  RH-ISAC, Page 108 of 141  Not logged in ELOG logo
  IDdown Date Author Category Type Module Target/Number Subject
  684   Tuesday, June 24, 2014, 11:12 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module move

TM#4 with TiC#4 has been moved from the east target station to the south hot cell.

  683   Tuesday, June 17, 2014, 10:46 David WangITWStandard OperationTM1UC#95 Shielding blocks have been transferred from ITE to ITW.

5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.

  682   Friday, June 13, 2014, 10:33 Anders MjosITWDevelopmentTM1UC#9Flow meter data

Coil not used on TM1. Data and plots on DocuShare

Friday, June 13, 2014, 10:30. ITE receving p+

  Temp [C] Flow [lpm]
HS 30.0 6.3
COIL  30.2 11.6

 Monday, June 16, 2014, 09:30: p+ off for maintenance day

  Temp [C] Flow [lpm]
HS 32.7 6.3
COIL  27.7 11.6

 Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW

  Temp [C] Flow [lpm]
HS 31.9 7.2
COIL  27.6 13.1

Tuesday, July 08, 2014, 10:32:

Data uploaded to DocuShare

  681   Thursday, June 12, 2014, 09:42 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308s

Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6.

Attachment 1: Vault_Storage_June_12_2014.pdf
Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf Vault_Storage_June_12_2014.pdf
Attachment 2: Mini_Vault_Storage_June_12_2014.pdf
Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf Mini_Vault_Storage_June_12_2014.pdf
  680   Tuesday, June 10, 2014, 14:02 David WangITWStandard OperationTM1UC9#TM1 and ITW turbo pumps have been started.

TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.

  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module move

TM#1 with UC#9 moved from the conditioning station to west station.

  678   Tuesday, June 10, 2014, 07:57 David WangConditioning StationStandard OperationTM1UC#9 TM1 are vented with argon and disconnected at CS.

TM1 will be moved to ITW this morning.

  677   Monday, June 09, 2014, 10:33 David WangConditioning StationStandard OperationTM1UC9#Stop TM1 and CS trubo pumps and ruff pump.

The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig

  676   Tuesday, June 03, 2014, 09:12 David WangConditioning StationStandard OperationTM1UC9#TM1 HS line helium pressure test and TM1 electrical check at CS

TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 004.JPG
004.JPG
Attachment 5: 005.JPG
005.JPG
Attachment 6: 006.JPG
006.JPG
Attachment 7: TM1_UC9#_E-check_at_CS.pdf
TM1_UC9#_E-check_at_CS.pdf
  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been started

TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges.

  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module move

TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.

  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installed

Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test on it at CS later.

  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical check

TM#1 with UC#9 electrical check see attached pdf for details.

Attachment 1: TM1_UC9_elec_chk_SHC.PDF
TM1_UC9_elec_chk_SHC.PDF
  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 Installed
UCx #9 has been installed.
  670   Monday, June 02, 2014, 10:52 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 with no target has been moved from the north west silo to the south hot cell.

  669   Friday, May 30, 2014, 09:41 Travis CaveSpent Target VaultStandard Operation Ta#42Spent target move

Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status.

Attachment 1: Vault_Storage_May_30_2014.pdf
Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf Vault_Storage_May_30_2014.pdf
  668   Wednesday, May 28, 2014, 08:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the south hot cell to the south west silo.

  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical check

TM#4 electrical check with Ta#42 attached post beam at the south hot cell.

Attachment 1: TM4_Ta42_elec_chk_SHC_postbeam.PDF
TM4_Ta42_elec_chk_SHC_postbeam.PDF
  666   Tuesday, May 27, 2014, 10:42 Travis CaveITWStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved from  the west target station to the south hot cell.

  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 Maintenance

All of the serviced F-308's have been moved to the South Hot cell area.