1112
|
Friday, October 23, 2015, 07:41 |
Dan McDonald | Spent Target Vault | Maintenance | | | F-308's | Six F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some |
|
|
1113
|
Friday, October 23, 2015, 11:30 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#7 | ZrC#7 Spent Move and Febiad Coil | ZrC#7 was transfered to a spent target
disposal pail today and removed from the
hot cell. The "hot" end of the |
|
|
1114
|
Friday, October 23, 2015, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC #7 | Spent target moved | The spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then |
|
|
1115
|
Thursday, October 29, 2015, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | | Filling F-308s | Five F-308s have been filled with the spent
targets. The F-308s have been moved to the
hall way between the north and south hot |
|
|
1124
|
Monday, November 16, 2015, 08:04 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments |
|
|
1126
|
Monday, November 16, 2015, 10:33 |
Anders Mjos | Conditioning Station | Standard Operation | | FEBIAD Test Target | HV conditioning by ISAC operators | ISAC operators attempted HV conditioning
over the weekend.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=218447&style=entry |
|
|
1129
|
Tuesday, November 24, 2015, 13:54 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Decon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box |
|
|
1130
|
Tuesday, November 24, 2015, 14:00 |
chad fisher | South Hot-Cell | Repair | | | Compressible waste sorting. | Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible |
|
|
1131
|
Tuesday, November 24, 2015, 14:02 |
chad fisher | South Hot-Cell | Repair | | | Left Manip repair | electronics package on left manip died
completely yesterday (it has been going for
a while). |
|
|
1136
|
Wednesday, November 25, 2015, 14:16 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Cell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target. |
|
|
1141
|
Thursday, November 26, 2015, 08:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#46 | Spent Target move | Ta#46 was placed in the ISAC spent target
vault yesterday. See attached PDF for details. |
|
|
1142
|
Monday, November 30, 2015, 11:46 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update TH schedule according to
changes. see attachment 1,2 .
Update TH schedule before the weekend. |
|
|
1147
|
Wednesday, December 02, 2015, 10:41 |
chad fisher | South Hot-Cell | Repair | | | Drum Clean-up #2 | Another drum of waste was removed from
the south hot cell this morning. This drum
contained one 5 gal steel pail (damaged), |
|
|
1148
|
Thursday, December 10, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | | | Blank off flange | Thursday, December 10, 2015, 13:17: Roughing
Thursday, December 10, 2015, 14:56:
Started TP1S |
|
|
1149
|
Friday, December 18, 2015, 11:42 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly | It was found that the conversion
from voltage to vacuum (Torr) in EPICS is
not correct for the XGS-600 controllers in |
|
|
1150
|
Monday, December 21, 2015, 13:27 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly |
|
|
|
1151
|
Friday, January 08, 2016, 09:29 |
chad fisher | South Hot-Cell | Repair | | | Window Decon | Entered the hot cell to perform final decon
on the window. Initial swipes this morning
were 11000 c.p.m. on 44-2. After decon approximately |
|
|
1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. | Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February. |
|
|
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) | Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING |
|
|
1154
|
Friday, February 12, 2016, 13:00 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | 2016 Winter shut down target hall schedule.
See attachments1,2.
update the schedule weekly. |
6x |