|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
|
1366
|
Wednesday, September 28, 2016, 13:47 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumping down during mini-shut down. | A steel plate is covered on TCS.
TCS roughing pump is started now. The
TCS will be pumping down during mini-shut |
|
|
1367
|
Friday, September 30, 2016, 14:34 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Weekly update TH schedule for beam schedule
131. See attachments 1,2 |
 |
|
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
|
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
|
1371
|
Wednesday, October 12, 2016, 10:01 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumps are stopped | Argon venting is started |
|
|
1375
|
Friday, October 21, 2016, 12:51 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Broken cable has been replaced however
a cable has hopped some pulleys inside. After
two hours in cell the job was stopped with |
|
|
1377
|
Monday, October 24, 2016, 10:10 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair Complete | Maico entered the hot cell and re-strung
the skipped cable back onto the pulleys this
morning. Manipulator is now operational. |
|
|
1379
|
Monday, October 24, 2016, 12:22 |
chad fisher | South Hot-Cell | Repair | | | TM2 Insulator replacement | conductor insulators itd0053 and 54 have
been replaced on TM2. All fasteners (1/4-20
x 1 1/4 vented) torqued to 60 in lbs. |
|
|
1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
|
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | All turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far. |
|
|
1384
|
Wednesday, October 26, 2016, 12:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Update TH schedule after job delay on TM2
Febiad target. Everything should be back
to schedule on last two targets. See attachments. |
  |
|
1385
|
Tuesday, November 01, 2016, 14:53 |
David Wang | ITE | Standard Operation | TM4 | | TM4 was disconnected at ITE | TM4 was disconnected at ITE this morning.
It was moved to SHC after. No alpha
alarm issue has been happened during and |
|
|
1386
|
Tuesday, November 01, 2016, 14:54 |
David Wang | ITE | Standard Operation | TM4 | | TM4 was disconnected at ITE | TM4 was disconnected at ITE this morning.
It was moved to SHC after. No alpha
alarm issue has been happened during and |
|
|
1387
|
Tuesday, November 01, 2016, 14:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I did a leak check on TM4 HS line
with new Ta target installed. Base leak rate
0.0xE-9 atm.cc/sec. base pressure 0.0XE-4. |
|
|
1389
|
Wednesday, November 02, 2016, 13:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected at TCS. | All turbo-pumps are started. The pumping
down is good so far. |
|
|
1390
|
Thursday, November 03, 2016, 08:57 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure test on TM4 HS line at TCS | 70 psi helium ,2minutes to TM4 HS
line. LD base leak rate 0.0xE-9 atm.cc/sec.
No leak. |
|
|
1391
|
Thursday, November 03, 2016, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water system has been started for TM4. | The system works fine. All water signals
to TM4 at TCS are normal. HV cover is installed
on to TM4 at TCS. |
|
|
1393
|
Tuesday, November 08, 2016, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water and vacuum pumps are switched off | TCS is vented. TM4 is disconnected and
TCS. |
|
|
1395
|
Tuesday, November 08, 2016, 14:04 |
Isaac Earle | North Hot-Cell | Development | | | Interference check with TCS turbo pump and proposed NHC duct routing | David Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement |
  |
|
1396
|
Tuesday, November 08, 2016, 14:45 |
David Wang | ITE | Maintenance | TM4 | | TM4 has been moved to ITE and connected there. | All ITE and TM4 turbo pumps are started.
The east station pumping down is good so
far. |
|