  2748   Tuesday, January 14, 2025, 10:00 David WangSouth Hot-CellStandard OperationTM3UCx#47after operation electrical check, Tm3 UCx 47

TM3 UCx#47 after operation electrical check  is done at SHC. The result is normal. See attachment.

Attachment 1: TM3_UCX_47_after_operation_electrical_check.pdf
TM3_UCX_47_after_operation_electrical_check.pdf
  2747   Monday, January 13, 2025, 10:36 Frank SongITEStandard OperationTM3UCx#47module disconnection

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

Attachment 1: TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target Move
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Attachment 1: Target_Index_2025-01-13.pdf
Target_Index_2025-01-13.pdf
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.

 SMP:MP1 is started with SMP BV1 is opened. SMP is under vacuum for TM4 storage during shut down.

  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings

ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced in March when general fielding in vacuum pit is reasonable for the job.

  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removal

UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.

Attachment 1: TM4_UCx46_07012024.jpeg
TM4_UCx46_07012024.jpeg
Attachment 2: TM4_UCx46_2_07012024.jpeg
TM4_UCx46_2_07012024.jpeg
  2742   Tuesday, January 07, 2025, 12:05 David WangITEStandard OperationTM3UCx #47ITE primary and secondary vacuum vessel leak check for 2025 shut down

ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak.  The TM3 waterlines helium pressure test will be done at TCS when module is there.

  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .

  2739   Friday, January 03, 2025, 10:41 David WangITWStandard OperationTM4UCX46ITW primary and secondary vacuum vessel leak check for 2025 shut down

ITW primary and secondary vacuum vessel leak check for  2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished.  Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate  o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak  area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak.   See attachment  for detail results.

Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
ITW_primary_and_secondary_vacuum_leak_check_2025.pdf ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target Hall

A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • Hot Cells:
    • NHC right manipulator gripper stuck (known, repair planned)
  • Target Hall:
    • 50% of overhead light bulbs burnt out (David Wang contacted Electrical Services to rectify)
    • One RH camera for target pit not working (Travis Cave notified)

Action has been taken on all deficiencies.

  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - Inspection

An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection was performed June 18, 2024 for this year.

The attachment to this e-log serves as a record of all inspections for this tool throughout 2024.

The spare tool was not inspected as it was not in service this year.

Attachment 1: ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini Vault

Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails staged for packaging into F-308s.

Nb#10, Pail 295, Tray 4A
C#4, Pail 277, Tray 4C
Ta#64, Pail 273, Tray 5C
Ta#62 with wire scanner, Pail 256, Tray 7A
TiC#5, Pail 279, Tray 3A

The target index has been updated accordingly (see attached but note that the summary does not reflect the sixth pail).

Attachment 1: MiniVault_2024-12-18.pdf
MiniVault_2024-12-18.pdf MiniVault_2024-12-18.pdf
  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300

Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it is planned to remove five pails in January 2025.

Attachment 1: Storage_Vault_Contents_2024-12-05.pdf
Storage_Vault_Contents_2024-12-05.pdf
  2733   Thursday, December 05, 2024, 11:43 Aaron TamSouth Hot-CellStandard Operation Ta#68 Pail loading - Ta#68 & Others into Pail#300

December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane  

Hot Cell Prep:

  • Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening 

Loading:

  • Ta#68 was loaded into pail# 300
  • PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
  • Farran had some old samples that also went in (More details to come when Farran sends the info)

Lid/latching:

  • This went smoothly

Bail attachment:

  • Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad

Notes:

  • One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time. 
  • All parasitic type targets remain in the yellow container shown in photos below. 
Attachment 1: Pail_Landing.jpg
Pail_Landing.jpg
Attachment 2: Loaded_Pail.jpg
Loaded_Pail.jpg
Attachment 3: Parasitic_Lid_that_was_missed.jpg
Parasitic_Lid_that_was_missed.jpg
Attachment 4: Location_of_all_parasitic_type_targets_and_fasteners.jpg
Location_of_all_parasitic_type_targets_and_fasteners.jpg
Attachment 5: Parastics_and_Target_stuff_that_went_inside_this_pail.jpg
Parastics_and_Target_stuff_that_went_inside_this_pail.jpg
  2732   Wednesday, December 04, 2024, 14:30 Aaron TamSouth Hot-CellStandard Operation Ta#68Ta#68 PIE

