ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1569   Tuesday, June 27, 2017, 14:34 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected at TCSTurbo -pumps are started . The vacuum looks
good so far.
  
  1574   Thursday, June 29, 2017, 11:55 David WangConditioning StationRepair  TCS HV cable and feed through installationJohn Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269
  
  1577   Wednesday, July 05, 2017, 15:36 Isaac EarleNorth Hot-CellDevelopment  NHC and SHC nuclear ventilation flow sensors installed Installation of new flow sensors
and transmitters for the NHC and SHC duct
lines was completed in the target hall today.
 IMG_0264.JPGIMG_0265.JPG 
  1578   Thursday, July 06, 2017, 14:23 Isaac EarleNorth Hot-CellRepair  Slave side Z motion tape snapped on NHC right side manipulatorThe NHC right side manipulator was evaluated
today to check if operation was normal through
all ranges of motion.  The manipulator
  
  1579   Monday, July 10, 2017, 09:09 Dan McDonaldNorth Hot-CellRepair  manipulator cart repairA  hydraulic leak was found on the
manipulator  install and repair cart,
upon further investigation the cause was
 IMG_2955.JPG 
  1580   Monday, July 10, 2017, 10:19 David WangConditioning StationStandard OperationTM4 Turned off TCS water systemPrepare for TM4 move tomorrow morning.   
  1582   Wednesday, July 12, 2017, 11:05 Anders MjosConditioning StationMaintenance  Testing of new high voltage cableThe target hall has been locked-out as
per Document-70039.
Forced IG1, IG1S and IG2 to switch
 2017-07-12_HV_Cable_Test.xlsx 
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  
  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon.
  
  1591   Wednesday, August 02, 2017, 15:13 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.HS line is leak checked at SHC this afternoon
by helium spay.  Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4
  
  1592   Wednesday, August 02, 2017, 15:41 Keith C NgAssembly/Bench TestDevelopment  spare source tray buildAfter re zeroing alignment telescope to
master jig and adjusted parts into place:
 
 20170802_sourcetray_RHB_8264.JPG20170802_sourcetray_RHB_8266.JPG 
  1594   Thursday, August 03, 2017, 17:08 Anders MjosConditioning StationRepairTM2 Power bump Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system
  
  1596   Wednesday, August 09, 2017, 16:39 Isaac EarleNorth Hot-CellDevelopment  NHC drain line into sump identified The NHC drain line was tested by
pouring approximately 10 gallons of water
through the drain grate at the base of the
  
  1599   Tuesday, August 15, 2017, 12:10 Isaac EarleNorth Hot-CellDevelopment  ISAC Active Sump low water level measuredThe ISAC active sump in the Active Service
Room (#002 on B2 level) was pumped out yesterday
using the standard procedure (Section 5.5.2
  
  1600   Thursday, August 17, 2017, 14:38 Isaac EarleNorth Hot-CellDevelopment  4/6 NHC roof blocks installed Roof blocks IRH1641, IRH1642, IRH1643,
and IRH1644 have been fully assembled, labeled,
and installed as per drawing IRH1652.  Fabrication
 7x 
  1601   Friday, August 25, 2017, 16:33 Anders MjosConditioning StationRepair  Testing HV after cooling line repair The BIAS voltage was brought up to
70 kV today and held there for 1h. No sparking
observed.
 2017-08-25_HV_Water_Line_Test.xlsx 
  1606   Tuesday, August 29, 2017, 08:59 David WangConditioning StationStandard OperationTM4 TM4 HS line leak checksTM4 HS line leak checks are done, at SHC
and TCS. SHC: Helium spray. TCS: Helium 
pressurize 70psi.  LD base LR 0.0 X
  
  1607   Tuesday, August 29, 2017, 09:01 David WangConditioning StationStandard OperationTM4 TM4 has been connnected at TCS.TM4 has been connected at TCS. TCS water
system has been started for TM4. TM4 and
TCS vacuum pumping down is good so far.
  
  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.Argon vent and disconnect TM4 at TCS.   
  1612   Friday, September 08, 2017, 14:08 David WangConditioning StationRepairTM3 TCS and TM3 TM3 is located at TCS and it is pumping
down now. TCS water system has been started. 
All TCS water lines for TM3 module internal
  