Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 107 of 138  Not logged in ELOG logo
  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical checkElectrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to
 TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF 
  411   Thursday, July 25, 2013, 10:08 David WangConditioning StationStandard OperationTM4SiC #29TM4 HS helium pressure test andTM4 connection at CSBevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec
  
  427   Monday, August 26, 2013, 18:26 Grant MinorConditioning StationStandard OperationTM3 TM3 moved from Hot Cell to Conditioning StationTarget Module 3 with no target, and a partially-installed
Rev-3 source tray (no steerers connected,
no IMG connected, entrance window lines blanked
  
  431   Tuesday, August 27, 2013, 17:18 Grant MinorConditioning StationRepairTM3no targetTM3 Rev 3 source tray - prelminary leak check results at CSDavid Wang started a helium leak check
on TM3 at the CS this morning.
David will create an e-log once his
 TM3_leak_check_at_CS_27Aug2013.JPGsketch_TM3_water_feedthru_27Aug2013-1.pdf 
  433   Wednesday, August 28, 2013, 14:25 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the conditioning station to the south hot
cell. The fields observed around the containment
  
  434   Thursday, August 29, 2013, 06:48 David WangConditioning StationDevelopmentTM3 TM3 leak check in CS with new source tray.A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at
 TM3_leak_check_at_CS_2013__AUG_27th.pdf 
  448   Wednesday, September 11, 2013, 11:31 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved to the
conditioning station from the south hot cell.
  
  449   Wednesday, September 11, 2013, 13:43 David WangConditioning StationDevelopmentTM3 Started 3 turbo pumps on CS for TM3TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far.
  
  453   Friday, September 13, 2013, 07:49 David WangConditioning StationDevelopmentTM3 TM3 water lines leak check at CSI leak checked TM3 water lines at CS with
60 psi and 80psi helium. The base leak rate
is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes
 TM3_water_lines_leak_check_at_CS.pdf 
  466   Wednesday, September 25, 2013, 13:48 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkElectrical check of TM#3 in the conditioning
station under vacuum see attached PDF for
details.
 TM#3_elec_chk_NiO#2_CS.PDF 
  467   Thursday, September 26, 2013, 09:46 maicodallavalleConditioning StationRepairTM3 Leak check / Pressure TestTM3 has had all of the water lines pressurized
with Helium and the Helium Leak detector
was connected to the turbo pumps. There were
  
  469   Thursday, September 26, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM3NiO#2Leak check / Pressure Test

    

       
            
  
  471   Thursday, September 26, 2013, 14:47 Bevan MossConditioning StationMaintenanceTM3NiO#2Water pumps turned on The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station
  
  472   Thursday, September 26, 2013, 14:55 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has
 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt 
  473   Thursday, September 26, 2013, 15:00 Bevan MossConditioning StationStandard OperationTM3NiO#2RGA not connecting Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan
  
  474   Thursday, September 26, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3NiO#2HV conditioning

    

       
            
 TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG 
  475   Friday, September 27, 2013, 10:54 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been moved to the south
hot cell from the conditioning station.
  
  476   Friday, September 27, 2013, 12:53 Bevan MossConditioning StationStandard OperationTM3NiO#2HP TGHT and TBHT conditioning Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical
 26092013_TM3_NiO#2_HP_testing.JPG26092013_TM3_NiO2_HP_testing.txt 
  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module moveTM#3 with NiO#2 has been move from south
hot cell to the conditioning station.
  
  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
ELOG V2.9.2-2455