 Abstract:
This target has seen some irregular beam patterns 
Possibility that the beam hit the walls of the target tube or even the cooling fins
This PIE we want to investigate how the irregular beam physically affected the target 

Related ELOGS: 
ID: 2728
ID: 2698

PIE was performed by Aaron Tam, Directed by Aurelia Laxdal, Observed by Lucas Backes, Special help from Chad Fisher 

External views:

  • Windows are clear of any irregularities 
  • More pictures of this can be found in RH-ISAC E-log 2728

Internal Views:

  • Heatshield internal
    • Some discolouration from heat and soot deposits.
    • This seems to be fairly clean to normal amounts - not concerning 
  • Target tube
    • tube is bent with the middle higher than the sides
    • Target tube was not removed 9/64ths allen wrench could not be located for this operation 
  • Target tube Exit
    • Heatshield windows were punctured to reveal the target tube entraces/exits
    • Entrance is waterline side (ITE)
  • Extraction electrode parts were removed from the back off the target
    • These parts look normal
    • some of the extraction electrode would not pull out due to tight fitting parts and the investigation stopped here.

Conclusion: Target physical condition is normal as far as we could investigate 

Attachment 1: Waterline_disconnect.jpg
Waterline_disconnect.jpg
Attachment 2: Heatshield_inside.jpg
Heatshield_inside.jpg
Attachment 3: Target_tube_first_look.jpg
Target_tube_first_look.jpg
Attachment 4: Heatshield2.jpg
Heatshield2.jpg
Attachment 5: Heatshield3.jpg
Heatshield3.jpg
Attachment 6: Target_tube_2.jpg
Target_tube_2.jpg
Attachment 7: Target_tube_3.jpg
Target_tube_3.jpg
Attachment 8: Couldn't_undo_this_bolt.jpg
Couldn't_undo_this_bolt.jpg
Attachment 9: Exit_tube.jpg
Exit_tube.jpg
Attachment 10: Exit_tube2.jpg
Exit_tube2.jpg
Attachment 11: Exit_tube3.jpg
Exit_tube3.jpg
Attachment 12: Exit_tube4.jpg
Exit_tube4.jpg
Attachment 13: Exit_tube5.jpg
Exit_tube5.jpg
Attachment 14: Exit_tube6.jpg
Exit_tube6.jpg
Attachment 15: Exit_tube7.jpg
Exit_tube7.jpg
Attachment 16: Exit_tube8.jpg
Exit_tube8.jpg
Attachment 17: Exit_tube9.jpg
Exit_tube9.jpg
Attachment 18: Exit_tube10.jpg
Exit_tube10.jpg
Attachment 19: entrance_tube.jpg
entrance_tube.jpg
Attachment 20: entrance_tube2.jpg
entrance_tube2.jpg
Attachment 21: entrance_tube3.jpg
entrance_tube3.jpg
Attachment 22: entrance_tube4.jpg
entrance_tube4.jpg
Attachment 23: Exit_tube5.jpg
Exit_tube5.jpg
Attachment 24: entrance_tube6.jpg
entrance_tube6.jpg
Attachment 25: entrance_tube7.jpg
entrance_tube7.jpg
Attachment 26: entrance_tube8.jpg
entrance_tube8.jpg
Attachment 27: entrance_tube9.jpg
entrance_tube9.jpg
Attachment 28: entrance_tube10.jpg
entrance_tube10.jpg
Attachment 29: entrance_tube11.jpg
entrance_tube11.jpg
Attachment 30: Extraction_electrode.jpg
Extraction_electrode.jpg
Attachment 31: entrance_tube1.jpg
entrance_tube1.jpg
Attachment 32: Extraction_electrode2.jpg
Extraction_electrode2.jpg
  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to silo

TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth.

  2730   Wednesday, December 04, 2024, 09:00 David WangFacilitiesStandard OperationTM2 all water lines on TM2 have been purged.

all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. 

  2729   Wednesday, December 04, 2024, 08:05 Frank SongITEStandard OperationTM3UCx#47Module Connection

TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 

Attachment 1: TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf