Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1450
Entry time:
Tuesday, March 14, 2017, 11:46
Author:
chad fisher
Category:
South Hot-Cell
Type:
Maintenance
Module:
Target/Number:
Subject:
'Z' motion cable dry run
Did a dry run with the latest procedure with Dan Mcdonald. Elapsed time was approximately 30 min.
ELOG V2.9.2-2455