ID Date Author Category Type Module Target/Number Subject Text Attachments
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical checkTM#1 with ThO#1 electrical check see attatched
PDF for details.
 TM1_elec_check_ThO1_SHC.PDF 
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  775   Monday, November 03, 2014, 10:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell.
  
  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS See work
permit for details
  
  773   Wednesday, October 22, 2014, 09:41 David WangConditioning StationDevelopmentTM3 TM3 has been disconnected at CS.TM3 has been disconnected at CS. It is
vented and ready to move.
  
  772   Tuesday, October 21, 2014, 14:53 Travis CaveSpent Target VaultStandard Operation ZrC#6Spent target moveZrC#6 has been moved from the south hot
cell and into storage. It was placed in pail
120 in slot 5C of the vault. For more details
 Vault_Storage_October_21_2014.pdf 
  771   Tuesday, October 21, 2014, 08:55 chad fisherSouth Hot-CellRepair  Manipulator repairThe east manipulator handle has been adjusted
and is ready for use.
  
  770   Monday, October 20, 2014, 14:18 chad fisherSouth Hot-CellRepair  Manipulator RepairThe broken cable on the east manipulator
has been replaced.
The handle will need some adjustments
  
  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failedTM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass
  
  768   Monday, October 20, 2014, 08:59 David WangConditioning StationDevelopmentTM3 Started TCS water system.I started TCS water system this morning
to check if the chillers work properly.
  
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  766   Thursday, October 16, 2014, 15:40 Anders MjosConditioning StationMaintenance  Chiller unitNOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the
 TCS_Cooling_System.pdf 
  765   Wednesday, October 15, 2014, 12:55 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved from
the south hot cell to the south west silo.
  
  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage ConditioningWednesday, October 14, 2014
 The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped
 TCS_TM3.docx 
  763   Tuesday, October 14, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkElectrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details.
 TM1_elec_check_no_target.PDF 
  762   Tuesday, October 14, 2014, 12:19 David WangITWStandard OperationTM1 TM1 was disconnected in ITW.TM1 was disconnected in ITW this morning.
Heat shield circuit is purged.
  
  761   Tuesday, October 14, 2014, 11:52 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical checkTM#1 with ZrC#6 post beam electrical check
see attached pdf for results.
 TM1_ZrC6_postbeam.PDF 
  760   Tuesday, October 14, 2014, 11:51 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from ITW
to the south hot cell.
  
  759   Friday, October 10, 2014, 10:47 David WangConditioning StationDevelopmentTM3 TM3 has been connected in CSTM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to
  