  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module moveThe East Entrance module has been moved
from the south west silo to the east target
station. The move went well.
  
  647   Friday, April 11, 2014, 18:17 Keith C NgITERepair  2a3 window - installToday:
1) Installed new cradle and shortened
beam pipe section in wall penetration.
  
  646   Friday, April 11, 2014, 11:35 David WangConditioning StationStandard OperationTM3 Helium pressure test on TM3 HS water line with new Ta target. at CSThe helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response
 6x 
  645   Thursday, April 10, 2014, 14:03 Bevan MossConditioning StationStandard OperationTM3TiC#4HV conditioning The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly
 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt 
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  
  643   Tuesday, April 08, 2014, 09:05 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station.
  
  642   Monday, April 07, 2014, 14:13 chad fisherSouth Hot-CellStandard OperationTM3TiC#4TiC#4 installationTiC#4 has been installed onto TM3   
  641   Monday, April 07, 2014, 11:49 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical checkElectrical test of TM#3 with TiC#4 attached.
See PDF.
 TM#3_elec_test_TiC#4_surf.PDF 
  640   Monday, April 07, 2014, 10:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check at the south hot 
cell with no target to give us a base line
and show that things are ok with the module
 TM#3_elec_test_no_target.PDF 
  639   Friday, April 04, 2014, 16:59 Anders MjosITWDevelopment  Flow meters installed on Heat Shield and Coil water returnDavid W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected
 20140404_165829_1.jpg 
  638   Friday, April 04, 2014, 14:59 Keith C NgITEMaintenance  measurement of new beam tube sectionR. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with
 wall_to_flange_length.pdf 
  637   Friday, April 04, 2014, 14:16 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south west silo to the south hot cell.
  
  636   Wednesday, April 02, 2014, 09:14 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved to the west
target station.
  
  635   Monday, March 31, 2014, 13:22 Bevan MossConditioning StationStandard OperationTM4Ta #42HV conditioning TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but
 31032014_TM4_Ta#42_HV_Conditioning.txt31032014_Ta#42_HV_conditioning.JPG 
  634   Thursday, March 27, 2014, 10:47 Travis CaveConditioning StationStandard OperationTM4Ta#42Electrical checkTM#4 with Ta#42 in the conditioning station
under vacuum electrical check.
 TM#4_Ta42surf_electest_CS.PDF 
  633   Wednesday, March 26, 2014, 08:36 Travis CaveConditioning StationStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from the
south hot cell to the conditioning station.
  
  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4
  
  631   Tuesday, March 25, 2014, 13:29 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 was checked electrically with and
without target on it, see attached PDFs for
details.
 TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF 
  630   Tuesday, March 25, 2014, 09:11 chad fisherSouth Hot-CellStandard OperationTM4Ta#42Ta#42 install and "new" 9 pinTa#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any
 TM4_20140325_01.jpg 
  629   Monday, March 24, 2014, 12:01 Travis CaveITWStandard OperationTM4no targetmodule moveTM#4 has been moved from the west target
station to the south hot cell.
  