Friday, December 05, 2014, 15:41, Anders Mjos, Conditioning Station, Development, TM2, , RGA results 
|
Measurement taken at 14:25. IG2 at ~7.7E-6 T |
Friday, December 05, 2014, 11:58, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D) water lines. 6x
|
At CS, The leak detector is hooked directly to the TM2 top service cap. The base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4torr. Applied 80 psi helium
to TM2 tube heater +(D) line . During 3 minutes applying time , I did not see any tiny change on LD readings. The line is perfectly vacuum sealed.
See attachment pictures. |
Friday, December 05, 2014, 07:47, David Wang, Conditioning Station, Development, TM2, , TM2 at CS
|
The pumping down on TM2 at CS was good overnight. However, the back up line pressure is still too high for LD to get to 0.0-E-9atm.cc/sec . It only could
get to 1.2xE-7 atm.cc/sec. It is not enough for a good leak check . I dont want to have any ambiguous situation on this" D" line leak check.
So,I am going to reconfigure the leak detector to the spare KF25 pot on the TM2 service cap. All pumps are stopped . The CS and TM2 will be vented soon. |
Thursday, December 04, 2014, 16:37, David Wang, Conditioning Station, Development, TM2, , connected TM2 and CS vacuum system .
|
I connected TM2 and CS vacuum system. All vacuum pumps on TM2 and CS are started .The pumping down is good so .far |
Thursday, December 04, 2014, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target placed in F-308.
|
Spent targets in the mini storage were placed into the F-308s yesterday, all F-308 have been removed from the the target hall and they no reside for
the time being in the hallway between the north and south hot cells. |
Thursday, December 04, 2014, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical check
|
Results of electrical check of TM#2 with no source tray and no containment box attached. See PDF for results. |
Thursday, December 04, 2014, 09:49, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module move
|
TM#2 has been moved from the south hot cell to the conditioning station. |
Tuesday, December 02, 2014, 13:33, David Wang, South Hot-Cell, Development, TM2, , Leak check on TM2 tube heater +(D) at SHC  
|
Chad and I leak checked TM2 tube heater+(D) circuit at SHC with water bypass loop and new seals installed on the water block. The LD base LR 0.0xE-9
atm.cc/sec,base pressure0.0xE-4 torr. Chad sprayed helium on the leak check area in SHC for 5 seconds. No any response has been found on LD during 1minutes
waiting time. The test was repeated again and the result is same. NO LEAK at this stage! After the TM2 is moved to CS , The D line will be pressured |
Tuesday, December 02, 2014, 10:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Reburb. Loop Install  
|
Final polish, clean with methanol and clean compressed air.
Loop installed and torqued to 90 in lbs.
Minimum of approximately 1" between loop and containment box at closest point. |
Monday, December 01, 2014, 14:48, Travis Cave, Spent Target Vault, Standard Operation, , , F-308s moved
|
The F-308s have been moved into the target hall, for filling on wednesday. |
Monday, December 01, 2014, 14:06, chad fisher, South Hot-Cell, Repair, TM2, , TM2 REFURB. WATER LOOP TEST    
|
Some issues with the turntable and having to wait for a decision on whether to remove TM2 from the hot cell so that TM4 with dead UCx target could be
put in this morning.
Progress on TM2: |
Monday, December 01, 2014, 12:05, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 Maintenance
|
F-308's have been serviced and are ready to be filled with spent targets. F-308's witch were serviced are #6,#13,#15,#16,and #19. |
Friday, November 28, 2014, 13:06, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move
|
TM#2 with no target or source tray has been moved from the north east silo to the south hot cell. |
Wednesday, November 26, 2014, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29, Spent targets moved to mini storage
|
The following targets have been moved to the mini storage from the target storage vault:
Ta#38
Nb#7
TiC#3
SiC#29
NiO#2
These target will be removed from
the mini storage and placed into the F-308's on December 3rd. |
Tuesday, November 25, 2014, 12:45, David Wang, ITE, Standard Operation, TM4, UCx11, 5 Shielding blocks have been transferred from ITW to ITE.
|
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
Tuesday, November 25, 2014, 11:33, David Wang, South Hot-Cell, Development, , , Remove UCX 11 target transfer stand from SHC back to TH.
|
The stand was used for transferring UCX11 targte from TH to SHC. The stand wit target was craned down from TH into SHC last week and stayed there over
weekend. Chad and I removed the stand out of SHC yesterday. It was heavily contaminated. RPG and I spent more than 3 hours to clean this stand. See the
emails I pasted below for detail information. |
Friday, November 21, 2014, 10:40, Travis Cave, Spent Target Vault, Standard Operation, , Ta#44, Spent target move
|
The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr
upon removal from the south hot cell. |
Thursday, November 20, 2014, 14:13, David Wang, Conditioning Station, Standard Operation, TM4, UCx11, CS and TM4 was vented with Argon gas
|
CS and TM4 was vented with Argon gas this morning before it was moved from CS to ITE. |
Thursday, November 20, 2014, 14:12, David Wang, ITE, Standard Operation, TM4, UCx11, TM4 is connected in ITE.
|
TM4 has been connected connect in ITE. Water is supplied to TM4 module only. |
Thursday, November 20, 2014, 11:49, Travis Cave, ITE, Standard Operation, TM4, UC#11, module move
|
TM#4 with UCx#11has been moved from the conditioning station to the east target station. |
|