  1497   Thursday, April 13, 2017, 14:16 David WangCraneRepair  TH crane: east side main hoist brake assembly is replaced. Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed.
  
  1498   Wednesday, April 19, 2017, 08:29 David WangConditioning StationStandard Operation  TH schedule 132 update in first beam week Update schedule to show job process in
TH. See attachment 1,2.
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  1499   Friday, April 21, 2017, 08:19 David WangConditioning StationRepair  Low frequency on TCS TGHT flow sensor.Anders and I found a low frequency issue(13hz
only) on TCS TGHT flow sensor when doing
TM4 conditioning. By trouble shooting, We
 TCS_water_lines_001.JPGTCS_water_lines_002.JPGTCS_water_lines_003.JPG 
  1503   Tuesday, April 25, 2017, 19:35 Grant MinorCraneRepair  ISAC Target Hall Crane - West Hoist Brake Rattle

Normal
0




false
false
false
  
  1511   Thursday, April 27, 2017, 16:58 Isaac EarleNorth Hot-CellDevelopment  Right side NHC manipulator installed Installation of the NHC right side
manipulator was completed yesterday.  The
three piece manipulator was assembled in
 IMG_0036.JPGIMG_0046.JPGIMG_0054.JPGCRLD-1046-B_rev_1_Installation_Removal_Manual_(July_2013).pdfManipulator_Cart_User_Manual__(CRLD-1003).pdf 
  1513   Friday, April 28, 2017, 12:04 Anders MjosConditioning StationMaintenance  MP1 problemTCS:MP1 was tripping of intermittently
yesterday. It was found by Dave Morris that
the current sensor was not set correctly
  
  1516   Monday, May 01, 2017, 12:32 David WangCraneRepair  TH crane burning smellTH crane burning smell showed again this
morning. It  appeared after 1-1.5 hours of
continuously using during the F308 flasks
  
  1518   Tuesday, May 02, 2017, 09:48 Isaac EarleNorth Hot-CellDevelopment  NHC polycarbonate window cover panel installed The window cover panel has been installed
on the hot side of the NHC shielding window
according to drawing IRH1638.  It was
 IMG_0066.JPGIMG_0068.JPGIMG_0071.JPGIMG_0074.JPGIMG_0076.JPG 
  1519   Tuesday, May 02, 2017, 13:49 Travis CaveSpent Target VaultStandard Operation  Spent Targets movedFive spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the
 Mini_Vault_Storage_May_2_2017.pdfVault_Storage_May_2_2017.pdf 
  1527   Monday, May 08, 2017, 09:49 David WangConditioning StationStandard Operation  TH schedule 132 update weeklyUpdate TH schedule weekly to show the job
process.
 Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf 
  1528   Monday, May 08, 2017, 14:46 Travis CaveSpent Target VaultMaintenance  Mini Vault Door Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door
  
  1531   Wednesday, May 10, 2017, 13:42 Anders MjosConditioning StationRepair  Leaky gauge at TCS:TS2 (e-fault: 9609) Neil Wong will fix this leak tomorrow
Friday.  See attached schematics for
location.
 IRH1056_-_Leaky_Gauge.pdf 
  1532   Wednesday, May 10, 2017, 14:00 Anders MjosSouth Hot-CellDevelopment ITE-Ta-LP-FEBIADTest target examinationChad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed.
  
  1533   Thursday, May 11, 2017, 16:10 Isaac EarleNorth Hot-CellDevelopment  NHC roof block to TH north wall gap sealed The gap between the north face of
the NHC roof block and the target hall north
wall in the area where the NHC inlet ducting
  
  1534   Friday, May 12, 2017, 07:42 David WangCraneRepair  TH crane burning smell, smoke, and big noise on east side main hoist brake assembly.This morning, when I prepare for today's
crane check,  The crane made a very strong
noise without any load during the full  speed
  
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target moveThe spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put
 Vault_Storage_May_18_2017.pdf 
  1548   Tuesday, May 23, 2017, 14:10 David WangITEStandard Operation  ITE water interlock check is done.We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The
  
  1555   Friday, June 09, 2017, 11:21 chad fisherNorth Hot-CellMaintenance  Model 'N' Slave Removal Through RoofIsaac and Chad disengaged the slave end
of the manipulator and performed a slave
removal through the slave removal roof hatch.
  
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target moveThe spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot
 Vault_Storage_June_12_2017.pdf 
  1558   Tuesday, June 13, 2017, 11:10 Grant MinorCraneMaintenance  ISAC THall Crane 100% / 125% Load Test Documentation - 2011The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North
 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG 