  498   Tuesday, October 08, 2013, 14:55 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target was to be moved today
but the move was aborted when the crane failed
to move in the East - West direction. The
  
  497   Tuesday, October 08, 2013, 13:11 Travis CaveSpent Target VaultStandard Operation SiC#29Spent target moveSiC#29 has been moved to the spent target
vault. The target was placed in Pail #109
and placed into slot 2B it was 24.7mS/hr
 Vault_Storage_October_8_2013.pdf 
  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module moveTM#3 has been moved from the conditioning
station to the east target station, move
went well.
  
  495   Sunday, October 06, 2013, 20:28 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2turbo pumps stoppedvacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T
  
  494   Sunday, October 06, 2013, 17:08 Friedhelm AmesConditioning StationDevelopmentTM3NiO#2trip of all power suppliesAll power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice
  
  493   Sunday, October 06, 2013, 15:39 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2HEATERS STARTEDThe high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature
  
  492   Sunday, October 06, 2013, 00:17 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2high voltage conditioninghigh voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro
  
  491   Saturday, October 05, 2013, 14:45 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2vacuum readingsIG1
8.0 e-7 T
  
  490   Friday, October 04, 2013, 19:39 Grant MinorConditioning StationStandard OperationTM3NiO#2TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pmHere is the change in the TCS vacuum after
heaters were turned off earlier today:
2:20 pm readings
  
  489   Friday, October 04, 2013, 19:05 Grant MinorConditioning StationStandard OperationTM3NiO#2HP Conditioning - e-mail notes from Oct 2nd to Oct 4thI have compiled the e-mail comments from
people involved in High-Power Conditioning
of TM3 w/ the new Rev 3 source tray and NiO#2
  
  488   Thursday, October 03, 2013, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south hot cell to the south west silo.
  
  487   Wednesday, October 02, 2013, 14:47 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical checkElectrical check done on TM#4 with no target,
see PDF.
 TM#4_elec_chk_No_Tgt_SHC.PDF 
  486   Wednesday, October 02, 2013, 13:44 Bevan MossSouth Hot-CellStandard OperationTM4 Right Coil is leaking Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the
 tm4leak.jpg 
  485   Wednesday, October 02, 2013, 09:40 Bevan MossConditioning StationStandard OperationTM3NiO#2HP conditioningYesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool
 01102013_TM3_NiO2_TGHT_and_TBHT_ramp_up_eod.txt02102013_TM3_NiO#2_HP_testing_overnight_run.JPG02102013_TM3_NiO#2_HP_testing_overnight_run_archiver.JPG 
  484   Tuesday, October 01, 2013, 11:00 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical checkTM#3 with NiO#2 electrical check at conditioning
station under vacuum, see pdf for details.
 TM#3_elec_chk_NiO#2_CS2.PDF 
  483   Tuesday, October 01, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 electrical check post
beam see pdf for details.
 TM#4_elec_chk_SiC#29_SHC_post2.PDF 
  482   Monday, September 30, 2013, 16:04 Bevan MossConditioning StationRepairTM3NiO#2Ion gauge filament replacement  The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed
  
  481   Monday, September 30, 2013, 16:02 Bevan MossConditioning StationStandard OperationTM3NiO#2Vacuum The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to
  
  480   Monday, September 30, 2013, 16:00 Bevan MossSouth Hot-CellStandard OperationTM3NiO#2Electrical check

    

       
            
  
  479   Monday, September 30, 2013, 15:59 Bevan MossSouth Hot-CellStandard OperationTM4SiC#29Module move from SW Silo to SHC TM4 was move by myself and Grant.
Move went smoothly, no hang ups.
  