Entry  Thursday, September 12, 2013, 10:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check TM#4SiC#29FEBIADelechkpostbeam.PDF
TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details.
Entry  Thursday, September 12, 2013, 09:29, Travis Cave, ITW, Standard Operation, TM4, SiC#29, module move 
TM#4 with SiC#29 has been moved to the south hot cell move went well.
Entry  Wednesday, September 11, 2013, 15:37, Bevan Moss, South Hot-Cell, Repair, TM3, , C-Seal leak checking and repair 
 This e-log is to cover the work completed from September 9th until the 11th. 
September 9th
Today Maico completed the leak checking blank off and leak checking tool (to replace the one that was contaminated). This tool was then leak checked
Entry  Wednesday, September 11, 2013, 13:43, David Wang, Conditioning Station, Development, TM3, , Started 3 turbo pumps on CS for TM3 
TM3 has been connected in CS.Three turbo- pumps have been started. The pumping down is fine so far.
Entry  Wednesday, September 11, 2013, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved to the conditioning station from the south hot cell.
Entry  Wednesday, September 11, 2013, 09:35, David Wang, ITW, Standard Operation, TM1, UCx, 5 shielding blocks have been moved to ITW 
I moved 5 shielding blocks to ITW this morning .I checked the water signals in electrical room before the moving, and everything is fine. The argon venting
systemin ITW and electrical room is ready also.
Entry  Tuesday, September 10, 2013, 12:11, Isaac Earle, South Hot-Cell, Repair, TM3, , Module side heat shield water block polishing and blank-off installation 
 The sealing surfaces of the module side heat shield water block were polished on September 9th in the morning using Chad's polishing tool with
the following attachments:
- Scotchbrite pads  (30 seconds)  (after this step indium material from the previous seal was no longer visible on the sealing surface)
Entry  Friday, September 06, 2013, 16:41, Bevan Moss, South Hot-Cell, Development, TM3, , C-Seal crush investigation  6x
 Today Maico completed the new leak testing tool and blank off. He tested  them with C-seals without springs and all was leak tight. He then  inspected
the crushed seals and noticed that there was an area that was  crushed less on both seals (more prominent in one,  20130906_tm3sourtrayefurb_P1020975)
and that this reduced  crushed zone only appears on one side of the seal. This is similar to  the failure seen on both sets of the heat shield lines. On
    Reply  Friday, September 06, 2013, 17:50, Grant Minor, South Hot-Cell, Development, TM3, , C-Seal crush investigation  


    
        
            Bevan Moss wrote:
        
        
            
             Today Maico completed the new leak testing tool and blank off. He tested  them with C-seals without springs and
Entry  Wednesday, September 04, 2013, 19:01, Grant Minor, South Hot-Cell, Repair, TM3, , Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013) TM3_Heat_Shield_Water_Block_-_c-seal_vs_delta_seal_DRAFT_3Sept2013.pdf
Yesterday, Grant entered the Ante Room with David Wang to visually inspect the two sets of failed c-seals from the Heat Shield circuit, to remove the
second set from the Heat Shield water blocks, and to leak check the heat shield circuit with o-rings and a water-block-to-leak-detector fitting.
Some photos of the inspected seals are in the attached design review presentation.  Some unusual marks were observed on both sets of failed
Entry  Wednesday, September 04, 2013, 18:53, Grant Minor, South Hot-Cell, Repair, TM3, , Maico's measurements of new c-seals and bench-tested c-seals c-seals_GStanford_file_chronological_4Sept2013.pdfGuyStanford_cseal_file_scanned_30Aug2013.pdf
Today Maico measured the thickness of three indium-plated inconel c-seals, presumably Ultra-Seal P/N 50606.  These seals had NOT been in the Hot
Cell.
 
