1497
|
Thursday, April 13, 2017, 14:16 |
David Wang | Crane | Repair | | | TH crane: east side main hoist brake assembly is replaced. | Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed. |
|
|
1498
|
Wednesday, April 19, 2017, 08:29 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update in first beam week | Update schedule to show job process in
TH. See attachment 1,2. |
|
|
1499
|
Friday, April 21, 2017, 08:19 |
David Wang | Conditioning Station | Repair | | | Low frequency on TCS TGHT flow sensor. | Anders and I found a low frequency issue(13hz
only) on TCS TGHT flow sensor when doing
TM4 conditioning. By trouble shooting, We |
|
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
|
1511
|
Thursday, April 27, 2017, 16:58 |
Isaac Earle | North Hot-Cell | Development | | | Right side NHC manipulator installed | Installation of the NHC right side
manipulator was completed yesterday. The
three piece manipulator was assembled in |
|
|
1513
|
Friday, April 28, 2017, 12:04 |
Anders Mjos | Conditioning Station | Maintenance | | | MP1 problem | TCS:MP1 was tripping of intermittently
yesterday. It was found by Dave Morris that
the current sensor was not set correctly |
|
|
1516
|
Monday, May 01, 2017, 12:32 |
David Wang | Crane | Repair | | | TH crane burning smell | TH crane burning smell showed again this
morning. It appeared after 1-1.5 hours of
continuously using during the F308 flasks |
|
|
1518
|
Tuesday, May 02, 2017, 09:48 |
Isaac Earle | North Hot-Cell | Development | | | NHC polycarbonate window cover panel installed | The window cover panel has been installed
on the hot side of the NHC shielding window
according to drawing IRH1638. It was |
|
|
1519
|
Tuesday, May 02, 2017, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Targets moved | Five spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the |
|
|
1527
|
Monday, May 08, 2017, 09:49 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update weekly | Update TH schedule weekly to show the job
process. |
|
|
1528
|
Monday, May 08, 2017, 14:46 |
Travis Cave | Spent Target Vault | Maintenance | | | Mini Vault Door | Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door |
|
|
1531
|
Wednesday, May 10, 2017, 13:42 |
Anders Mjos | Conditioning Station | Repair | | | Leaky gauge at TCS:TS2 (e-fault: 9609) | Neil Wong will fix this leak tomorrow
Friday. See attached schematics for
location. |
|
|
1532
|
Wednesday, May 10, 2017, 14:00 |
Anders Mjos | South Hot-Cell | Development | | ITE-Ta-LP-FEBIAD | Test target examination | Chad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed. |
|
|
1533
|
Thursday, May 11, 2017, 16:10 |
Isaac Earle | North Hot-Cell | Development | | | NHC roof block to TH north wall gap sealed | The gap between the north face of
the NHC roof block and the target hall north
wall in the area where the NHC inlet ducting |
|
|
1534
|
Friday, May 12, 2017, 07:42 |
David Wang | Crane | Repair | | | TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. | This morning, when I prepare for today's
crane check, The crane made a very strong
noise without any load during the full speed |
|
|
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move | The spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put |
|
|
1548
|
Tuesday, May 23, 2017, 14:10 |
David Wang | ITE | Standard Operation | | | ITE water interlock check is done. | We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The |
|
|
1555
|
Friday, June 09, 2017, 11:21 |
chad fisher | North Hot-Cell | Maintenance | | | Model 'N' Slave Removal Through Roof | Isaac and Chad disengaged the slave end
of the manipulator and performed a slave
removal through the slave removal roof hatch. |
|
|
1556
|
Monday, June 12, 2017, 13:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target move | The spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot |
|
|
1558
|
Tuesday, June 13, 2017, 11:10 |
Grant Minor | Crane | Maintenance | | | ISAC THall Crane 100% / 125% Load Test Documentation - 2011 | The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North |
|