturday.


Purged MP1 using the purging function. Performance recovered. Started rouging.

Monday, November 09, 2015, 09:18: Started TP1S

Monday, November 09, 2015, 09:22: Started TP1 and TP2

Monday, November 09, 2015, 09:33: All 3 turbos at speed


Leak found on F/T for multipin connector

Tuesday, November 10, 2015, 09:53: stopped turbos

Entry  Friday, November 06, 2015, 14:44, Anders Mjos, Conditioning Station, Repair, TM3, , O-rings replaced on service cap 

O-rings were replaced on the service cap by Anders, Maico, Aurelia and Keith under work permit  I2015-11-05-5    


 

 One of the wires for the steerers had come loose and was reattached by Maico. Photo on DocuShare

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Entry  Monday, November 09, 2015, 16:47, Anders Mjos, Conditioning Station, Maintenance, TM3, FEBIAD Test Target, Leak check of Service Cap 

Service cap leak checked this afternoon. Found multiple leaks of 10E-8 to 10E-7 range. Connected to the backing line with IG1 at ~4E-6 T, CG1A around 40 mT. Got responses around large round flange on top, rectangular side panels, water f/t on GND and water f/t on HV. Will resume leak checking tomorrow to attempt to pinpoint sources of leak more accurately.

Entry  Tuesday, November 10, 2015, 10:23, Anders Mjos, Conditioning Station, Maintenance, TM3, , Air to vacuum leak on service cap TM3_Service_Cap_Leak.pdf

Conducted a more thorough leak check this morning with Edi. He found a leak on the base of the  blue F/T insulator for the multi-pin connector (see attachment). I discovered that all the bolts could rotate freely in the threads as they were too small. The bolts were replaced. The leak rate was reduced but still significant. The o-ring will likely need to be replaced.

Tuesday, November 10, 2015, 17:00: Could not find new o-ring. Cleaned groove and o-ring and applied o-ring grease. Re-attached F/T.