ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1384   Wednesday, October 26, 2016, 12:33 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Update TH schedule after job delay on TM2
Febiad target. Everything should be back
to schedule on last two targets. See attachments.
 Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf 
  1385   Tuesday, November 01, 2016, 14:53 David WangITEStandard OperationTM4 TM4 was disconnected at ITETM4 was disconnected at ITE this morning.
It was moved to SHC  after. No alpha
alarm issue has been happened during and
  
  1386   Tuesday, November 01, 2016, 14:54 David WangITEStandard OperationTM4 TM4 was disconnected at ITETM4 was disconnected at ITE this morning.
It was moved to SHC  after. No alpha
alarm issue has been happened during and
  
  1387   Tuesday, November 01, 2016, 14:58 David WangSouth Hot-CellStandard OperationTM4 SHC, TM4 leak check on HS line.Chad and I did a leak check on TM4 HS line
with new Ta target installed. Base leak rate
0.0xE-9 atm.cc/sec. base pressure 0.0XE-4.  
  
  1389   Wednesday, November 02, 2016, 13:41 David WangConditioning StationStandard OperationTM4 TM4 has been connected at TCS. All turbo-pumps are started. The pumping
down is good so far.
  
  1390   Thursday, November 03, 2016, 08:57 David WangConditioning StationStandard OperationTM4 Helium pressure test on TM4 HS line at TCS70 psi helium ,2minutes to  TM4 HS
line. LD base leak rate 0.0xE-9 atm.cc/sec.
No leak.
  
  1391   Thursday, November 03, 2016, 09:01 David WangConditioning StationStandard OperationTM4 TCS water system has been started for TM4.The system works fine. All water signals
to TM4 at TCS are normal. HV cover is installed
on to TM4 at TCS.
  
  1393   Tuesday, November 08, 2016, 07:47 David WangConditioning StationStandard OperationTM4 TCS water and vacuum pumps are switched offTCS is vented. TM4 is disconnected and
TCS.
  
  1395   Tuesday, November 08, 2016, 14:04 Isaac EarleNorth Hot-CellDevelopment  Interference check with TCS turbo pump and proposed NHC duct routingDavid Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement
 IMG_7577.JPGIMG_7583.JPGIMG_7582.JPG 
  1396   Tuesday, November 08, 2016, 14:45 David WangITEMaintenanceTM4 TM4 has been moved to ITE and connected there.All ITE and TM4  turbo pumps are started.
The east station pumping down is good so
far.
  
  1397   Tuesday, November 15, 2016, 07:53 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Update TH schedules . See attachments  Target_Hall_shedule_131_Sep_to_Dec.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131__Sep_to_Dec_2016.pdf 
  1400   Tuesday, November 22, 2016, 14:26 David WangConditioning StationStandard Operation  TCS vacuum pumps are switched offTCS will be vented tomorrow morning for
TM2 moving.
  
  1403   Wednesday, November 23, 2016, 16:10 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray 
2 seconds on each joint and 10seconds flushing
  
  1404   Wednesday, November 23, 2016, 16:21 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good  so far.
  
  1406   Thursday, November 24, 2016, 10:30 David WangConditioning StationStandard OperationTM2 HV cover is installed on TM2 at TCSInterlock key  are returned back to
B2 level.TM2 is ready for HV conditioning
and heating up at TCS.
  
  1408   Tuesday, November 29, 2016, 06:27 David WangConditioning StationStandard OperationTM2 TCS water pumps are stoppedArgon venting on TCS and TM2 is processing   
  1409   Tuesday, November 29, 2016, 07:50 David WangConditioning StationStandard OperationTM2 TM2 is disconnected at TCS.Argon venting is done.   
  1410   Tuesday, November 29, 2016, 12:57 David WangITWStandard OperationTM2 TM2 is connected in ITWAll turbo pumps are started. Water system
and water signals have been checked. Pumping
down on ITW and TM2 is good so far.
  
  1412   Wednesday, November 30, 2016, 16:31 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.All water circuits are by passed on the
top of TM3. Water pumps and vacuum turbo-
pumps are started. Everything is ready for
  
  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.A short between TM2 EE and bias is produced
yesterday during tube heater ramp up. 
Alex asked for an argon venting on ITW to
  