Thursday, October 24, 2024, 10:37, David Wang, Conditioning Station, Standard Operation, , , TCS water system functionnal test.
|
TCS water system has been started for functional test. System parameters including pressure, all temperature sensors, flow rate sensors, resistivity
are ok. I will watch on chiller CP1/2/3 in rest of the week and make sure chiller CP1/2/ 3 auto stage in/out work fine. |
Wednesday, November 06, 2024, 16:33, David Wang, South Hot-Cell, Standard Operation, TM4, UCX46, TM4 with UCx46 electrical and leak check at SHC
|
TM4 with UCx46 electrical and leak check at SHC is done. Everything is good. |
Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged.
|
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
Friday, January 03, 2025, 10:41, David Wang, ITW, Standard Operation, TM4, UCX46, ITW primary and secondary vacuum vessel leak check for 2025 shut down
|
ITW primary and secondary vacuum vessel leak check for 2025 shut down has been done. Also,TM4 internal water line helium pressure test has been
finished. Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate o-ring under 1Xe-8 atm.cc/sec which we
knoew in past years test. resin spray on leak area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak. See attachment |
Tuesday, January 07, 2025, 12:05, David Wang, ITE, Standard Operation, TM3, UCx #47, ITE primary and secondary vacuum vessel leak check for 2025 shut down
|
ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak. The TM3 waterlines helium pressure test will be
done at TCS when module is there.
TM3 water lines helium pressure test are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector |
Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings
|
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job. |
Thursday, January 09, 2025, 11:46, David Wang, Safe Module Parking, Standard Operation, TM4, No target, SMP is under vacuum for TM4 storage during shut down.
|
SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down. |
Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47
|
TM3 UCx#47 after operation electrical check is done at SHC. The result is normal. See attachment. |
Thursday, January 16, 2025, 14:21, David Wang, Conditioning Station, Standard Operation, TM3, No target, TM3 electrical check at TCS under good vacuum 
|
A complete TM3 electrical check at TCS under good vacuum has been done. Pin 14 to 60KV only has 8K ohm on ohmmeter
check , and it's about 2Kohm @250V Megga. It's low in resistivity. The pin 14 is for thermocouples only so no big concern. The rest things are good.
See attachments. |
Tuesday, January 21, 2025, 10:46, David Wang, ITE/ITW, Standard Operation, , , ITW/ITE pit general annual cleaning up.
|
ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum cleaned. HV cage inside and blue nylon
insulators were wiped by paper. |
Tuesday, January 28, 2025, 11:47, David Wang, Conditioning Station, Standard Operation, TM3, No target, Tm3 has been moved from TCS to silo.
|
Tm3 has been moved from TCS to silo. The move is successful. |
Wednesday, January 29, 2025, 09:06, David Wang, ITE/ITW, Standard Operation, , , ITE and ITW water system paddle wheels and coils on flow sensors have been replaced
|
ITE and ITW water system paddle wheels and coils on all flow sensors in pits have been replaced. It's a SAS job. |
Thursday, January 30, 2025, 07:07, David Wang, Crane, Standard Operation, , , target hall crane annual inspection.
|
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag
has been issued for 2025. |
Thursday, January 30, 2025, 07:13, David Wang, Crane, Standard Operation, , , inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames
for 2025. Inspection tags have been issued and attached to frames. He has inspection record on them.
|
Thursday, January 30, 2025, 07:17, David Wang, Crane, Standard Operation, , , inspection of target hall crane below hook attachment pins and plates ITA6550-01.
|
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates
for year 2025. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac
Earle in 2022-Feb-08. After inspection, The inspection tag was issued. Tom has an inspection record on this job. |
Monday, February 03, 2025, 13:04, David Wang, Safe Module Parking, Maintenance, , , ITW/ITW 24VDC electrical connectors for TP BVs MRO.
|
ITW/ITW 24VDC electrical connectors for TP BVs MRO has been done. |
Monday, February 03, 2025, 13:10, David Wang, Cooling, Standard Operation, , , HALCW pump ITC:MP1 has been started.
|
HALCW pump ITC:MP1 has been started. water are supplied to both ITE and ITW system. all water signals for individual circuits work fine. no major leak
on system. Some small water seeping from small ball valve stems are found in ITW. they will be fixed soon. |
Monday, February 10, 2025, 11:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from W_S silo to SHC.
|
Remotely removed TM2 from S-W silo to SHC . Peter and I did the move. It is successful. |
Friday, February 14, 2025, 10:43, David Wang, ITW/ITE, Standard Operation, , , target pit CAD filter replacement in TH.
|
Plant Group Gabril.T organized a target pit CAD filter replacement and testing yesterday. My group helped on this job. small 3T hoist was used
for the job.Still the filter needs to be pushed manually on crane to south into position because of crane access limit on south. The replacement
job went well. Later, Gabril reported his test result is good as well. |
Friday, February 14, 2025, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from SHC to TCS.
|
TM2 has been moved from SHC to TCS successfully. Travis and I did the move. |
|