801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
|
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move | The spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage |
|
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
|
797
|
Thursday, November 20, 2014, 14:12 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | TM4 is connected in ITE. | TM4 has been connected connect in ITE.
Water is supplied to TM4 module only. |
|
|
796
|
Thursday, November 20, 2014, 11:49 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | module move | TM#4 with UCx#11has been moved from the
conditioning station to the east target station. |
|
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
|
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check | TM#4 with UC#11 electrical check done.
See attached PDF for the results. |
|
|
793
|
Wednesday, November 19, 2014, 08:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#11 | Ta#44 Removed Ucx#11 Installed | Ta#44 has been removed from TM4 and UCx#11
has been installed and is ready for testing.
New fasteners were installed for |
|
|
792
|
Tuesday, November 18, 2014, 11:15 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | TM4 has been disconnected in ITE. | Dan and I disconnected TM4 in ITE. |
|
|
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
|
790
|
Tuesday, November 18, 2014, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#44 | module move | TM#4 with Ta#44 has been moved from the
east target station to the south hot cell. |
|
|
789
|
Monday, November 17, 2014, 13:45 |
chad fisher | South Hot-Cell | Repair | | | Jig for roof install of target | Jig for installation of target through
hot cell roof has been assembled and placed
in the target hall. |
|
|
788
|
Monday, November 17, 2014, 11:38 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the conditioning station to the north west
silo. |
|
|
787
|
Thursday, November 13, 2014, 14:05 |
David Wang | ITE | Repair | TM4 | | Dan and I replaced flow wheel on ITE HVC2 water flow sensor. | Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel |
|
|
786
|
Thursday, November 13, 2014, 14:01 |
David Wang | ITW | Repair | TM1 | | I replaced flow wheel and coil on ITW MSP water flow sensor. | I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal |
|
|
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. | Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
|
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|