  638   Friday, April 04, 2014, 14:59 Keith C NgITEMaintenance  measurement of new beam tube sectionR. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with
 wall_to_flange_length.pdf 
  639   Friday, April 04, 2014, 16:59 Anders MjosITWDevelopment  Flow meters installed on Heat Shield and Coil water returnDavid W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected
 20140404_165829_1.jpg 
  647   Friday, April 11, 2014, 18:17 Keith C NgITERepair  2a3 window - installToday:
1) Installed new cradle and shortened
beam pipe section in wall penetration.
  
  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module moveThe East Entrance module has been moved
from the south west silo to the east target
station. The move went well.
  
  649   Monday, April 14, 2014, 13:58 David WangITERepair  Reconnected ITE entrance moduleI reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE
  
  652   Wednesday, April 16, 2014, 17:08 Keith C NgITERepair  2a3 window - He leak checkHelium leak checked 2a3 window after installing
using remote line: 
- There was a leak found between
  
  653   Wednesday, April 30, 2014, 12:03 Travis CaveSpent Target VaultStandard Operation 2A3 windowWindow now in vaultThe 2A3 window now has a lid, and lift
yolk on it and it has been installed in the
spent target vault in spot 2A. The lid is
 Vault_Storage_April_30_2014.pdf 
  657   Tuesday, May 06, 2014, 14:05 Travis CaveITEStandard Operation  module moveThe entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules
  
  662   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
  
  663   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
 Vault_Storage_May_22_2014.pdf 
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceAll of the serviced F-308's have been moved
to the South Hot cell area.
  
  669   Friday, May 30, 2014, 09:41 Travis CaveSpent Target VaultStandard Operation Ta#42Spent target moveTa#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was
 Vault_Storage_May_30_2014.pdf 
  681   Thursday, June 12, 2014, 09:42 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sFive targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28,
 Vault_Storage_June_12_2014.pdfMini_Vault_Storage_June_12_2014.pdf 
  685   Tuesday, June 24, 2014, 11:33 maicodallavalleSpent Target VaultStandard Operation  F-308 MaintenanceFive F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F
  
  698   Wednesday, July 02, 2014, 14:29 David WangITEStandard Operation  Reconnected TM3 in ITE.I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical
  
  718   Monday, July 28, 2014, 17:26 Ron KuramotoITWRepair  ITW:IV5 Air leak repairAir leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room.  The
 DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg 
  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module moveITE Entrance module has been moved from
the east station to the conditioning station.
  
  721   Tuesday, August 05, 2014, 10:40 Travis CaveITEStandard Operation  module moveITE Entrance module has been moved back
to the east station.
  
  722   Tuesday, August 05, 2014, 11:53 David WangITERepair  Reconnected ITE entrance moduleITE entrance module is reconnected in ITE.   