Entry  Wednesday, March 11, 2020, 10:39, Travis Cave, ITE, Maintenance, , , Entrance module move 
 The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion.
Entry  Friday, March 13, 2020, 09:24, Travis Cave, ITE, Standard Operation, , , Entrance module move 
 The east entrance module has been moved from the south hot cell back to the east target station.
Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the west target station to the south hot cell for repairs.
Entry  Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the south hot cell back to the West Target Station.
Entry  Tuesday, September 08, 2020, 10:37, Travis Cave, ITW, Standard Operation, , no target, Entrance module move 
 The West Entrance module has been moved to the south hot cell for repairs.
Entry  Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move 
 The East Entrance Module has been moved from the East Target Station to the South Hot Cell.
Entry  Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move 
 The east entrance module is now back at the east target station.
Entry  Monday, January 22, 2024, 09:56, David Wang, ITW, Standard Operation, , , Entrance module has been connected in ITW pit. 
Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".
 
Entry  Friday, February 28, 2020, 09:36, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up.  
Using the camera,  Frank and I inspected the broken  blades in vacuum duct bending section. We are pretty sure some of  the  broken parts are
fallen into  bottom of entrance module and vacuum  vessel since the broken pars are over on the edge of bending section.  The blades rotated at high
speed. Basically, They were shoot to the duct  opening when they were broken from the pump. Frank and I carefully  swiped all broken parts  from the
Entry  Thursday, March 12, 2020, 13:48, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up. 
The broken pieces in ITE entrance vacuum pit are vacuumed out.  At SHC, There are 4 pieces on module collimator block top,  wiring scanner
top. Chad removed them out at SHC. Electrical check at module top is done by diagnostics group. Everything works fine.
Entry  Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW 
Entrance Module was moved from South Hot Cell to ITW Station.
Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs. 
Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 
Entrance module wire scanner has been replaced. Pictures to follow.
Entry  Thursday, November 21, 2013, 12:12, Anders Mjos, South Hot-Cell, Standard Operation, TM3, NiO#2, End of beam target inspection - ANODE does not hold 250V 
The target was inspected by Chad and Anders in the Hot Cell. Electrical megger tests were done during the assembly. It was found that Insulators No 3
(ITD0311) and No 2 (ITD0310) failed to hold voltage after the run.

    
        
             
            
Entry  Monday, January 20, 2014, 13:40, maicodallavalle, Spent Target Vault, Maintenance, , F-308, Empty F-308s 
Four empty F-308s just arrived back at Triumf. I moved them  from shipping to the Remote Handling Shop for service and inspection. I will work on
them when not busy with my other shutdown work. ( Cyclotron work)
Entry  Tuesday, July 21, 2020, 14:22, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then
closed with the emergency system. 
The test was successful. 
Entry  Thursday, July 15, 2021, 09:02, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
The emergency close mechanism for the Storage Vault door was tested  by Adam Newsome and Travis Cave. The door was opened to its fully open  limit, then
closed with the emergency system.
The test was successful.
Entry  Wednesday, May 11, 2022, 16:15, Nadia Jorgenson, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia
Jorgenson, and Dan McDonald. The door was opened to its fully open limit, then closed with the emergency system. 
The test was successful.
Entry  Friday, May 12, 2023, 09:56, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia
Jorgenson, Adam Newsome, and Jason Zhang. The door was opened to its fully open limit, then closed with the emergency system. 
The test was successful.
Entry  Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62 
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
 
Entry  Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target 20220119_080049.jpg
 David did electrical check after target removed from TM4 at NHC. see attachment pls.