  817   Monday, December 08, 2014, 13:52 Anders MjosConditioning StationDevelopmentTM2 Fixed - Not able to start water system

    

       
            
  
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITWFive shielding blocks are transferred to
ITW
  
  1415   Monday, December 05, 2016, 10:10 David WangITWStandard OperationTM2 Five shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam.   
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini VaultFive pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present
 MiniVault_2024-12-18.pdf 
  1947   Monday, July 08, 2019, 14:56 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetFirst TM4 conditioning with new source trayRamping up TM4 with new source tray in.
Current condition: new source tray but no
water running in lines B, D or window. Multipin
  
  2204   Thursday, March 25, 2021, 08:55 Anders MjosConditioning StationMaintenance  Filters inspected and cleaned on water circuitBy Curtis. See Work Permit I2021-03-24-1
for details.
  
  2090   Thursday, March 19, 2020, 15:48 Anders MjosConditioning StationMaintenance  Filter replacement in water system March 5thFilters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5
  
  1115   Thursday, October 29, 2015, 13:59 Travis CaveSpent Target VaultStandard Operation  Filling F-308sFive F-308s have been filled with the spent
targets. The F-308s have been moved to the
hall way between the north and south hot
  
  1740   Monday, June 25, 2018, 11:31 chad fisherSouth Hot-CellStandard Operation  Fields at Al coverThe shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel.
  
  1641   Thursday, October 12, 2017, 08:48 Travis CaveSpent Target VaultStandard Operation  Field measurements of the old source trays Field measurements were taken of
the old source trays. The old TM#2 source
tray had a minimum field value of 0.50 mSv/hr
  
  1676   Tuesday, January 16, 2018, 06:50 David WangITE/ITW CoolingStandard Operation  Field measurement on old resin tank in siloThe old resin tank has been stored in silo
since last year March.  Without crane
the tank up, We use the pole monitor measured
  
  579   Thursday, January 09, 2014, 11:07 chad fisherSouth Hot-CellMaintenance  Field LevelI have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h.
  
  2775   Thursday, February 20, 2025, 11:29 chad fisherSouth Hot-CellStandard Operation  Field CheckAfter removing the previously found extraction
electrode and other suspect components the
field at the manipulator tongs (in front
  
  1515   Monday, May 01, 2017, 08:53 chad fisherSouth Hot-CellRepairTM3 Fiberglass removalFiberglass, capton tape and tie straps
have been removed from TM3.
  
  2020   Thursday, October 31, 2019, 10:17 David WangAssembly/Bench TestMaintenanceTM2 Febiad target gas line leak check.Feibiad gas line for ITE and its adapter
fittings for TM2 are tested today by installing
them on a dummy water stem. No leak on VCO
  
  545   Monday, November 18, 2013, 11:54 Bevan MossConditioning StationRepairTM2 Fault on TCS Chill This morning when I went to start
HV conditioning CP2 and CP3 both had faults
and the temperature of the water was ~27C.
  
  832   Thursday, January 08, 2015, 15:24 Anders MjosConditioning StationDevelopmentTM2 Fault 2 on chiller unit Found both VFDs with OF3 fault (over
voltage during constant speed operation).
Thursday, January 08, 2015, 16:37:
 Capture.PNGVFD_Fault.jpg 
  259   Wednesday, March 13, 2013, 14:30 Bevan MossConditioning StationDevelopment  Faraday Cup Dave Morris and I investigated the
Faraday Cup today. It was found to be plumed
in the wrong direction (fails in). This is
  
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  