1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 | TM4 was disconnected in ITE. Checklist
list in attachment. |
|
|
1833
|
Thursday, November 29, 2018, 06:38 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check TM4 UCx 26 at SHC. | Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. |
|
|
1837
|
Friday, December 07, 2018, 08:47 |
chad fisher | North Hot-Cell | Repair | | | North hot cell spare slave repair | The tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling |
|
|
1838
|
Friday, December 07, 2018, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Ariel connector test | Completed testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare; |
|
|
1839
|
Monday, December 10, 2018, 15:31 |
Isaac Earle | North Hot-Cell | Development | | | NHC remote connection testing with manipulators | The following tests have been successfully
completed using the NHC manipulators:
Ventilation pre-filter |
|
|
1841
|
Tuesday, December 18, 2018, 11:13 |
Isaac Earle | North Hot-Cell | Development | | | NHC manipulator slave-end swap, RH test, and various other work | The following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1: |
|
|
1843
|
Wednesday, January 02, 2019, 10:26 |
Anders Mjos | Conditioning Station | Standard Operation | | | Restarrted TP1S | Found pumps off after the holidays. Restarted
roughing pump and TP1S |
|
|
1844
|
Thursday, January 03, 2019, 13:30 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH:MP1 inlet pressure showed 10torr after
power outage during holiday. All ITE/W turbo-pumps
were tripped because of it. Removed one shielding |
|
|
1845
|
Thursday, January 03, 2019, 13:41 |
David Wang | Crane | Repair | | | Target hall crane PLC issue. | Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane |
|
|
1846
|
Friday, January 04, 2019, 08:48 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW. | TP1, TP2 are still connected for next week
leak check. All water lines in TM2 are purged
with 80 psi air, each for 5 minutes. |
|
|
1847
|
Friday, January 04, 2019, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC cameras tested | The NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. |
|
|
1848
|
Tuesday, January 08, 2019, 08:49 |
David Wang | ITW | Standard Operation | TM2 | | TP1 TP1 have been disconnected in ITW | Started argon venting of ITW now. |
|
|
1849
|
Wednesday, January 09, 2019, 06:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps have been stopped. | The tCS will be vented soon for TM2 move
later this week. |
|
|
1852
|
Wednesday, January 09, 2019, 13:29 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH: MP1 has been replaced due to its poor
performance. Its motor and power cable
are taken out and reused on new pump. Vacuum |
|
|
1854
|
Thursday, January 10, 2019, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is under vacum at TCS. | TCS: TP1, TP2 and TP1S are started. |
|
|
1856
|
Friday, January 11, 2019, 13:17 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 vacuum system are switched off for this Sunday power outage. | I will restart all pumps Monday morning.
|
|
|
1857
|
Friday, January 11, 2019, 13:59 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor selection decision | SMP drivetrain design work is currently
underway. Alejandro has selected a
suitable 1200:1 reducer which will give a |
|
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
|
1859
|
Friday, January 18, 2019, 10:26 |
Isaac Earle | North Hot-Cell | Development | | | NHC sealing improvements and repeat of RH test for LED lights | The following NHC development work was
completed under WP I2019-01-09-4:
Location of RH feature |
|
|
1860
|
Monday, January 21, 2019, 16:27 |
Isaac Earle | North Hot-Cell | Development | | | NHC in-cell camera wired to right side monitor | The NHC right side monitor has been
wired to display the signal from the in-cell
camera. This was tested using a snake |
|