Monday, June 02, 2014, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#9, module move
|
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station. |
Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
|
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges. |
Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS 7x
|
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump.
|
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig |
Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS.
|
TM1 will be moved to ITW this morning. |
Thursday, June 26, 2014, 14:18, Travis Cave, Conditioning Station, Standard Operation, TM3, SiC#30, module move
|
TM#3 with SiC#30 has been moved from the south hot cell to the conditioning station. |
Friday, June 27, 2014, 10:16, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 HS water lines helium pressure test. at CS
|
TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. No response. The line is leak free. |
Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed
|
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far. I will do helium pressure test on this line at CS on next Monday. |
Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
|
I connected TM1 at CS. All turbo pumps have been started. The pumping down is good so far. |
Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS.
|
The TM1 HS line is pressure tested this morning with 70 psi helium at CS. No response has been found on leak detector. |
Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump.
|
Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW. |
Monday, July 28, 2014, 09:29, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module move
|
TM#2 has been moved from the south hot cell to the conditioning station. |
Monday, July 28, 2014, 14:37, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D)and -(C)water lines. 7x
|
- TM2 installed in Conditioning Station
- Varian Leak detector connected directly to Target Module 2 Service cap.
- Vacuum draw in Target Station with both module turbo pumps
- Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
- Since no Source tray is installed, and tube heater supply conductor is blanked off in target enclosure, it was necessary to test both supply and return points.
- For each line tested, 80 psi He was connected, and waited ~2 min to for a response on the leak detector.
- Lines tested:
- conductor D (tube heater), Supply -> no He response
- conductor D (tube heater), Return -> no He response
- conductor C (tube heater), Supply -> no He response
- conductor C (tube heater), Return -> no He response
- Based on this leak testing, both supply and return lines of conductors C & D are leak tight under 95 psi He (80 psig He supply to vacuum)
|
Monday, July 28, 2014, 14:45, David Wang, Conditioning Station, Development, TM2, , turned off TM2 and CS turbo pumps.
|
I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning. |
Wednesday, July 30, 2014, 11:51, Travis Cave, Conditioning Station, Maintenance, , , entrance module move
|
ITE Entrance module has been moved from the east station to the conditioning station. |
Thursday, August 07, 2014, 17:07, David Wang, Conditioning Station, Standard Operation, TM4, UCx #10, TM4 is connected in CS.
|
TM4 is connected at CS. All turbo pumps are started. The pumping down is good so far. |
Friday, August 08, 2014, 08:47, David Wang, Conditioning Station, Standard Operation, TM4, UCx #10, helium pressure test on TM4 HS water line at CS.   
|
Helium pressure test on TM4 HS water line at CS is finished. 80psi helium no leak. |
Monday, August 11, 2014, 10:34, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#10, module move
|
TM#4 with UC#10 has been moved from the conditioning station to the east target station. |
Monday, August 11, 2014, 14:27, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 are vented with argon and disconnected at CS.
|
TM4 are vented with argon and disconnected at CS this morning. |
Thursday, September 04, 2014, 09:45, Travis Cave, Conditioning Station, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station. |
|