2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
|
2748
|
Tuesday, January 14, 2025, 10:00 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#47 | after operation electrical check, Tm3 UCx 47 | TM3 UCx#47 after operation electrical check
is done at SHC. The result is normal. See
attachment. |
|
|
2750
|
Thursday, January 16, 2025, 14:21 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM3 electrical check at TCS under good vacuum | A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV |
|
|
933
|
Thursday, June 04, 2015, 07:44 |
Dan McDonald | Assembly/Bench Test | Development | TM2 | | Movement of TM2 source tray to alignment area in ISAC | Once the test stand was vented and all
lines purged Anders Mjos and myself jigged
up the water blocks and proceeded to remove |
|
|
943
|
Thursday, June 11, 2015, 13:43 |
Dan McDonald | Assembly/Bench Test | Repair | TM2 | | Leak check following tweaking of cooling line gaps | Maico, Chad and I conducted a leak check
on all affected lines following tweaking
of cooling line gaps. All lines pumped down |
|
|
1108
|
Tuesday, October 20, 2015, 12:49 |
Dan McDonald | ITW | Standard Operation | | SiC#32 | Tm2 hook up In ITW | Lower and disconnect TM2 from crane in
ITW, proceed with hooking up TM2 as per checklist
with Anders. Double check flow meters and |
|
|
1112
|
Friday, October 23, 2015, 07:41 |
Dan McDonald | Spent Target Vault | Maintenance | | | F-308's | Six F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some |
|
|
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's | The five spent target F308 flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in |
|
|
1579
|
Monday, July 10, 2017, 09:09 |
Dan McDonald | North Hot-Cell | Repair | | | manipulator cart repair | A hydraulic leak was found on the
manipulator install and repair cart,
upon further investigation the cause was |
|
|
2571
|
Saturday, April 27, 2024, 09:35 |
Carla Babcock; Alexander Shkuratoff | Conditioning Station | Development | TM3 | | TM3 source and service tray testing | Saturday, April 27, 2024, 09:35 :
Started ramping up HV, EE and EL
together. First small spark at 20.5kV on |
|
|
1936
|
Monday, June 10, 2019, 08:26 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping voltage on TM4 w/o source tray | TM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC |
|
|
1938
|
Monday, June 10, 2019, 16:22 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Ramping V on TM4, no HV cover in TH | Ramped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV |
|
|
1939
|
Monday, June 10, 2019, 18:12 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Attempt to push bias > 56kV | Monday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After |
|
|
1940
|
Wednesday, June 12, 2019, 08:56 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | More TM4 conditioning without source tray | The conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit |
|
|
1947
|
Monday, July 08, 2019, 14:56 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | First TM4 conditioning with new source tray | Ramping up TM4 with new source tray in.
Current condition: new source tray but no
water running in lines B, D or window. Multipin |
|
|
1948
|
Tuesday, July 09, 2019, 09:15 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Conditioning TM4 w/ new ST up to 45kV | Left TM4 at 40kV overnight with no previous
heating. There was only one real spark which
turned off TP2 but ops turned it back on. |
|
|
1949
|
Wednesday, July 10, 2019, 11:59 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Conditioning TM4 w/ new ST up to 50kV | David raised the bias to 49.5kV. Module
is still sparking mainly on top. Humidity
is super high. |
|
|
1956
|
Monday, July 29, 2019, 16:17 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy LP SIS | New leak on EE water line while testing new In seals | Original Problem:
Leaks on the B and D copper blocks,
probably due to corrosion between the blocks |
|
|
1958
|
Tuesday, August 06, 2019, 01:13 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Checks on EE line leak fix and window line leak (not fixed) | TM4 has developed 4 leaks so far:
Line B - seems to be solved
with an indium gasket (some testing already |
|
|
1959
|
Thursday, August 08, 2019, 09:33 |
Carla Babcock | ITE | Development | TM2 | Ta#58 | TM2 HV conditioning with protons, round 1 | Starting HV tests on TM2 with 50uA of protons.
Tuesday, August 06, 2019, 03:37 :
Ramping up 500V every 2mins or so, couple |
|