404
|
Monday, July 22, 2013, 15:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | HV testing update | I have fallen behind on the
HV testing that has been completed on TM3.
Data can be found on docushare in the TM3 |
|
408
|
Wednesday, July 24, 2013, 14:40 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | module move | TM#4 with SiC#29 has been moved from the
south hot cell to the conditioning station
move went well. |
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
410
|
Thursday, July 25, 2013, 09:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | Electrical check | Electrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to |
|
411
|
Thursday, July 25, 2013, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #29 | TM4 HS helium pressure test andTM4 connection at CS | Bevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec |
|
427
|
Monday, August 26, 2013, 18:26 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | | TM3 moved from Hot Cell to Conditioning Station | Target Module 3 with no target, and a partially-installed
Rev-3 source tray (no steerers connected,
no IMG connected, entrance window lines blanked |
|
431
|
Tuesday, August 27, 2013, 17:18 |
Grant Minor | Conditioning Station | Repair | TM3 | no target | TM3 Rev 3 source tray - prelminary leak check results at CS | David Wang started a helium leak check
on TM3 at the CS this morning.
David will create an e-log once his |
 |
433
|
Wednesday, August 28, 2013, 14:25 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the conditioning station to the south hot
cell. The fields observed around the containment |
|
434
|
Thursday, August 29, 2013, 06:48 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS with new source tray. | A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at |
|
448
|
Wednesday, September 11, 2013, 11:31 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved to the
conditioning station from the south hot cell. |
|
449
|
Wednesday, September 11, 2013, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | Started 3 turbo pumps on CS for TM3 | TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far. |
|
453
|
Friday, September 13, 2013, 07:49 |
David Wang | Conditioning Station | Development | TM3 | | TM3 water lines leak check at CS | I leak checked TM3 water lines at CS with
60 psi and 80psi helium. The base leak rate
is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes |
|
466
|
Wednesday, September 25, 2013, 13:48 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check | Electrical check of TM#3 in the conditioning
station under vacuum see attached PDF for
details. |
|
467
|
Thursday, September 26, 2013, 09:46 |
maicodallavalle | Conditioning Station | Repair | TM3 | | Leak check / Pressure Test | TM3 has had all of the water lines pressurized
with Helium and the Helium Leak detector
was connected to the turbo pumps. There were |
|
469
|
Thursday, September 26, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Leak check / Pressure Test |
|
|
471
|
Thursday, September 26, 2013, 14:47 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | NiO#2 | Water pumps turned on | The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station |
|
472
|
Thursday, September 26, 2013, 14:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning | The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has |
|
473
|
Thursday, September 26, 2013, 15:00 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | RGA not connecting | Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan |
|
474
|
Thursday, September 26, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning |
|
|
475
|
Friday, September 27, 2013, 10:54 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 has been moved to the south
hot cell from the conditioning station. |
|