Entry  Wednesday, September 04, 2013, 12:21, Bevan Moss, South Hot-Cell, Repair, TM3, , Ante-room work IMG_0983.JPG
 September 3rd
David Wang and myself lowered the leak testing cart into the Ante room and prepared the ante-room for the leak testing of TM3s line. David and
Grant then entered the anteroom and inspected the old c-seal and leak tested the the heat shield line. The line pumped down to the lower limits of the
Entry  Thursday, August 29, 2013, 17:16, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 
 Today Chad entered the south hot cell on work permit 2013-08-29-3 to repair the leaking heat shield line. The heat shield line was removed from
the module and the surfaces cleaned. New C seals and spring were inserted and the line re-attached. During this time Chad also installed the new vacuum
gauge. Grant took video of this work and Keith some pictures. The video and pictures can be found on the M: drive (groups) in the RH folder. The total
    Reply  Friday, August 30, 2013, 10:27, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 


    
        
            Bevan Moss wrote:
        
        
            
             Today Chad entered the south hot cell on work permit 2013-08-29-3 to repair the leaking heat shield
       Reply  Friday, August 30, 2013, 14:55, Bevan Moss, South Hot-Cell, Repair, TM3, N/A, Heat Shield Repair 


    
        
            Bevan Moss wrote:
        
        
            
            
            
Entry  Thursday, August 29, 2013, 09:08, chad fisher, South Hot-Cell, Repair, TM3, , Heat Shield Circuit Leak 20130829_084751.jpg20130829_084754.jpg20130829_084949.jpg20130829_084957.jpg
The heat shield circuit was pressurized with air (15-20 psi) and snoop applied to the water block joint and brazes. Bubbles formed at the joint between
the two water blocks indicating that the leak is a c seal problem. Pictures attached but also on docushare Collection-11285.
    Reply  Thursday, August 29, 2013, 10:09, Bevan Moss, South Hot-Cell, Repair, TM3, , Heat Shield Circuit Leak 


    
        
            chad fisher wrote:
        
        
            
            The heat shield circuit was pressurized with air (15-20 psi) and snoop applied to the water block joint
       Reply  Thursday, August 29, 2013, 12:03, Grant Minor, South Hot-Cell, Repair, TM3, no target, Heat Shield Circuit Leak TM3_Rev_3_Heat_Shield_Water_Lines_leak_check_29Aug2013_1.jpgTM3_Rev_3_Heat_Shield_Water_Lines_leak_check_29Aug2013_2.jpgTM3_heatshield_snoop_test2_29Aug2013.pdf


    
        
            Bevan Moss wrote:
        
        
            
            
            
              
Entry  Thursday, August 29, 2013, 06:48, David Wang, Conditioning Station, Development, TM3, , TM3 leak check in CS with new source tray. TM3_leak_check_at_CS_2013__AUG_27th.pdf
A huge leak had been found on HS circuit during 60 psi helium pressurize test. Other circuits are free of obvious major leak at present .We will test
them again once the TM3 is back to CS. See attachment for details
Entry  Wednesday, August 28, 2013, 14:25, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module
ranged from 0.80 mSv/hr to 1.8mSv/hr..
Entry  Wednesday, August 28, 2013, 14:17, Travis Cave, South Hot-Cell, Standard Operation, , UC#6, Spent target move Vault_Storage_August_28_2013.pdf
Spent target move, UC#6 has been moved from the south hot cell to the target storage. The target is in pail 108 and in slot 8C of the vault. See attached
PDF for details.
Entry  Tuesday, August 27, 2013, 17:18, Grant Minor, Conditioning Station, Repair, TM3, no target, TM3 Rev 3 source tray - prelminary leak check results at CS TM3_leak_check_at_CS_27Aug2013.JPGsketch_TM3_water_feedthru_27Aug2013-1.pdf
David Wang started a helium leak check on TM3 at the CS this morning.
David will create an e-log once his check is complete, but here are the preliminary results:
- target oven +/- OK
Entry  Tuesday, August 27, 2013, 14:14, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 
TM#1 with UCx#7 has been moved from the south hot cell to the west target station.
Entry  Tuesday, August 27, 2013, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#7, Electrical check TM#1_UC#7__TgtElecChk_SHC_.PDF
TM#1 with UCx#7 electrical check, numbers look good, see PDF for details.
Entry  Tuesday, August 27, 2013, 11:54, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#6, module move 
TM#1 with UCx #6 has been moved to the south hot cell.