217
|
Wednesday, November 21, 2012, 09:36 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target move |
On Nov 20th the 5 targets in mini storage have been moved to the F-308s, those F-308s have since been moved to the hot cell ante room. They will sit there until Monday. |
223
|
Wednesday, December 05, 2012, 15:53 |
Anders Mjos | South Hot-Cell | Standard Operation | | UCx#5 | Target inspection - target tube broken |
The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.
Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357 |
224
|
Thursday, December 06, 2012, 08:57 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#5 | Spent target move |
UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction from the south hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_December_6_2012.pdf
|
|
229
|
Thursday, January 10, 2013, 10:40 |
David Wang | ITW | Maintenance | | | Replaced all high active water system magnetic pedal wheels in ITW and ITE. |
I replaced all high active water system magnetic pedal wheels in ITW and ITE. This is a preventive maintenance job we planned for this winter shut down. |
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move |
TiC #3 was moved from the south hot cell in to the vault storage today, it was placed in slot 4B and was in pail #104, it had a reading of 98.7mSv/hr upon removal from the south hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_January_15_2013.pdf
|
|
233
|
Thursday, January 17, 2013, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC Test Target for TM4/CS |
I have inserted the test target for TM4 and the CS into the hot cell.
I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached. |
Attachment 1: IMG_0909[1].JPG
|
|
Attachment 2: IMG_0910[1].JPG
|
|
Attachment 3: IMG_0911[1].JPG
|
|
Attachment 4: IMG_0912[1].JPG
|
|
Attachment 5: IMG_0913[1].JPG
|
|
Attachment 6: IMG_0914[1].JPG
|
|
Attachment 7: IMG_0915[1].JPG
|
|
Attachment 8: IMG_0916[1].JPG
|
|
Attachment 9: IMG_0917[1].JPG
|
|
Attachment 10: IMG_0918[1].JPG
|
|
Attachment 11: IMG_0919[1].JPG
|
|
Attachment 12: IMG_0920[1].JPG
|
|
Attachment 13: IMG_0921[1].JPG
|
|
Attachment 14: IMG_0922[1].JPG
|
|
Attachment 15: IMG_0923[1].JPG
|
|
Attachment 16: IMG_0924[1].JPG
|
|
241
|
Monday, January 28, 2013, 12:26 |
Travis Cave | Conditioning Station | Development | | | Switches connected |
the switches and the solenoid are all wire up to 24VDC, when you open either of the little doors the solenoid switches this is also true if there is a power loss. currently the solenoid is powered. |
243
|
Friday, February 08, 2013, 11:42 |
Grant Minor | ITE | Maintenance | | | TAPC 477 resolved - ISAC elec. room gas cylinder |
See attached TAPC 477 documentation. |
Attachment 1: TAPC-477_resolved_8Feb2013.pdf
|
|
244
|
Thursday, February 14, 2013, 09:31 |
David Wang | ITW | Repair | | | ITH MP1 is replaced. |
Edi and I replaced the broken ITH MP1 in target hall with a new pump. The old pump was leak on oil. There were no oil had been left in the old pump by checking the sight glass.Thats the reason of the pump failure.The tray which the old pump sat on was full of leaking oil ( highly contaminated ). The old pump was bagged in 3 thick plastic bags ,and the tray was cleaned before the new pump was installed. The working area had been cleaned up and surveyed couple of times after the job. Everything is good. The new pump had been tested after the installation. It works fine. |
252
|
Wednesday, March 06, 2013, 10:09 |
Travis Cave | ITW | Maintenance | | | module move |
ITW EX1 has been moved from the west target station to the south hot cell for the seal replacement on the west station. |
253
|
Wednesday, March 06, 2013, 12:50 |
Travis Cave | South Hot-Cell | Maintenance | | | module move |
ITW EX1 have been moved back to the west target station from the south hot cell. |
254
|
Wednesday, March 06, 2013, 14:12 |
David Wang | ITW | Repair | | | ITW EXIT1 tank to module o-ring replacement |
ITW EXIT1 o-ring replacement is fininshed today. The ITW EXIT 1 is back to ITW. The old o-ring lost most its elastic property and changed to stiff sqaure shape inside the slot.The flange surface around the o-ring slot was dirty. I cleaned the o-ring surface completely before putting the new o-ring . Everything should be fine now. There will be a leak check late on this new installed o-ring.
|
259
|
Wednesday, March 13, 2013, 14:30 |
Bevan Moss | Conditioning Station | Development | | | Faraday Cup |
Dave Morris and I investigated the Faraday Cup today. It was found to be plumed in the wrong direction (fails in). This is not an issue for the conditioning station as there is nothing down stream from the cup. Dave will change the controls to reflect this. |
318
|
Wednesday, April 24, 2013, 09:00 |
Bevan Moss | Conditioning Station | Development | | | New user testing |
Controls has created a new user group that can operate the conditioning station but cannot use any of the bypasses or forces. The cooling package will be used to test this new profile. The main loop bypass has been opened to allow this testing to happen without the risk of over pressure. |
320
|
Wednesday, April 24, 2013, 10:36 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 |
The F-308's have been serviced and are ready to be filled. All inspection records are stored in docushare.
https://documents.triumf.ca/docushare/dsweb/View/Collection-1085 |
334
|
Thursday, May 09, 2013, 10:13 |
chad fisher | South Hot-Cell | Development | | | Mock-up Progress |
The source tray for the mock-up has been setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the photos for the TM3 rebuild that took place in the anteroom in 09' and Maico and Dan for the support in ironing the issues with the source tray side soldering issues.
|
Attachment 1: IMG_1056[1].JPG
|
|
Attachment 2: IMG_1057[1].JPG
|
|
Attachment 3: IMG_1058[1].JPG
|
|
345
|
Wednesday, May 15, 2013, 10:20 |
Bevan Moss | Conditioning Station | Repair | | | Roof top chiller failed |
I have been getting a fault on the roof top chiller for the 2 tandem 7.5 ton chillers. I have checked and we have water flow and the temperatures are nowhere near freezing. I believe they are over heating as the fans on that side are not coming on. The blades are free to turn by hand but the VFD controller keeps saying off. I have tried turning it on and off and that also did nothing. I have contacted ESC for further advice. |
346
|
Wednesday, May 15, 2013, 10:25 |
Bevan Moss | Conditioning Station | Repair | | | ONICON flow meter |
Scott Adair from Riada sales came to site to complete diagnostics on the ONICON flow meter. He could not determine the problem and believes that there was a short in the head. He has taken the flow meter for what should be warranty repair. The flow meter is for diagnostics only, the conditioning station can still operate without it.
|
347
|
Wednesday, May 15, 2013, 16:21 |
Bevan Moss | Conditioning Station | Repair | | | BIAS Current readings off by a factor of 5 |
A special thanks to Kazuya, Jane and Ray who jumped on this issue right away! The limit of the BIAS PS was set as 20000uA when in reality it is 4000uA. The issue has now been corrected. Please remember to divide the current by 5 for any elogs older than this one. |
351
|
Friday, May 17, 2013, 10:04 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair |
Manipulator has been sucessfully repaired. Recieved 0.19 mSv. Took Approx. 10-20 minutes |