ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  633   Wednesday, March 26, 2014, 08:36 Travis CaveConditioning StationStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from the
south hot cell to the conditioning station.
  
  634   Thursday, March 27, 2014, 10:47 Travis CaveConditioning StationStandard OperationTM4Ta#42Electrical checkTM#4 with Ta#42 in the conditioning station
under vacuum electrical check.
 TM#4_Ta42surf_electest_CS.PDF 
  635   Monday, March 31, 2014, 13:22 Bevan MossConditioning StationStandard OperationTM4Ta #42HV conditioning TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but
 31032014_TM4_Ta#42_HV_Conditioning.txt31032014_Ta#42_HV_conditioning.JPG 
  645   Thursday, April 10, 2014, 14:03 Bevan MossConditioning StationStandard OperationTM3TiC#4HV conditioning The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly
 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt 
  646   Friday, April 11, 2014, 11:35 David WangConditioning StationStandard OperationTM3 Helium pressure test on TM3 HS water line with new Ta target. at CSThe helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response
 6x 
  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
south hot cell to the conditioning station.
  
  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedTM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges.
  
  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CSTM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment
 7x 
  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.The CS and TM1 is still under vacuum. They
will be vented with argon tomorrow mornig
  
  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.TM1 will be moved to ITW this morning.   
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station.
  
  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CSTM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4
  
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  709   Thursday, July 17, 2014, 11:49 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedI connected TM1 at CS. All turbo pumps
have been started. The pumping down is 
good so far.
  
  710   Monday, July 21, 2014, 13:11 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.The TM1 HS line is  pressure tested
this morning with 70 psi helium  at
CS. No response has been found on leak detector.
  
  711   Tuesday, July 22, 2014, 07:32 David WangConditioning StationStandard OperationTM1 Stop TM1 and CS turbo pumps and ruff pump.Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW.
  
  715   Monday, July 28, 2014, 09:29 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
    TM2 installed in Conditioning
Station
    Varian Leak detector
connected directly to Target Module 2   
 7x 
  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning.
  
  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module moveITE Entrance module has been moved from
the east station to the conditioning station.
  