  2302   Thursday, February 10, 2022, 11:45 David WangSpent Target VaultStandard Operation UCx#33.Spent target UCx #33 has been repacked with a new pail and lid in NHC. Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot
  
  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.   Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up
  
  2304   Thursday, February 10, 2022, 12:42 David WangITEStandard Operation  ITE HV test woithout mdoule was done.Carla
did the test. That is what she wrote in Feb
04th:  "I am done with the HV testing
  
  2307   Thursday, February 17, 2022, 13:24 David WangSpent Target VaultMaintenance UCx #34Repackage of UCx #34in NHC.UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive
  
  2308   Thursday, February 24, 2022, 13:23 David WangITE/ITWMaintenance  Polyurethane water cooling lines replacement in ITE and ITW. Polyurethane  water cooling lines
in ITE and ITW  HV shroud are replaced. 
Both stations Ta, Tu, MSP, HS, Coil , EE
  
  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC. UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to  take out
his samples( in two small plastic containers)
  
  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. Replaced 9 old turbo pumps from ITE/ ITW
and  one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage.
  
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .Annual ITW water signal interlocks check
was done with TM2 in ITW.   Water
signal interlocks on all water circuits related
  
  2325   Wednesday, May 25, 2022, 13:23 David WangITEStandard OperationTM4 Annual ITE water signal interlocks.Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal 
interlocks work fine. 
  
  2336   Wednesday, June 22, 2022, 09:03 David WangITEStandard OperationTM4UCX37# P2NRemotely removed TM2 from ITE to NHCTM2 with UCx#37 P2N target  was removed
from ITE to NHC yesterday morning. The move
is good. 
  
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job. Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target
  
  2340   Thursday, June 23, 2022, 13:04 David WangConditioning StationStandard OperationTM4Ta#64helium pressure test on TM4 HS line. With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested
  
  2356   Thursday, August 11, 2022, 09:10 David WangConditioning StationStandard OperationTM4SiC #44HS line helium pressure test. Gas line fitting on module top and gas line leak check. HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. 
  
  2364   Thursday, September 08, 2022, 09:06 David WangConditioning StationStandard OperationTM2UCx#39HS line helium pressure test.TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. 
  
  2374   Wednesday, October 05, 2022, 09:31 David WangConditioning StationStandard OperationTM4C#4HS line helium pressure test. TM4 with C#4 at TCS.TM4 HS line helium pressure test is done.
70psi helium pressure@ 3XE-8 atm.cc/sec .
No leak. 
  
  2378   Monday, October 17, 2022, 08:07 David WangITE/ITWRepairTM4 A small leak on target station secondaryvacuum back up line by ITH MP1S.
    

       
            A  small leak in target station
  
  2385   Thursday, November 03, 2022, 13:15 David WangConditioning StationStandard OperationTM2UCx#40HS line helium pressure test. TM4 with UCx#40at TCS.Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line. 
No leak.
  
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. ITW
 and TM2 primary and secondary vacuum
 ITW_vacuum_leak_check_2023.pdf 
  2405   Tuesday, January 24, 2023, 07:17 David WangITEStandard OperationTM4UCx#41TM4 water lines helium pressure test 2023. TM4 water lines helium pressure test was
done yesterday at ITE. All water lines were
air purged one day ahead  for the test.
 TM4_water_lines_helium_presuure_test_2023.pdf 
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.  ITW  was cleaned with vacuum
canister in Jan 10th. HV  cage inside
and blue  nylon insulators were wiped. 
  