|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE | Anders and I opened the HV cover in ITE
and did a visual check inside ITE HV
cover and top of TM3.Bill was with us and |
|
|
660
|
Wednesday, May 14, 2014, 19:01 |
Grant Minor | ITE | Maintenance | TM3 | | HV short inspection at ITE | Friedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE. |
|
|
659
|
Wednesday, May 07, 2014, 10:15 |
David Wang | ITE | Repair | TM3 | | ITE TM3, entrance module and BL2A3 window flange seals leak check.. | ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The |
|
|
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. | ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the |
7x |
|
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move | The entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules |
|
|
656
|
Monday, May 05, 2014, 13:11 |
David Wang | ITE | Repair | TM3 | | ITE Entrance module has been disconnected. | ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures. |
|
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
|
|
654
|
Monday, May 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
east station to the south west silo. |
|
|
653
|
Wednesday, April 30, 2014, 12:03 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault | The 2A3 window now has a lid, and lift
yolk on it and it has been installed in the
spent target vault in spot 2A. The lid is |
|
|
652
|
Wednesday, April 16, 2014, 17:08 |
Keith C Ng | ITE | Repair | | | 2a3 window - He leak check | Helium leak checked 2a3 window after installing
using remote line:
- There was a leak found between |
|
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
|
650
|
Tuesday, April 15, 2014, 08:53 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
conditioning station to the east target station. |
|
|
649
|
Monday, April 14, 2014, 13:58 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | I reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE |
|
|
648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move | The East Entrance module has been moved
from the south west silo to the east target
station. The move went well. |
|
|
647
|
Friday, April 11, 2014, 18:17 |
Keith C Ng | ITE | Repair | | | 2a3 window - install | Today:
1) Installed new cradle and shortened
beam pipe section in wall penetration. |
|
|
646
|
Friday, April 11, 2014, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Helium pressure test on TM3 HS water line with new Ta target. at CS | The helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response |
6x |
|
645
|
Thursday, April 10, 2014, 14:03 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | TiC#4 | HV conditioning | The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly |
|
|
644
|
Wednesday, April 09, 2014, 11:10 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 heat shield circuit leack check at SHC | This Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec, |
|
|
643
|
Tuesday, April 08, 2014, 09:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station. |
|
|
642
|
Monday, April 07, 2014, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | TiC#4 | TiC#4 installation | TiC#4 has been installed onto TM3 |
|