  2081   Wednesday, March 11, 2020, 10:39 Travis CaveITEMaintenance  Entrance module move

 The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion.

  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move

 The east entrance module has been moved from the south hot cell back to the east target station.

  2128   Monday, July 27, 2020, 10:00 Travis CaveSouth Hot-CellMaintenance  Entrance module move

 The West Entrance module has been moved from the west target station to the south hot cell for repairs.

  2130   Wednesday, July 29, 2020, 09:20 Travis CaveITWMaintenance  Entrance module move

 The West Entrance module has been moved from the south hot cell back to the West Target Station.

  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move

 The West Entrance module has been moved to the south hot cell for repairs.

  2199   Friday, March 12, 2021, 11:36 Travis CaveSouth Hot-CellMaintenance East Entrance ModuleEntrance module move

 The East Entrance Module has been moved from the East Target Station to the South Hot Cell.

  2201   Wednesday, March 17, 2021, 09:10 Travis CaveITEStandard Operation  Entrance module move

 The east entrance module is now back at the east target station.

  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.

Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".

 

  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up.

Using the camera,  Frank and I inspected the broken blades in vacuum duct bending section. We are pretty sure some of  the broken parts are fallen into  bottom of entrance module and vacuum vessel since the broken pars are over on the edge of bending section. The blades rotated at high speed. Basically, They were shoot to the duct opening when they were broken from the pump. Frank and I carefully swiped all broken parts  from the edges  back to center of duct first. Then, We use vacuum cleaner sucked all broken parts out of the entrance module. We can see lots aluminum dust  during the clean up. This kind of aluminum dust also could  fallen down to bottom of module and vessel.  After clean up, We inspected duct with camera. We can see all broken pieces and dust are cleaned out.  The removed broken pieces will be stored with broken pump when the vessel bottom clean up is done.

  2083   Thursday, March 12, 2020, 13:48 David WangITERepair  Entrance module TP1S broken piesces clean up.

The broken pieces in ITE entrance vacuum pit are vacuumed out.  At SHC, There are 4 pieces on module collimator block top,  wiring scanner top. Chad removed them out at SHC. Electrical check at module top is done by diagnostics group. Everything works fine.

  2136   Monday, August 24, 2020, 10:11 Adam NewsomeITWStandard Operation  Entrance Module to ITW

Entrance Module was moved from South Hot Cell to ITW Station.

Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs.

  2129   Tuesday, July 28, 2020, 09:26 chad fisherSouth Hot-CellRepair  Entrance Module Wire Scanner

Entrance module wire scanner has been replaced. Pictures to follow.

  554   Thursday, November 21, 2013, 12:12 Anders MjosSouth Hot-CellStandard OperationTM3NiO#2End of beam target inspection - ANODE does not hold 250V

The target was inspected by Chad and Anders in the Hot Cell. Electrical megger tests were done during the assembly. It was found that Insulators No 3 (ITD0311) and No 2 (ITD0310) failed to hold voltage after the run.

  [V] [kOhm]
ANODE - HS 40 21
ANODE - TGT 100 55
HS - TGT 100 55
Lid removed    
ANODE - HS 40 21
ANODE - TGT 90 41
HS - TGT 100 55
Target removed    
ANODE - HS 245 139
No 3 Ins - TBHT 0 0
No 2 Ins 110 64
No 2 Ins removed    
ANODE - HS 540 OL

EE to HS was measured OL at 1000  V.

Photos can be found on DocuShare

 

 

  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308s

Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on them when not busy with my other shutdown work. ( Cyclotron work)

  2126   Tuesday, July 21, 2020, 14:22 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test

The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.

The test was successful.

  2234   Thursday, July 15, 2021, 09:02 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test

The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.

The test was successful.

  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test

 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia Jorgenson, and Dan McDonald. The door was opened to its fully open limit, then closed with the emergency system. 

The test was successful.

  2441   Friday, May 12, 2023, 09:56 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test

 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia Jorgenson, Adam Newsome, and Jason Zhang. The door was opened to its fully open limit, then closed with the emergency system. 

The test was successful.

  2236   Friday, July 30, 2021, 16:19 Carla BabcockITERepairTM4Ta#62Electrical issues on Ta62
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.

 

A short between feedthroughs A and P developed at the end of the p2n run in this module, and was fixed by Chad prying apart the lines in the source tray with a long teflon bar. We did not take the containment box off to fix it properly for reasons of time and also potential damage to the containment box. This seemed to fix it and David measured around 13MOhms between A-P when the module was installed in ITE. To make sure we could recover if the short reappeared during the run, David did not connect the P/Q feedthrough to HV common on the module top as usual, but it was connected in the electrical room. I also unhooked the busbar from the coil power supply.

When trying to start the TGHT ramp up, it was discovered that ITE:TGHT had a fault in its readback circuit, which was showing negative voltages. Not sure how this happened, since the power supply was not used for the previous p2n run, maybe an HV spark? This supply was replaced with the spare (SN 1161-9894).

When TGHT and TBHT were able to be ramped up, we found that the tube heater voltage was increasing too much with the target current. Normally the rate of increase is about 0.0004 V per amp on TGHT. This time it was 0.004 V/A. This was causing the TBHT to be voltage limited, which I thought could be related to the AP short. So I re-wired it such that the P feedthrough (#7 in the electrical room) was disconnected from everything except it was tied to feedthrough A (#1) using a 100 Ohm resistor. This should prevent it from floating and also prevent current from going through. See documentation in the Target Records folder (https://documents.triumf.ca/docushare/dsweb/Get/Document-204373/July272021_ITETM4_electricalissues.pdf).

During the subsequent ramp up, the TGHT power supply tripped the breakers when it was at 500A, 8V. The cause of this is still uncertain, and the TBHT voltage issue persisted after the wiring change. In the interest of time we decided to stay conservative on the currents used and continue to run like this. It may also be possible that the copper block which is supposed to reference TBHT negative to HV common is not attached.

Finally ITE:EL is still not working. It shows a value on the front of the PSU but doesn't draw enough current and doesn't affect the beam. We are running without it and it will hopefully be fixed on the Aug. 4 maintenance day.

These electrical issues bear some resemblance to those with Ta61, but I don't think we ever determined the cause there.

  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Attachment 1: 20220119_080049.jpg
20220119_080049.jpg