Entry  Thursday, April 13, 2017, 14:16, David Wang, Crane, Repair, , , TH crane: east side main hoist brake assembly is replaced.  
Gordon Crane technician Tom Kauss finished the replacement of the east side main hoist brake assembly. A new set up is installed. he adjusted gap too
close during first time try. So, the smell appeared when operate the brake. He increased the gap to a proper distance then. It looks like everything works
fine now. Still, The brake need to be tested with 10K lBS load on it. We will do the load test on next Thursday when he come here to replace west side
Entry  Wednesday, April 19, 2017, 08:29, David Wang, Conditioning Station, Standard Operation, , , TH schedule 132 update in first beam week  Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp
Update schedule to show job process in TH. See attachment 1,2.
Entry  Friday, April 21, 2017, 08:19, David Wang, Conditioning Station, Repair, , , Low frequency on TCS TGHT flow sensor. TCS_water_lines_001.JPGTCS_water_lines_002.JPGTCS_water_lines_003.JPG
Anders and I found a low frequency issue(13hz only) on TCS TGHT flow sensor when doing TM4 conditioning. By trouble shooting, We found the module water
lines are good. the restriction cause this problem in on TCS supply or return water lines to TGHT.  I switched  TGHT lines with MSP water lines. The
wheel frequency on TGHT is 67.0hz  which is pretty high. Now, MSP is using the original TGHT water  line(flow sensor frequency 13hz). Flow sensors and
Entry  Tuesday, April 25, 2017, 19:35, Grant Minor, Crane, Repair, , , ISAC Target Hall Crane - West Hoist Brake Rattle 


Normal
0




false
false
false

EN-US
X-NONE
X-NONE

Entry  Thursday, April 27, 2017, 16:58, Isaac Earle, North Hot-Cell, Development, , , Right side NHC manipulator installed IMG_0036.JPGIMG_0046.JPGIMG_0054.JPGCRLD-1046-B_rev_1_Installation_Removal_Manual_(July_2013).pdfManipulator_Cart_User_Manual__(CRLD-1003).pdf
 Installation of the NHC right side manipulator was completed yesterday.  The three piece manipulator was assembled in the module assembly
area on the manipulator cart which was then craned through the hatch to the NHC service area (the slave end had to be removed for it to fit through the
hatch).  The installation went relatively smoothly except for the second (cold side) piece of lead shielding around the thru tube which would not
Entry  Friday, April 28, 2017, 12:04, Anders Mjos, Conditioning Station, Maintenance, , , MP1 problem 
TCS:MP1 was tripping of intermittently yesterday. It was found by Dave Morris that the current sensor was not set correctly causing the pump on status
to flicker at times. Dave adjusted the settings yesterday. The system should be operational and is currently running normally.
Entry  Monday, May 01, 2017, 12:32, David Wang, Crane, Repair, , , TH crane burning smell 
TH crane burning smell showed again this morning. It  appeared after 1-1.5 hours of continuously using during the F308 flasks  moving in TH.After a certain
time of using I think the brake gap is  reduced because of  thermal expansion. The main hoist and brakes work  fine still. We knew these brakes gap
are tight especially on west side.  So, It is not surprised that this burning smell appeared again. It does  not affect the safe of crane use in my view.
Entry  Tuesday, May 02, 2017, 09:48, Isaac Earle, North Hot-Cell, Development, , , NHC polycarbonate window cover panel installed IMG_0066.JPGIMG_0068.JPGIMG_0071.JPGIMG_0074.JPGIMG_0076.JPG
 The window cover panel has been installed on the hot side of the NHC shielding window according to drawing IRH1638.  It was necessary to drill
and tap a hole in the steel frame first to achieve proper grounding for stud welding.  The strength of all studs were checked by installing a nut
on the stud tightened against a block up against the steel frame, which was then torqued to a minimum of 10 ft*lbs.  For the final installation the
Entry  Tuesday, May 02, 2017, 13:49, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Targets moved Mini_Vault_Storage_May_2_2017.pdfVault_Storage_May_2_2017.pdf
Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for
the list of targets in the mini vault, and the new status of the storage vault.
Entry  Monday, May 08, 2017, 09:49, David Wang, Conditioning Station, Standard Operation, , , TH schedule 132 update weekly Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf
Update TH schedule weekly to show the job process.
Entry  Monday, May 08, 2017, 14:46, Travis Cave, Spent Target Vault, Maintenance, , , Mini Vault Door 
 Mini Vault Door as some difficulty over coming a small hump on its track. To open the door one needs to give the door  a slight tug while
it is opening to over come this hump.
Entry  Wednesday, May 10, 2017, 13:42, Anders Mjos, Conditioning Station, Repair, , , Leaky gauge at TCS:TS2 (e-fault: 9609) IRH1056_-_Leaky_Gauge.pdf
 Neil Wong will fix this leak tomorrow Friday.  See attached schematics for location.
Entry  Wednesday, May 10, 2017, 14:00, Anders Mjos, South Hot-Cell, Development, , ITE-Ta-LP-FEBIAD, Test target examination 
Chad and Anders inspected the test target in the hot cell today. The lid had been previously removed.

    The EE looked to have performed well. 
    A piece of Ta foil was found inside the heat shield. It is not clear if this
has been there during operation or if it entered the heat shield while in the hot cell. The foil has markings which indicate that it has seen heat.
Entry  Thursday, May 11, 2017, 16:10, Isaac Earle, North Hot-Cell, Development, , , NHC roof block to TH north wall gap sealed 
 The gap between the north face of the NHC roof block and the target hall north wall in the area where the NHC inlet ducting will be installed has
been sealed with Sikaflex 1a flexible polyurethane sealant applied over foam backer-rod.
Entry  Friday, May 12, 2017, 07:42, David Wang, Crane, Repair, , , TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. 
This morning, when I prepare for today's crane check,  The crane made a very strong noise without any load during the full  speed up motion. I stopped
the crane right away, and noticed that east  side of main hoist motor area was smoking . The crane was moved to east  end. And, I climbed up to the top,
and found the smoke is coming form  brake side, and should be produced by braking. The smell is same as  before.Unless other thing is wrong,  I think
Entry  Thursday, May 18, 2017, 10:41, Travis Cave, Spent Target Vault, Standard Operation, , UC#19, Spent Target move Vault_Storage_May_18_2017.pdf
The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See
attached PDF for all vault details.
Entry  Tuesday, May 23, 2017, 14:10, David Wang, ITE, Standard Operation, , , ITE water interlock check is done. 
We do this check once a year now. Rene found a target oven reset issue during the check . He will consult with Friedhelm. The interlock check is good.
Entry  Friday, June 09, 2017, 11:21, chad fisher, North Hot-Cell, Maintenance, , , Model 'N' Slave Removal Through Roof 
Isaac and Chad disengaged the slave end of the manipulator and performed a slave removal through the slave removal roof hatch. This is part of investigation
into a 'Z' motion tape that is "rubbing" on its drum on the master side of the manipulator during manual 'Z' retraction of 'Z' extension.
This also was the first test of the concept of removing the manipulator slave through the manipulator hatch that was built into the roof.
Entry  Monday, June 12, 2017, 13:51, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target move Vault_Storage_June_12_2017.pdf
The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault.
Entry  Tuesday, June 13, 2017, 11:10, Grant Minor, Crane, Maintenance, , , ISAC THall Crane 100% / 125% Load Test Documentation - 2011 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG
The ISAC Target Hall Crane was load tested and re-certified in January 2011 prior to doing a near-capacity lift for the North Hot Cell roof structure
(IRH1112E).
Photos and documentation from Norelco is attached.